ALEXANDRA RENEWAL PROJECT

Similar presentations


Presentation on theme: "ALEXANDRA RENEWAL PROJECT"— Presentation transcript:

1 ALEXANDRA RENEWAL PROJECT
PRESENTATION

2 BACKGROUND Alexandra Renewal Programme started in 2001
A number of documents were developed even before the ARP, In 1998 for instance 3 Volumes of Greater Alexandra Development Framework were developed by the Eastern Metropolitan Local Council On the 2&3 December 2004 a Summit was held to review the ARP and it dealt extensively on Allocation and Relocations issues The life of the ARP officially came to an end in March 2011 The programme was extended recently by the Provincial Government.

3 BACKGROUND A political pronouncement was made by the MEC for Local Government and Housing, but no formal commitment could be obtained. The Alexandra Renewal Project (ARP) was established to upgrade the living conditions and human development potential through the creation of integrated and functional settlements. Focus is on implementing solutions that would address the social, economic and infrastructure challenges and not only housing challenges.

4 BACKGROUND The Provincial Department of Local Government and Housing, and City of Johannesburg are jointly spearheading the project. ARP is accountable to both structures politically and administratively, and therefore the budget comes through these 2 departments.

5 Key Achievements: 2001 to Date HOUSING DEVELOPMENT
8 500 families relocated out of Alexandra 1 400 housing units built within Alex Alex Transit Village built (550 units) Marlboro Transit Village upgraded M2 (Nobuhle) Hostel Upgrading Phase1 Ext 7 Housing ( 1400 units) 520 rented rooms – Botlhabela village Emergency housing facility Marlboro Flats (50 units) Ext 9 (K206) – units Ext units

6 Key Achievements 2001 to Date PHYSICAL INFRASTRUCTURE DEVELOPMENT
London Road widened Ext 7 Pedestrian Bridge Vasco Bridge London Road bridge upgraded Electricity supply upgrade and connections Wynberg/Pan Africa intersection Spatial Framework developed Upgrading of water mains 10km of road in Old Alex upgraded 3km of road on East Bank surfaced Spatial Framework developed Upgrading of water mains Construction of water reservoir Outfall sewers upgraded waste bins distributed 3km of road on East Bank surfaced Jukskei Park Pedestrian Bridge

7 Key Achievements 2001to Date PHYSICAL INFRASTRUCTURE DEVELOPMENT (Cont)
Construction of water reservoir Outfall sewers upgraded waste bins distributed 9km sidewalk upgrading Upgrading of existing cemeteries 15km road build and upgrade 9km sidewalk upgrading 15km road build and upgrade 9km sidewalk upgrading Upgrading of existing cemeteries 15km road build and upgrade

8 Key Achievements 2001 to Date COMMUNITY FACILITIES DEVELOPMENT
ATV Storage Facility Diepsloot Multi Purpose Centre Phase1 –Kwa Bhekilanga Altrek Sports Facility Upgrading Athletic/Rugby Facility Alex Stadium Alexandra Police Station upgraded (Wynberg) New Alex central police station built People Centre Built All 18 Schools upgraded Alexandra Development Forum established

9 Key Achievements 2001 to Date SOCIAL DEVELOPMENT
Teachers Training and Resource Centre Ekukhanyisweni Primary School Gordan Primary School All clinics upgraded Crèche converted into child and family resource centre Edenvale HIV/Aids Support Clinic Edenvale Pharmacy Edenvale Outpatients Helipad Bombani Safe House East Bank ECD facility River Park Library History of Alexandra (Book Published)

10 Key Achievements 2001 to Date ECONOMIC DEVELOPMENT
Wynberg City improvement District established Economic clusters developed & set-up (retail, auto, construction) Tourism Hub Business Place Operational Auto Hub Operational Pan Africa Mall Pan Africa Taxi Facility Green Economy (2 Cooperatives Successfully Set-up for Re-cycling & Manufacturing)

11 Key Achievements 2001 to Date ENVIRONMENTAL DEVELOPMENT
Jukskei River Open Space: Phase 3 Greening of Far East Bank ext. 8 3 500 trees planted 2 community Parks 2054 trees planted Phase 3 Jukskei park River Bank Protection Storm water kerb inlets upgraded (120) Phase 1 Yard ablutions upgraded 91% Environmental compliance in projects

12 HOUSING Ext 9 (K206) 1229 RDP (give-away) housing units 1695 Affordable rental units

13 HOUSING Ext RDP houses

14 HOUSING Eastbank 520 Affordable rental units

15 HOUSING Marlboro 50 RDP flats

16 HOUSING M2 Hostel 98 Social housing Affordable rental units

17 HOUSING Ext RDP houses

18 HOUSING Riverpark 870 RDP houses

19 HOUSING Old Alex 350 Social housing units

20 GENERAL INFRASTRUCTURE
Vasco Bridge

21 CURRENT PROJECTS Infrastructure/housing:
Complete allocations of Ext 9 (K206) where currently the block-by-block approach is used. To date 1299 Primary units and 1665 rental units have been allocated; Completion of the social Cluster homes in Ext 7; Completion of Ext 10 (1 057 units); River park rental housing (450 units); Linbro Park – planning and design; Continuation of Electrification; Construction/upgrading of Hostels and development of the hostel precinct: * M2 Phase units * M2 Phase units * Helen Joseph Ext units (Planning & Design) * Ext 31 (84 units as part of M1 hostel redevelopment)

22 CURRENT PROJECTS… Social: Economic:
- Construction of the Mental health clinic - Alex Hospice - Cleaning & Development of the Iphutheng school precinct Economic: - Construction of the Shared Industrial Production Facility (SIPF) - Development of the Tourism hub - Linear markets - Development of Retail & Office Block

23 FUTURE PROJECTS Infrastructure/housing:
- Land acquisition and construction of units in Linbro Park; - Upgrading and installation of engineering services, electricity, storm water and sewer upgrading in the new developments; - Lombardy West BNG flats; - Mixed use development in Marlboro.

24 FUTURE PROJECTS… Social: - Thoko Mngoma clinic; Economic:
- Riverpark Multi purpose centre – clinic and retail space Economic: - Alexandra Commercial square; - Private sector investment – Hotel; - Thohoyandu Alex guest project

25 ARP CHALLENGES The life span of the ARP - Creates instability
- Housing allocation challenges - New developments - Economic and social challenges Funding – insufficient budget Long administrative processes e.g. SCM Alexandra land restitution Frankenwald land matter

26 ARP CHALLENGES… POLITICAL ENVIRONMENT IN ALEX:
The ARP finds itself inundated with having to answer to community petitions and balancing different group interests. This includes getting preemptive court orders to protect developments from invasions by political groups. Orchestrated marches and unrest

27 THANK YOU!!