Florida Product Approval System 2008 Rule 9B-72 Changes Florida Building Commission Florida Department of Community Affairs 2555 Shumard Oak Blvd | Tallahassee, FL 32399-2100 | (850) 487-1824 www.floridabuilding.org
2
Florida Product Approval System Department of Community Affairs Product Approval Team
3
Recent Product Approval Changes Ted Berman and Associates, LLC THEODORE BERMAN, P.E. Product Approval System Administrator SIMON SEGAL, P.E. Assistant Engineer, Product Application Review JESSICA HUPPERT Administrative Officer VERDA LA RUE Product Approval, Process Support Specialist
4
Recent Product Approval Changes Florida Building Code 2007 The 2007 Florida Building Code is now available online. http://www2.iccsafe.org/states/Florida2007FinalDraft/ The Effective Date for 2007 Code is October 1, 2008
5
Recent Product Approval Changes Florida Building Code 2007 There are three ways to have your product comply with the new code Self-Affirmation of existing application Revision of existing application New application
6
Recent Product Approval Changes Self–Affirmation FBC 2007 Application Self Affirmation Upon review of the new Code, if the standards and restrictions in the new Code applicable to your product have not changed, you can “self-affirm” that your product complies with applicable standards of the new Code. Please contact the Product Approval Administrator Ted Berman And Associates before initiating a self- affirmation Self Affirmations cost $50.
7
Recent Product Approval Changes Revision FBC 2007 Application Revision: If the standards or restrictions pertaining to your product in the 2007 Code have changed, then a product revision application must be submitted. New evidence such as a test report or an evaluation report demonstrating compliance must also be submitted. Revisions cost $300.
8
Recent Product Approval Changes Revision FBC 2007 IMPORTANT IF THERE ARE MULTIPLE PRODUCTS WITHIN THE SAME APPLICATION (FL#), THEN EVIDENCE FOR ALL THE PRODUCTS MUST BE SUBMITTED. THE ENTIRE PRODUCT LINE MUST ALSO COMPLY WITH THE NEW STATE PRODUCT APPROVAL RULE AND ALL THE REQUIREMENTS THEREIN
9
Recent Product Approval Changes New Application Process Changes made to the new application process include: There is now ONE COMPLETION DEADLINE There is now ONE COMPLETION DEADLINE No more recommendation for Conditional Approval or Deferral by the Administrator. No more recommendation for Conditional Approval or Deferral by the Administrator. Applicants work at their own pace to complete applications by the posted deadline date. Applicants work at their own pace to complete applications by the posted deadline date. Early submittals will have more correction time if needed. Early submittals will have more correction time if needed. Once validated, Ted Berman and Associates, LLC review the application and email the applicant notifying them of any discrepancies. Once validated, Ted Berman and Associates, LLC review the application and email the applicant notifying them of any discrepancies. Only those applications that are complete and reviewed by the Deadline are recommended to the Product Oversight Committee (POC) and be listed on the meeting agenda Only those applications that are complete and reviewed by the Deadline are recommended to the Product Oversight Committee (POC) and be listed on the meeting agenda
10
Recent Product Approval Changes New Application Process Before submittal, verify the following: Verify that the product is Florida Building Code Compliant Verify that the product is Florida Building Code Compliant Manufacturer’s name on the BCIS matches the name on the Certification Agency Certificate. Manufacturer’s name on the BCIS matches the name on the Certification Agency Certificate. Model size and performance is an exact match with uploaded Certification Agency Certificate. Model size and performance is an exact match with uploaded Certification Agency Certificate. Installation Documents are attached. Installation Documents are attached. On Limitations of use for each model define: use within HVHZ or outside HVHZ; impact, design rating, missile level and any other pertinent information. On Limitations of use for each model define: use within HVHZ or outside HVHZ; impact, design rating, missile level and any other pertinent information. Testing standards and year of standard as certified by Certification Agency. If testing standards are not adopted in the version of the Florida Building Code, an equivalency of standards will be required. Testing standards and year of standard as certified by Certification Agency. If testing standards are not adopted in the version of the Florida Building Code, an equivalency of standards will be required.
11
Recent Product Approval Changes Product Approval Methods Four Methods for State Approval Certification Method Certification Method Test Report Test Report Evaluation Report from an Evaluation Entity Evaluation Report from an Evaluation Entity Evaluation Report from a Florida licensed Architect or a Florida Professional Engineer Evaluation Report from a Florida licensed Architect or a Florida Professional Engineer
12
Recent Product Approval Changes RULE 9B – 72 changes 9B – 72.010 (31) (f)For shutters: Shutters subcategory has been expanded to add fabric storm panel. Shutters subcategory has been expanded to add fabric storm panel. 9B – 72.070 (1)(g)Demonstration of Compliance: Products required to demonstrate compliance using referenced testing standard(s) and also requiring rational analysis that falls outside the scope of the agency certificate designating product certification, must demonstrate compliance using an evaluation report from an approved evaluation entity.
13
Validations 9B-72.080 Product Validation Two Types of Validation Administrative Validation Administrative Validation Technical Validation Technical Validation NOTE: The validation process has been added to Certification Mark or Listing method on the Florida State Product Approval System
14
Administrative Validation Applicable to: A certification mark or listing from an approved certification agency A certification mark or listing from an approved certification agency An evaluation report from a Florida Registered Architect or Licensed Engineer independent from the manufacturer An evaluation report from a Florida Registered Architect or Licensed Engineer independent from the manufacturer An evaluation report from an approved evaluation entity (i.e. ICC) An evaluation report from an approved evaluation entity (i.e. ICC)
15
Recent Product Approval Changes Administrative Validation Criteria Criteria consists of: Criteria consists of: Verification of certification, certification agency status, product description, testing standards per Florida Building Code and compliance documentation with the current code. Verification of certification, certification agency status, product description, testing standards per Florida Building Code and compliance documentation with the current code. Verification of installation instructions, anchorage requirements and product performance under certification. Verification of installation instructions, anchorage requirements and product performance under certification. Verification of any limits of use included as certified and use of rational analysis within the scope of certification Verification of any limits of use included as certified and use of rational analysis within the scope of certification
16
Administrative Validation Checklist
18
Administrative Validation Overview
19
Technical Validation Applicable to: A test report from an approved testing laboratory A test report from an approved testing laboratory An evaluation repot from an approved evaluation entity that is not an independent third party from the manufacturer An evaluation repot from an approved evaluation entity that is not an independent third party from the manufacturer
20
Recent Product Approval Changes Technical Validation Criteria In addition to criteria for Administrative Validation, Technical validation includes: In addition to criteria for Administrative Validation, Technical validation includes: Determination that the evaluator has complied with acceptable standards of engineering principles. Determination that the evaluator has complied with acceptable standards of engineering principles. Engineering verification that the evaluation complies with the Code. Engineering verification that the evaluation complies with the Code. Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission. Copy of the application complying with all aspects of rule 61G15-36 F.A.C. must be filed with the Commission.
21
Technical Validation Checklist
23
Technical Validation Overview
24
Installation Instructions Installation instructions also require validation: If prepared by company engineers then technical validation is required If prepared by company engineers then technical validation is required If prepared by independent engineers then administration validation is required If prepared by independent engineers then administration validation is required
25
Recent Product Approval Changes Installation Instructions Installation instructions criteria: Determination that the evaluator has complied with acceptable standards of engineering principles. Determination that the evaluator has complied with acceptable standards of engineering principles. Engineering verification that the evaluation complies with the Code. Engineering verification that the evaluation complies with the Code. Copy of the application complying with all aspects of rule 61G15- 36 F.A.C. must be filed with the Commission. Copy of the application complying with all aspects of rule 61G15- 36 F.A.C. must be filed with the Commission. Exception: Exception: Technical Validation is not required if the installation instructions including attachments are verified by the product certification agency or the product evaluation agency. Technical Validation is not required if the installation instructions including attachments are verified by the product certification agency or the product evaluation agency.
26
Windows Installation instructions requirements for windows must contain the following: Type, and grade of anchor, and/or manufacturer’s anchor specifications, including minimal nominal size, minimum penetration into substrate and minimum edge distances. Type, and grade of anchor, and/or manufacturer’s anchor specifications, including minimal nominal size, minimum penetration into substrate and minimum edge distances. Type, physical dimensions, material and grade of any accessory item or strap, if applicable. Type, physical dimensions, material and grade of any accessory item or strap, if applicable. Spacing of anchors, shims, accessory items and straps. Spacing of anchors, shims, accessory items and straps. Illustrated diagrams of the attachment of the product structure. Illustrated diagrams of the attachment of the product structure.
27
RULE 9B – 72 Optional State Approval with updates
28
Validation Entities All approved Validation Entities must retain documentation of the product application All approved Validation Entities must retain documentation of the product application Testing Labs are not allowed to conduct validations Testing Labs are not allowed to conduct validations
29
Quality Assurance Expiration For all the methods of compliance, including the certification Mark or Listing Method, a new field is added to collect the Expiration Date of the Quality Assurance Entity Contract on Page 3 of the application For all the methods of compliance, including the certification Mark or Listing Method, a new field is added to collect the Expiration Date of the Quality Assurance Entity Contract on Page 3 of the application An email is sent to the Manufacturer with a copy to DCA when the Expiration Date has elapsed. An email is sent to the Manufacturer with a copy to DCA when the Expiration Date has elapsed. Search criteria on the Product Search webpage allows searching for expired Quality Assurance Entity Contracts. Search criteria on the Product Search webpage allows searching for expired Quality Assurance Entity Contracts.
30
BCIS Homepage New order of compliance method
31
BCIS Homepage New validation for certification method
32
BCIS Homepage New QA contract expiration date
33
BCIS Homepage New evaluation by third party/rational analysis criteria
34
Florida Building Code 2007 Important Code Changes Products to be Labeled: Exterior Windows and Glass Doors Garage Doors, Skylights
35
Recent Product Approval Changes Skylights(1714.5.2.1.1), Exterior Windows And Glass Doors(1714.5) Skylights, Exterior Windows and Glass Doors Required Labels: Permanent Label Temporary Label
36
Recent Product Approval Changes Skylights(1714.5.2.1.1), Exterior Windows And Glass Doors(1714.5) Permanent Label: Permanent label is a label that cannot be removed without noticeable damage: It is limited to one design pressure rating per reference standard per label. Permanent label shall identify: the manufacturer performance characteristics Product’s model/series number Approved product certification agency, testing lab, evaluation entity or Miami-Dade Product Approval to indicate compliance with the relevant standards
37
Recent Product Approval Changes Skylights(1714.5.2.1.1), Exterior Windows And Glass Doors(1714.5) Temporary Supplemental Label: Temporary Label has to be printed and supplied by the manufacturer and shall identify: the manufacturer products model/series number, positive and negative design pressure rating, products maximum size, glazing thickness, indicate impact rated if applicable, Florida Product Approval number or Miami-Dade Product Approval number if applicable, and applicable test standard. The supplemental label is limited to one design pressure rating per reference standard per label.
38
Recent Product Approval Changes Skylights(1714.5.2.1.1), Exterior Windows And Glass Doors(1714.5) NOTE: PERMANENT LABEL SHALL BECOME THE DEFAULT IF THE TEMPORARY LABEL IS MISSING OR NO LONGER LEGIBLE
39
Recent Product Approval Changes 1714.5.3.4 Garage Door Labeling Garage Door Permanent Label shall identify the manufacturer, garage door model/series number, the positive and negative design pressure rating, indicate impact rated if applicable, the installation instruction drawing reference number, Fl. Product Approval number or Miami-Dade Product Approval if applicable, and the applicable test standards. Label may also contain in a checklist format required garage door components for an approved garage door assembly.
40
1714.8 Impact- Resistant Coverings 1714.8.3 Location of Label: Accordion: Bottom of locking bar or center mate facing exterior Permanent Label is required. 1714.8.2 Following information to be included on the label: Product approval name and address Methods of approval e.g. FBC, Miami-Dade (M-D), TDI Evaluation and ICC-ES Applicable standards For FBA and M-D, the FL # or the NOA #
41
1714.8 Impact- Resistant Coverings 1714.8.3 Location of Label: Rollup: On the bottom of the hood facing the exterior or on the bottom slat facing the exterior or outside Bahama Awning or Colonial Hinged: On the bottom, placed on the back of the shutter. Panels: For metal and plastic panels the label may be embossed or printed spaced not more than every three lineal feet on each panel. The label shall be applied by the holder of the product approval and shall face the exterior. Framed products: The label shall be on the side or bottom facing the exterior. Labels on all other products shall face the exterior.
42
1714.8 Impact- Resistant Coverings 1714.8.4 Installation: In accordance with manufacturer’s instructions, which shall be provided and be available to inspectors. Opening protection components including fasteners evaluated by an approved authority may be interchangeable if they provide equal or greater structural performance and durability
43
F.A.Q.’s I have a new product that meets 2004 and 2007 codes, which code do I apply for? Apply for 2004 and self-affirm for 2007 The person with authorized signature on the application no longer works for us? What do I do? If you are going to self-affirm, you can first submit an editorial revision. If you are going to revise anyway, you can change the authorized signature with the revision
44
F.A.Q.’s I lost my username and password? Contact Department of Community Affairs with an email from either the email registered with the application or from the President or Vice-President of the Company The page loads with an error? What do I do? Norton / Symantec Firewalls do not like your Product to be approved. Turn the Firewalls off.
45
F.A.Q.’s I am submitted an entity application but I need to change something, can I do it? If the status of your entity application is “pending accreditation”, you can still make changes to your application.
47
Mo Madani Department of Community Affairs Codes and Standards mo.madani@dca.state.fl.us 850.921.2247 (p) | 850.414.8436 (f)