Download presentation
Presentation is loading. Please wait.
Published byAngela Long Modified over 9 years ago
1
DRAFT 06.03.09 Madison Valley Stormwater Project Phase 2 Seattle Design Commission June 4, 2009 Seattle City Hall Boards and Commissions Room, L2-80
2
DRAFT 06.03.09 Three Stormwater Pipeline Alignment Options Baseline Open-Cut Trenchless
3
DRAFT 06.03.09 Selected Stormwater Pipeline Alignment = Proposed shaft location = Stormwater pipeline
4
DRAFT 06.03.09 Construction Boundaries in Washington Park
5
DRAFT 06.03.09 Existing Conditions in Washington Park Looking toward southwest corner of Washington Park Mixed-use building on E Madison St E Madison St streetscape Batting cage and south slope from lower lawn View down into site from E Madison St
6
DRAFT 06.03.09 Conceptual Landscape Plan
7
DRAFT 06.03.09 Conceptual Landscape Details BALUSTRADE / ORNAMENTAL RAILING Concrete or Cast Stone Balustrade Metal Railing on Low Wall Metal Railing on Curb
8
DRAFT 06.03.09 Conceptual Landscape Details EXISTING STORAGE TANK FACADE Natural Stone Shotcrete Stone Work in Washington Arboretum Stone Veneer Synthetic Stone Stone Façade on Tank Overlook with Ornamental Railing Upper Lawn Rain Garden and Drainage Grate Sunken Lawn Meadow with Wooded Hillside Beyond
9
DRAFT 06.03.09 Preliminary Tree Preservation Plan
10
DRAFT 06.03.09 Project Schedule
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.