Technical Program: Tanks, Tanks and More Tanks “STEEL WATER STORAGE TANK MAINTENANCE” Maine Water Utilities Association Conference No. 490-April 12, 2007 Marcel Payeur Marcel A. Payeur, Inc.
2
Interior Roof Total Coating Failure
4
Interior Roof Total Coating Failure
5
Interior Heavy Corrosion Pit Welding is Necessary
6
Total Coating Failure
7
Weathered Alkyd Coating System - Roof
8
Heavy Corrosion Extremely Small Manway -Was Replaced
10
Winthrop, MA. 1 MG. Prior to Rehabilitation
11
Interior SSPC 10 Near White Blast Grade
14
Interior Complete New Coating System
18
Strip Coat Prior to 2 - Epoxy Coat
19
Exterior new coating, damage due to interior pit welding
21
Interior pit welding damage
22
Exterior new coating damage due to interior pit welding
23
Interior Epoxy Pit Filler After Blasting and Priming
26
Elastomeric Membrane Riveted Tank
27
Finial Vent, New Coating System and Stainless Steel Screen
28
Heavy Corrosion Extremely Small Manway - Was Replaced
29
Old Manway
30
New 18 x 24 Manway Complete Finish Coat
31
New 30” Shell Manway
32
Power Wash Only Sphere
33
Power Wash Only
34
Extensive Power Tool Cleaning
37
1.5 MG Reservoir Extensive Spot Repair Overcoat System No Containment
39
SpotOvercoatSystem
40
400,000 Gallon Sphere Complete Power Wash Spot Clean Overcoat Pedestal Only
41
Power Wash Power Tool Clean Pedestal
42
Spotted Pedestal Power Wash Below Equator
43
Exterior Spot Surface Prep. Overcoat System 300,000 Gallon Elevated Tank No Containment
49
Exterior Spot Surface Prep. Overcoat System 1 MG. Elevated Tank No Containment
50
Power Washing
51
Completed Power Wash
52
CompletedOvercoatSystem
53
10,000 PSI Power Wash
56
Exterior SSPC SP6 Commercial Blast
57
SSPC SP6
58
Gray Zinc Primer Red Epoxy Containment
59
RoboticBlastMachine
60
RoboticBlastMachine
61
RoboticBlastMachine
62
750,000 Gallon Standpipe Full Blast, New Coating System Full Blast, New Coating System Containment is Rigid Monaflex Covering System with Reinforced Polyethylene Membrane
63
Shrink Wrap
64
Partial Containment Work Area Sheeting is Woven Nylon, Silicon Coated
65
Elevated Full Blast New Coating System 400,000 gallon Rigid Containment
67
Shrink Wrap
68
Exterior Full Blast, New Coating System 400,000 gal. Sphere Full Containment Tepe System
70
Standpipe Rigid Pipe with Shrink Wrap
71
Full Containment, Standpipe, Tepe System
72
Sanford, ME.
74
1 MG. Standpipe Full Blast, New Coating System
75
600,000 Gallon Reservoir Full Blast, New Coating System Localized Containment
77
Containment Localized Area Only
82
Localized Area
85
Winthrop Ma. Aerial View Close Proximity of Home
89
Dust Collection 24,000 CFM Negative Air
90
Antennas Important In Agreement With Carriers To Remove Antennas During Maintenance
91
Antenna Supports Antenna Supports
92
Foundation Repair
94
FoundationRepair
95
FoundationRepair
96
Grinding Erection Welds Prior to Blasting or Power Tool Cleaning
98
1.5 MG Elevated Containment Destroyed by 70+ mile per hr. Hurricane Force Winds
103
1 MG. Riveted Standpipe Completed Winthrop, MA.
104
CompletedOvercoatSystem