Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center
2
Presentation Agenda Project Categories Contract Types Project Overviews – Capacity – Resurfacing – Bridge – Operational – Enhancement Sidewalk Trail Landscaping CEI
3
Project Categories State Priorities Local Priorities Enhancements Transit Aviation
4
Project Categories State Priorities – Smaller number, larger cost, capacity Local Priorities Enhancements Transit Aviation
5
Project Categories State Priorities Local Priorities – Larger number, districtwide, different types Enhancements Transit Aviation
6
Project Categories State Priorities Local Priorities Enhancements – Local roadways, smaller amounts, primarily sidewalks Transit Aviation
7
Project Categories State Priorities Local Priorities Enhancements Transit – Mostly bus and other vehicle purchases Aviation
8
Project Categories State Priorities Local Priorities Enhancements Transit Aviation – Grants directly through FAA to airports
9
Contract Types Local Agency Program Projects State Produced – Design/Build – Construction – CEI
10
Example Projects More detailed project descriptions on disc Consist primarily: – Capacity – Resurfacing – Bridge – Operational – Enhancement
11
Example Capacity Projects Projects likely let Design/Build Most are in final stages of Design May be required to obtain permits Construction must be complete within 3 years SR 559 in Aurburndale
12
Example Capacity Projects Projects likely let Design/Build Most are in final stages of Design May be required to obtain permits Construction must be complete within 3 years US 301 in Sarasota County
13
Example Capacity Projects Projects can be conventionally let as a construction bid Likely have 5-10 capacity projects districtwide Cost range from $12 M to $60 M SR 739 in Lee County
14
Example Resurfacing Projects Most will be let as a Design/Build Construction must be complete within 3 years A few will have distance defined by bid CR 832 from SR 29 East
15
Example Resurfacing Projects Most will be let as a Design/Build Construction must be complete within 3 years Others have defined limits CR 17 from Poinsettia St to W Interlake
16
Example Resurfacing Projects Most will be let as a Design/Build Construction must be complete within 3 years Scopes will define curb and gutter, shoulders,or edge of pavement 10 th St from 8 th Ave to 14 th Ave
17
Example Resurfacing Projects Most will be let as a Design/Build Projects can be several miles or couple hundred feet Between 15-20 resurfacing projects expected Home Ave Resurfacing
18
Example Bridge Projects Most will be let as conventional, some design build Projects may be culvert replacement/ improvement 9 th Ave W bridge replacement at Wares Creek
19
Example Bridge Projects Most will be let as conventional, some design build Projects may be culvert replacement/ improvement SE 43 rd Ave bridge replacement
20
Example Bridge Projects Most will be let as conventional, some design build Projects may be culvert replacement/ improvement Cape Haze Bridge Culvert Replacement
21
Example Bridge Projects Most will be let as conventional, some design build Projects may be culvert replacement/ improvement Between 5-7 bridge jobs Jolley Bridge Replacement
22
Example Operational Projects Most will be let as conventional, some design build Consist of intersection improvements, turn lanes, resurfacing, mast arms, SR 776 at Coliseums Blvd
23
Example Operational Projects Most will be let as conventional, some design build Consist of intersection improvements, turn lanes, resurfacing, mast arms, US 41 at Midway Blvd
24
Example Operational Projects Most will be let as conventional, some design build Consist of intersection improvements, turn lanes, resurfacing, mast arms, Murdock Circle add turn lanes
25
Example Operational Projects Most will be let as conventional, some design build Consist of intersection improvements, turn lanes, resurfacing, mast arms, East Bay Dr./Gulf Dr. Signal upgrade
26
Example Operational Projects Most will be let as conventional, some design build Consist of intersection improvements, turn lanes, resurfacing, mast arms, Siesta Drive Drainage Improvements
27
Example Operational Projects Most will be let as conventional, some design build ITS Improvements also possible Between 15-20 projects districtwide Manatee County Phase 2 ATMS System
28
Example Enhancement Projects Most will be let as design build Consist of sidewalk, bikepath/trails, or landscaping City of Bradenton on 23 rd Ave between 26 th St. and 27 th St. W
29
Example Enhancement Projects Most will be let as design build Consist of sidewalk, bikepath/trails, or landscaping Gulf Blvd from Palm to Magnolia
30
Example Enhancement Projects Most will be let as design build Consist of sidewalk, bikepath/trails, or landscaping Bald Eagle Pathway Shared Use Path
31
Example Enhancement Projects Most will be let as design build Consist of sidewalk, bikepath/trails, or landscaping Between 15-25 projects Ft. Fraser Trail in Polk County
32
Example Project Summary Mix of Design/Build and Conventionally Let construction projects Wide range of projects available from bridge, resurfacing, sidewalks, landscaping, minor intersection improvements, drainage, and capacity Spread over all the district and most municipalities Project costs also range from several thousand to multi million
33
CEI Consultant CEI’s will be used for all Stimulus Projects Contracts will be competitively selected using Expanded Letter of Response Number of CEI contracts will be based on number of construction projects Email notification will go to all firms on our CEI Contact List when contract groupings are confirmed If you have not met our Operation Center Staff, please schedule time with them before project advertisements