1
Contact: Beth Morris 317-638-9432 beth@westindydev.org
2
Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes: Continuous pedestrian and bicycle connections along Morris Street between the future Eagle Creek and White River Greenways Improved sidewalks, street trees, medians and crosswalks at key intersections; Curb bump-outs and planters to define parking zones and reduce crosswalk width; Alternative stormwater management practices; GOALS
3
Morris Street Complete Street Plan The Morris Street Complete Street Plan proposes: Enhanced transit stops; Bicycle connection to the White River Greenway trailhead to be constructed in 2011 at I-70 and Kentucky Avenue; Rerouting truck traffic and the reallocation of travel lanes to allow bicycle and pedestrian facilities within existing right-of-way; and Purchase of right-of-way (or donation) from major institutions such as IPL to incorporate pedestrian accommodations and minimize the removal or relocation of major utility poles GOALS
4
Morris Street Complete Street PlanCONTEXT Alternate truck routes: From the west: exit I-70 at Holt Road. Exit/use Tibbs Avenue From the north: use Washington Street (W) or Oliver Ave (E) From the east: use Kentucky Ave South: use Minnesota / Kentucky Ave
5
Morris Street Complete Street PlanKEY PLAN Key Transitions: 1 – Eagle Creek Greenway Gateway: gateway node; connect bicycles and pedestrians to greenway system 2 – Tremont Street Gateway: transition from multi-use path to separated bike sharrow and sidewalk 3 – Belmont Village Mixed-Use Center Gateway: transition from 4 lanes to 2 lanes with dedicated parking 4 – Harding Street Intersection Gateway: improved pedestrian connectivity to Health Center and reasonable accommodation for WB50 trucks 5 – Kentucky Avenue Gateway: vehicular lane transitions, transition from bike sharrow to multi-use path 6 – White River Greenway Gateway: gateway node; extend bicycle and pedestrian facilities over the bridge
6
Morris Street Complete Street PlanKEY PLAN Neighborhood Commercial District Visualization on-street parking tree lawns where space allows improved and widened sidewalks where space allows re-routed truck traffic street furnishings: light fixtures, banners, improved transit shelters, benches
7
Morris Street Complete Street PlanIDENTITY ELEMENT CONCEPTS Identity Element Concepts identity logo enhanced bus shelters decorative street lights gateway features sitting nodes, wayfinding signage, bollards
8
Morris Street Complete Street Plan1 - EAGLE CREEK GREENWAT GATEWAY CONCEPT
9
Morris Street Complete Street Plan2 – TREMONT STREET GATEWAY CONCEPT
10
Morris Street Complete Street Plan3 – BELMONT VILLAGE MIXED-USE CENTER CONCEPT
11
Morris Street Complete Street Plan4 – HARDING STREET GATEWAY INTERSECTION CONCEPT: ROUNDABOUT * * see geometric plans for conventional intersection option
12
Morris Street Complete Street Plan5 – KENTUCKY AVENUE GATEWAY CONCEPT
13
Morris Street Complete Street Plan6 – WHITE RIVER GREENWAY GATEWAY CONCEPT
14
Contact: Beth Morris 317-638-9432 beth@westindydev.org THANK YOU! Preliminarily Geometric Layout Plans available
15
Morris Street Complete Street Plan1 - GEOMETRIC LAYOUT PLAN: Eagle Creek to Warman
16
Morris Street Complete Street Plan2 - GEOMETRIC LAYOUT PLAN: Warman to Bedford Street
17
Morris Street Complete Street Plan3 - GEOMETRIC LAYOUT PLAN: Bedford to Tremont Street
18
Morris Street Complete Street Plan4 - GEOMETRIC LAYOUT PLAN: Tremont Street to Sheffield Ave
19
Morris Street Complete Street Plan5 - GEOMETRIC LAYOUT PLAN: Belmont Intersection
20
Morris Street Complete Street Plan6 - GEOMETRIC LAYOUT PLAN: Kappes to Shepard St
21
Morris Street Complete Street Plan7 - GEOMETRIC LAYOUT PLAN: Shepard to Reisner Street
22
Morris Street Complete Street Plan8a - GEOMETRIC LAYOUT PLAN: Harding Street Roundabout Option
23
Morris Street Complete Street Plan 8b- GEOMETRIC LAYOUT PLAN: Reisner to Harding Street: Conventional Intersection
24
Morris Street Complete Street Plan9 - GEOMETRIC LAYOUT PLAN: Harding to Railroad Overpass Conventional Intersection
25
Morris Street Complete Street Plan10 - GEOMETRIC LAYOUT PLAN: Division Street Intersection
26
Morris Street Complete Street Plan11 - GEOMETRIC LAYOUT PLAN: Division to Kentucky Ave
27
Morris Street Complete Street Plan12 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Intersection
28
Morris Street Complete Street Plan13 - GEOMETRIC LAYOUT PLAN: White River Parkway W Intersection
29
Morris Street Complete Street Plan14 - GEOMETRIC LAYOUT PLAN: White River Parkway E Intersection
30
Morris Street Complete Street Plan 15 - GEOMETRIC LAYOUT PLAN: Kentucky Ave Bike Lanes to Greenway Trailhead
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.