Presentation is loading. Please wait.

Presentation is loading. Please wait.

Kick Off Meeting City of Pensacola April 18, 2011.

Similar presentations


Presentation on theme: "Kick Off Meeting City of Pensacola April 18, 2011."— Presentation transcript:

1 Kick Off Meeting City of Pensacola April 18, 2011

2

3 Study Purpose Determine the best solution for replacement of the existing bridges and secure FHWA approval of the location and concept design Basis for performing the replacement bridge study Lack of modern safety provisions No facilities for bikes and pedestrians Does not meet current navigation requirements Deteriorating conditions indicate that bridges are structurally obsolete Determine the requirements to meet increasing traffic demands

4

5 Project Development & Environment Study Planning Preliminary Design Final Design Right-of-Way/ Acquisition Construction Candidate Projects Based on Preliminary Analysis and determination of need Prioritize Projects Funding Options/Availability Reviewed/Programming Develop Preliminary Alternatives Assessment of Potential Environmental & Community Impacts Substantial Public Involvement Initiatives Preferred Alternative(s) advance to Preliminary Engineering Develop up to 30% Design Plans Additional Public Outreach Agency Coordination Proceed through Design, 60, 90 % plans Permitting Process Final Cost Estimates Proceed with acquisition of necessary property

6 Project Development & Environment Study Evaluate Current Conditions – Data Collection Environmental, Social, Engineering Forecast Future Needs – Traffic Evaluate Alternative Corridors & Select One Develop Alternatives Within Selected Corridor Perform Assessments of Potential Environmental & Community Impacts Select an Alternative to advance into Preliminary Engineering

7

8

9 One – On – One Meetings Website pensacolabaybridge.com Newsletters Community Stakeholders Neighborhood Associations Informal Public Meetings Special Interest Groups Project Advisory Group (PAG) Local, State & Federal Officials Local Government Throughout the study conduct a comprehensive and continuous Public Involvement Program

10

11 Contact US!! J. Brandon Bruner, PE Project Development Engineer FDOT, District 3 1074 Highway 90 Chipley, FL 32428 850-415-9625 Joseph.Bruner@dot.state.fl.us Dan Kristoff, PE Project Manager RS&H 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2139 Daniel.Kristoff@rsandh.com Nick Arnio, PE, PTOE Deputy Project Manager RS&H 1701 Hermitage Blvd., Suite 101 Tallahassee, FL 32308 Phone: 850-558-2800 Nicholi.Arnio@rsandh.com www.PensacolaBayBridge.com

12 Kick Off Meeting City of Pensacola April 18, 2011


Download ppt "Kick Off Meeting City of Pensacola April 18, 2011."

Similar presentations


Ads by Google