April 23rd-24th 2013Handling Engineering Group. Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559.

Similar presentations


Presentation on theme: "April 23rd-24th 2013Handling Engineering Group. Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559."— Presentation transcript:

1 April 23rd-24th 2013Handling Engineering Group

2 Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group2 Prevessin site Visit of PR559 (project n.7) and TCC8 crane (included in next IT) in building 911 G. Roche / R. Rinaldesi Visit of PR538 (project n.5) and PR534 (project n.6) in building EHN1 J.P. Granchelli / H. Lourenço 14.30 – 15.30Bonfanti / MeloniBrunnhuber / Brun-Mech / Bang 16.00 – 17.00Brunnhuber / Brun-Mech / BangBonfanti / Meloni 17.15 - 18.00: Visit of PR37 and PR38 (project n. 8) in building 156 Meyrin site

3 Visit schedule – April 23 rd April 23rd-24th 2013Handling Engineering Group3 CraneLocation / extent of visit PR559 (project n.7) Surface hall, no access on crane foreseen TCC8-PR560Underground cavern, access on crane for inspection PR534 – PR538 (projects n.5-6)Surface hall, access on cranes for inspection PR37 – PR38 (project n.8)Surface hall, access on railways only

4 Visit schedule – April 24 th April 23rd-24th 2013Handling Engineering Group4 Meyrin site Visit of PR122 (project n.1) and installation site of new 5 ton crane (project n.2) in building 184 G. Roche / R. Rinaldesi Visit of PR146 (project n.4) in building 184 and installation site of new 30 ton crane (project n.3) in building 375 J.P. Granchelli / H. Lourenço 9.00 – 10.00Bonfanti / MeloniBrunnhuber / Brun-Mech / Bang 10.00 – 11.00Brunnhuber / Brun-Mech / BangBonfanti / Meloni

5 Visit schedule – April 24 th April 23rd-24th 2013Handling Engineering Group5 CraneLocation / extent of visit PR122 (project n.1) Surface hall, access on crane for inspection New 5 ton crane (project n.2)Surface hall, access on railways PR146 (project n.4)Surface hall, access on crane for inspection New 30 ton crane (project n.3)ISR storage area, access to hall only

6 Hazards April 23rd-24th 2013Handling Engineering Group6  Access to railways and cranes at ~10 from the ground  Access to radiation areas

7 Measures April 23rd-24th 2013Handling Engineering Group7  Personal Protective Equipment: safety shoes, helmet  Fall-arrest harness (with lanyard)  Dosimeters (escort only)  All visitors shall be authorized by their employer to work in height and use a harness  All visitors shall be authorized by their employer to work in radioactive areas