Download presentation
Presentation is loading. Please wait.
Published byBrett Holt Modified over 10 years ago
1
Pre-application Workshop 1
2
Training Agenda Introductions Program Background Why we need SR2S Local Programs Idaho SR2S Guidelines and Application Federal Aid and Reporting Requirements Application Deadlines Questions 2
3
Background Congress funded SR2S in 2005 SAFETEA-LU Make walking and bicycling to school safer and routine for K-8 Grade SR2S = 5 E’s Education Encouragement Engineering Enforcement Evaluation 3
4
Fewer Kids Walking and Biking Kids walking to school dropped 23% -1969 2001- Kids living 2 miles went from 25% to 60% Source: CDC 2005 and National Household travel survey 4
5
Top 4 reasons National Center for Safe Routes to School Parent Surveys #1-Distance 62% #2- Traffic danger 30% #3- Adverse weather 19% #4- Crime 12% 5
6
Community Design Land use patterns have become spread out and disconnected ß Suburban pattern àTraditional town site Drawing by Duany Plater Zyberk, in ITE Journal 1989;59:17-18 6
7
School Location - Neighborhoods Eagle Idaho Site boundary ½ mile walking radius 1 mile walking radius Original Eagle School site 7
8
Consequences - Inactive Lifestyle Inactivity contributes to rising health complications 30 hrs of TV or screen time per week average = 4hrs per day Kids need 60 minutes of moderate activity per day Shorter lifespan than any generation before 8
9
Youth Overweight Rates Tripled past 40 years (National Center for Health Statistics)
10
Low Activity = Higher Obesity Childhood Obesity is reaching epidemic proportions = increased Type II Diabetes Source: Surface Transportation Policy Partnership, Mean Streets 2000 Health impacts of low activity 10
11
Consequences - Air Quality and Congestion Congestion at schools is worsening up to 25% of peak hour trips are created by parents driving kids to school = increases of asthma and other chronic respiratory diseases. 11
12
Consequences Air Quality 1996 Summer Olympic Games banned single occupant cars in downtown Atlanta Morning traffic – 23% Peak ozone – 28% Asthma-related events for kids – 42% (Journal of the American Medical Association [JAMA], 2001) Atlanta, GA 12
13
SR2S National movement to reverse this trend Idaho receives $1 million per year Fund projects ranging from $1,000-$100,00 projects since 2007 10-30% Primarily Education & Encouragement programs 70-90% Engineering improvements Partnerships essential 13
14
Benefits of SR2S Projects Reduce congestion around school Transportation cost savings for schools Encourages healthy habits Teaches bicycle and pedestrian skills Makes better drivers 14
15
Idaho Funded Projects Sandpoint Coeur d’Alene Priest River Troy Kooskia Moscow Nampa Boise Idaho Falls Ririe Wilder Lewiston American Falls Ucon Grace New Plymouth Rathdrum Iona Emmett Rockland St. Anthony Rexburg Aberdeen Jerome Potlatch Mountain Rides TA Middleton Malad Dayton Hailey Bellevue Ketchum Ada County Highway District Driggs 15
16
All costs must directly support goals of the program Eligible Sidewalk Paint upgrades Sign upgrades Multi-use pathways School zone flashing beacons Bike racks Education materials Safety equipment Coordinator salaries Encouragement incentives Ineligible Paid advertising Individual large prizes e.g. bikes Landscaping Law enforcement Crossing guard salaries Prizes or gifts that have not been preapproved 16
17
Non-Infrastructure projects– Bonneville School District #93 Parent lead Walking School Bus Student Safety Patrol International Walk to School Day District wide District #93 and #91 17
18
Boise School District & YMCA Largest non- infrastructure project 39 schools Steering committee meets every other month ACHD, School District, DEQ, Boise Police Department, PTO, School Principals Treasure Valley Cycling Alliance 18
19
The bike rodeo…90 minutes Treasure Valley Cycling Alliance Street Smart Cycling The layout Six stations 1.Bike check 2.Helmet fitting 3.Rules of the road 4.Starting, signaling, stopping, turning (on- bike) 5.Straight line riding and scanning (on-bike) 6.Healthy treats/parents station 19
20
SR2S Application Planning 3E’s Education Encouragement Evaluation 2E’s Engineering optional Enforcement encouraged Well planned projects can hit the ground running! 20
21
Lewiston’s Program Started in 2007 - McGhee Elementary 2008 – Centennial Elementary and the Boys & Girls Club 2009 – McSorley Elementary 2010 – SR2S Coordinator hired Today 7 schools focus – encouraging students to walk and bike, parents to allow students to participate, and educate drivers on traffic laws in school zones 21
22
FY 2009 and 2010 – Burrell Avenue – Centennial Elementary and Boys & Girls Club $50,000 for sidewalk $5,000 for Non-infrastructure SR2S constructed 1/4 mile sidewalk; City constructed 1/4 22
23
Moscow’s Polar Walk- February “Morning Laps”- all can participate Parents serve Hot cocoa 23
24
Helmet Use for Brain Safety WSU Speech and Language Professor, Amy Meredith, presents brain and bike safety education in classrooms and helmet fitting on Walk and Roll days. 24
25
Fill the Racks- May Bike Month 25
26
University of Idaho Graphics Design Student Intern 26
27
Application Summary Sheet - P.1 Who is the sponsor? How many schools altogether? How many total students will be reached? What is the average walking distance? How many of students living within walking distance? What are the project goals for walking and biking? Title-Infrastructure must be the location of project? Brief project description 27
28
Application Summary P.1 Continued Funding Amount Requested Maximum infrastructure $100,000 Maximum non-infrastructure $50,000 How much of total for coordinator position? List years previously funded and total awarded? One original and one photo copy- no staples please! 28
29
Contact/Sponsor Information- P.2 Who can I contact for questions about the application? Federal Identification Number if you have one ○ Metropolitan Planning Organization - Letters ○ Funding commitment - Reimbursement ○ Progress reports - Required ○ 5EAP - Required ○ Will non-infrastructure be a stand alone project if only part funded? Sponsor certification statement- ○ Agree to pledge funds to the project ○ Enter into State/Local Agreement ○ Comply with Title VI Equal Employment Opportunity employer requirements for Federal-Aid projects NO match, NOT a grant REIMBURSEMENT program 29
30
Application Section 1-P.2 Why is active transportation a priority? School Site Assessment Form ○ Know what the issues impeding active transportation choices ○ Create an inventory of the school site and surrounding streets ○ Look at issues that arise during school arrival and dismissal times ○ “Appendix J” of SR2S guidelines 30
31
Application Section 2- P.3 Partnerships and Stakeholders Decision makers and local leaders ○ School principal, city leaders, law enforcement, bicycle and pedestrian advocates, health care, and local transportation agencies People who can commit local resources to making it possible for students to walk and bike to school What is their role? ○ Are they actively involved in some capacity or serve on the school task force Have partners help conduct school site assessments to help them understand the issues Provide letters of support, at a minimum get signatures 31
32
Application Section 3 P.5 Public input process What kind of outreach has been conducted to involve the public and garner community support How do you plan to inform the public about the future planned project Are there local policies that support connectivity What has already been accomplished 32
33
Application Section 3- P.6 Identify existing safety measures already in place Identify existing Health and Wellness policies in place at participating schools 33
34
Application Section 4 P.6 School arrival and dismissal procedures Existing policies Planned changes Pedestrians Bicyclists School buses Private vehicles Current traffic counts- Local Highway Technical Assistance Council (LHTAC) Will the SR2S project help to fix current issues? 34
35
Application Section 5 P.7 Identify current barriers to active transportation Prioritize list of items here H-M-L Provide details on at least top three High priorities Use School Site Assessment form from guidelines 35
36
School Site Assessment Sidewalks and Bicycle Facilities Student pick-up and drop-off areas Bus Loading Zones Visibility (adjacent to school site) Traffic Signs, Speed Control, Signals, and Pavement Markings 36
37
Application Section 6- P.8-12 5E’s of SR2S Suggested, but not limited to, list of strategies that can be used to address the issues identified in Section 5, to help achieve the goals established in Section 1 Use worksheets to illustrate the following: Issue, Strategy, Action Item, Responsible Party, Timeframe Worksheets are expandable to allow detail and combine to create the 5E Action Plan (5EAP) Example completed worksheet in the guidelines P. 14
38
5EAP Encouragement : Organize a special walking event Plan the first Wednesday of October every year Register your school www.walktoschool.org 1-3 mths www.walktoschool.org Send home flyers, hold assembly: 1-3 mths Get public officials involved: 1-3 mths Required to have two special events fall and spring 6-9 mths PTA/PTO names 38
39
International Walk to School Day Get officials involved! 39
40
Application Sections 7& 8 7: School Data How was date collected? How many students on free or reduced lunch, what’s the average community income? How are students getting to school? 8: Task Force Small steps-success that can be duplicated 40
41
Section 9 Maps Make color maps of your choice to show the walking and biking attendance boundaries Aerial photos must be provided for infrastructure proposals Show any relevant information that will help the SR2SAC understand the situation Use Google Maps to show the preferred walking and biking map routes or aerial photos http://maps.google.com/ http://maps.google.com/ Instruction through an easy tutorial on how to create custom Google maps is available on YouTube. http://www.youtube.com/watch?v=ADbeCHQLUpk&feature=channel http://www.youtube.com/watch?v=ADbeCHQLUpk&feature=channel 41
42
Application Section 10 Cost Estimate for Non-Infrastructure Local coordinator funding- wage, benefits, stipends Educational materials, Encouragement incentives, Special Event costs Indirect cost requests must be accompanied by a letter from the organization's accountant Appendix I-Coordinator’s role and work plan, supervisor name and what kind of services will they need Timesheets must be submitted with the supervisor’s signature for reimbursement 42
43
Bike Helmets Donna M. Vasquez Bike/Ped Grants/Contracts Officer Phone(208) 334-8102 Fax (208) 334-4430 Office of Highway Safety Idaho Transportation Department Local business 43
44
Infrastructure Sections 11-12 11:Types of engineering improvements Appendix II Maintenance Utilities, Project design Jurisdictional feedback 12:Cost Estimate Appendix III ○ Sidewalk/Multi-use path Appendix IV ○ Crosswalks ITD Forms 0166 Concept Report 0211Environmental Checklist 44
45
Roadway Prism ROADWAY PRISM DEFINITION For the purpose of this manual, the roadway prism is defined as the portion of the graded roadway upon which the sub-base, base, surfacing, pavement, shoulders, curb, sidewalks, median or other incidental facilities that are constructed on the National Highway System (NHS). If the project is constructed off of the NHS the roadway prism excludes curb, gutter and sidewalks. Local roads can use local or ISPWC standards if not impacting roadway prism ITD standards must be used on state highways Work outside of the roadway prism off a state highway it excludes the curb, gutter and sidewalk 45
46
Federal-Aid Project Requirements All projects must follow Title 23 rules and regulations State/Local Agreements Authorization to proceed prior to incurring costs, etc. Davis Bacon prevailing wage rates Comply with Title VI Equal Opportunity Employer provisions and ADA (Americans with Disabilities Act) Materials Phase Reports Cultural & Historical Reports Cat Ex ADA http://safety.fhwa.dot.gov/saferoutes/guidance/ 46
47
Infrastructure Project Requirements Work must be competitively bid regardless of cost, local agencies cannot do the work themselves (no Force Account) Competitive bidding, even for projects not located within the right-of-way of a federal-aid highway 30 days to advertise after authorization is given Pre-project conference with ITD District contacts Page 35 guidelines See SR2S Project Manual at : www.itd.idaho.gov/sr2s/Tools www.itd.idaho.gov/sr2s/Tools 47
48
Obligation V Award & P.S.&E. Awarded projects are not funded until they are actually obligated To obligate a complete Plans, Specifications and Estimates Package (PS&E) must be approved by ITD PS&E is due to ITD HQ by October 1 Once approved the sponsor has 30 days to advertise the project Fiscal Year 13 projects are due October 1, 2012 First reviewed by ITD Districts, so they need 1-2 months to review and catch issues that would cause it to be rejected at Headquarters 48
49
SR2S 5E Action Plans (5EAP) Each of the issues identified in Section 6 must have the following Strategy Description Action Item Responsible Party Timeframe Status 5EAP Worksheets submitted with the application Updated periodically as the project develops Working document that helps demonstrate what the project accomplished 49
50
Non-Infrastructure Reimbursement Prior approval to purchase goods or services Provide proof of payment and invoice 2 Progress reports on non-infrastructure projects with the 5E’s Action Plan updated 2 Newsletters per year 1 Final report summary with the 5E’s Action Plan If we have a “Failure to Communicate” will mean no reimbursement until repots are submitted 50
51
Nampa Monthly Newsletter 51
52
Evaluations Why do we need to evaluate? NCSRTS Surveys Parent surveys Student surveys Directions on how and when to distribute the surveys at: http://www.saferoutesinfo.org/resources /index.cfm http://www.saferoutesinfo.org/resources 52
53
Application Deadlines Infrastructure projects March 1, 2011 ITD District office Environmental and Concept Report ITD HQ by March 31,2011 Non-infrastructure only projects Must be submitted March 31, 2011 to ITD HQ 53
54
Essential Elements of a SR2S Application Read the Guidelines Answer Application questions completely Good partnerships High potential to increase walking and bicycling Demonstrate realistic 5E’s Action Plan 54
55
National Resources National Center for Safe Routes to School (NCSRTS) On Line Training www.saferoutesinfo.org www.saferoutesinfo.org National Partnership for Safe Routes to School (NPSRTS) w.saferoutespartnership.org 55
56
First Lady’s “Lets Move” Initiative "We’re working to get more nutritious breakfasts and lunches and snacks into school lunchrooms so that you have more fresh fruits and vegetables in school and less sugar, fat and salt. We’re trying to get kids to exercise more every day –- at recess, at gym, and by walking and biking to school and maybe doing some more stuff at home." 56
57
Regional Training ITD (HQ) D3 November 30, Boise and January 20. ITD D4 December 2, Twin Falls ITD D2 December 7, Lewiston ITD D1 December 9, Coeur d'Alene ITD D5 December 14, Pocatello ITD D6 December 16, Idaho Falls 57
58
Idaho Safe Routes to School Tips for a successful application: Page 9 of the guidelines! One original and one photo copy. Please call or email with questions, thank you. 208-334-4475 Question time 58
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.