1 Leon County Board of County Commissioners Killearn Lakes Sidewalk Construction and Traffic Calming Kinhega Drive and Deer Lake Road
2
2 CONSTRUCTION SCHEDULE Estimated Construction Time for the entire project is 9 to 12 months. The Sidewalk Construction started in front of the Deer Lake Middle School and will continue on Deer Lake Road. Construction activities are generally within two 1,000-foot segments at a time if a second crew can be added. The construction work in front of the Killearn Lakes Elementary School will be scheduled when the school is not in session.
3
3 LOCATION MAP
4
4 SCOPE AND INTENT OF THE IMPROVEMENTS Add Sidewalks on one side of the Deer Lake Road and Kinhega Drive, and Pedestrian Crossings. Improve Safety and Function while preserving existing trees, wetlands, and character. Add Bike Lane Pavement Marking and Signage to both sides of the road. Reduce the vehicular travel lane width to encourage slower running speeds.
5
5 MAINTENANCE OF TRAFFIC
6
6 MOT EXAMPLE DURING CONSTRUCTION
7
7 POST IMPROVEMENTS TYPICAL PLAN REVIEW
8
8 TYPICAL SECTIONS
9
9 EXAMPLE BIKE LANE AND SIDEWALK AFTER CONSTRUCTION
10
10 EXAMPLE PEDESTRIAN CROSSING
11
11 CONTACT INFORMATION If you have any questions about this Project, please contact Leon County Public Works at 606-1500.