Download presentation
1
Program Manager Infantry Combat Equipment
Mr. Dan Fitzgerald, Program Manager Infantry Combat Equipment, Marine Corps Systems Command Office Phone:
2
Our Mission Program Manager Infantry Combat Equipment fields, sustains and assesses clothing and equipment while anticipating the needs of and maintaining contact with the Operating Forces in order to enhance the performance, capability, survivability, and mobility of Marines.
3
Infantry Combat Equipment Deputy Program Manager
PM ICE Organization Program Manager Infantry Combat Equipment 2200 Lester Street Quantico, VA Mr. Dan Fitzgerald Program Manager Major Renee Holmes Deputy Program Manager Mr. Allen Schweizer Operations Officer Vacant Finance Manager Mr. Lou Curcio Team Leader Combat, Cold Weather, and Dress Clothing Mr. Scott Adams Team Leader Individual Armor and Load Bearing Mr. John O’Brien Team Leader Support Equipment & Mountain Cold Weather
4
Combat, Cold Weather and
PM ICE Active Projects Combat, Cold Weather and Dress Clothing Individual Armor and Load Bearing Support Equipment & Mountain Cold Weather -Flame Resistant Organizational Gear - clothing and textiles that prevent burn injuries -Footwear, Hot & Temperate Weather -All Purpose Environmental Clothing System (APECS) -Combat Desert Jacket (CDJ) -Cold Weather Clothing Glove System Winter Camouflage Over-Garment Mountain Cold Weather Boot Layering System -Certification of all clothing & optional items -Improved Undergarments and PT Trunks -Accessories: Streamers, Flags, etc. -Sea Bag Items All Weather PT Uniform (new) Dress Blues (added) Khaki Shirt (improved) -Family of Ballistic Protection (OTV, E-SAPI, S-SAPI, LWH Helmet, Goggles, Spectacles) -Modular Tactical Vest (MTV) -Cooling Vest -Family of Load Bearing Equipment Individual Load Bearing Equipment (ILBE) Pouches -Full Spectrum Battle Equipment (FSBE) -Non-Destructive Testing -Water Purification Flame Resistant materials for ballistic protection systems -Next Generation Ballistic Protection -Family of Combat Field Feeding Systems TRHS/ETRHS FFSS/FFSS Bus Duct Food &Beverage Containers Expeditionary Field Kitchen (EFK) -Mountain Cold Weather Equipment Skies, Snowshoes Marine Assault Climbers Kit (MACK) Sleep System (3 seasons) -General Property Support Enhanced Bed Net System MARPAT Poncho Liner Family of Flashlight Individual Flashlight/UHIMIS Field Tarps/Breachers Kits/ Knee&Elbow Pads Martial Arts Kits
5
Mr. Scott Adams – Team Leader
Individual Armor and Load Bearing Team Mr. Scott Adams – Team Leader
6
Current Ballistic Protection for Marines
Interceptor Outer Tactical Vest (OTV) OTV with Side SAPI E-SAPI Front/Back Plate Side-Small Arms Protective Inserts (S-SAPI)
7
Current Ballistic Protection for Marines (Continued)
Lightweight Helmet (LWH) Ballistic Eyewear Combat Arms Earplugs (Ballistic Hearing Protection) QuadGard
8
Ballistic Protection Successes
9
System Integration Modular Tactical Vest (MTV)
Objective – To optimize ballistic protection with integrated and modular/scalable load carrying capability Enables Marines to configure components to best meet operational requirements (APL concept) Optimizes/balances human factors (comfort and usability), protection (from enemy threats and environment), and cost (production and maintenance) Coordinated effort between MCCDC, PM MERS, and PM ICE Gathered user input during two SME conferences during Dec 05 Brought together Armor and Load Bearing industry leaders during Dec 05 to assess strategy and determine maturity of COTS solutions Conducted FUE in CLNC during July 06 Source Selection conducted August 06 Executing two simultaneous acquisition approaches Near term solution in FY06/07 Next generation solution in FY08/09
10
Modular Tactical Vest (MTV)
UUNS – CDTS#06044UA Acquisition Strategy MCCDC prioritized enhancements. 6 vendors submitted prototype vests for Limited User Evaluation (LUE). LUE conducted w/ 40 Marines. 3 designs chosen for Field User Evaluation (FUE). FUE conducted Jul 06 w/ over 100 Marines. Final design review Dec 06. Funding - $33.7M. Contract Award – Sep 06. Vendor – Protective Products International. Fielding Schedule Quantity Required – 60,000. Fielding Schedule - Fielding begins Feb 07 with completion in Sep 07. PPM ICE is coordinating with MARCENT & PP&O on fielding priority. Sustainment Concept PM ICE will coordinate with the Consolidated Issue Facility to procure required replacement components, which will be available via the vendor’s GSA catalog. Description Near-term replacement for OTV. Uses same soft and hard armor inserts. Greater area of coverage; quick cut away for emergency egress and medical treatment; improved comfort, wear and stability.
11
Long-term Efforts Headborne System
Long-term efforts will involve the development of an “encapsulated system” which will integrate ballistics, hearing and optical protection, multi-spectrum vision, NBC capability, communications and advanced displays compatibility.
12
Improved Load Bearing Equipment
Recon Variant ILBE Pack System Hydration Medical Bag (old) Medical Bag (new) Drop Down Holster
13
Individual Water Purification System (IWPS) Desalinization Capability
Sustaining Marines Individual Water Purification System (IWPS) Desalinization Capability MIOX Pen MIOX Cap Block I Block II Block III Limited Quantities Fielded
14
Mountain, Cold Weather and Support Equipment Team
Mr. John O’Brien – Team Leader
15
Mountain & Cold Weather Equipment
Cold Weather Canteen Insulated for use down to – 40 degrees Keeps water/liquid from completely freezing for 48 hours. Modular Sleep System Improvement Reduce weight by ¼ - 1/3 Reduce cube/bulk by ¼ - 1/3 Marine Assault Climbers Kit (MACK) Validate and Modernize SL– Components Individual Stove Component of the Mountain Cold Weather Infantry Kit stove per 2 Marines Primary Use: Melting Snow – make water
16
Family of Combat Field Feeding Systems
Field Food Service System (FFSS) Tray Ration Heating System Enhanced Tray Ration Heating System Ruggedized Food Containers
17
Field Food Service System (FFSS)
Three-ISO standard containers (8x8x20) Sub-components: 1) The Mobile Rapid Deployable Kitchen (MRDK) employs two of the ISO containers. 2) The Field Sanitation Unit (FSU) employs one ISO container. Capable of feeding 800 Marines in 4 hours, two meals per day (based upon B-rations). However, the FFSS is capable of cooking any combination of rations. All electric field kitchen requiring 200 KW to operate entire system. Uses either non-pressurized or pressurized water source up to 40 psi. Requires 12 Marines to operate. Two shifts of 6 personnel.
18
Enhanced Tray Ration Heating System (ERTHS)
Components: Current TRHS: 250 Marines x 2 meals daily Quad Cold – Quadcon sized refrigerator that is also used to store and transport the system. 2 Field Range Cabinets: Fueled by JP8 2 additional tables
19
Miscellaneous Combat Equipment
Field Tarp MACS Sack Poncho Liner Enhanced Bed Net System
20
Marine Corp MACS Sack and Enhanced Bed Net System
5 liter, nylon compression sack with a purge valve Each ILBE will have 4 MACS Sacks Initial Fielding is 2 MACS Sacks per ILBE to provide as many Marines as possible with this capability. Enhanced Bed Net System (EBNS) Identical to the IBNS with an added Rain Fly Developing conversion kits to turn IBNS into EBNS Use: on a cot or directly on the ground
21
Combat, Cold Weather, and Mr. Lou Curcio – Team Leader
Dress Clothing Team Mr. Lou Curcio – Team Leader
22
Flame Resistant Organizational Gear Combat Shirt & Trousers
(FROG I and II) FROG I FROG II Balaclava Nomex Gloves Combat Shirt & Trousers CVC Coveralls iCVC Coveralls Flight Suit Long Sleeve FR Undershirt Available through DLA Fielding 3rd Qtr FY 07 Begin Fielding APR 07 Fielding FROG I items 2nd Qtr FY 07
23
Flame Resistant Organizational Gear (FROG)UUNS – CDTS# Unknown
Description FROG provides increased protection against fire/flame exposure. FROG I – Base Layers: balaclava, improved gloves, long sleeve t-shirt. FROG II – Outer Layers: combat shirt & trouser ensemble or CVC/flight suit. Acquisition Strategy R&D on fabrics/designs. Lab tests, including PYROMAN. Items selected offer optimal level of protection and wear ability. Funding - $44M. Contract Awards – shirts 11 Dec 06; gloves 12 Dec 06; combat shirt & trouser 20 DEC 06. Numerous contracting strategies employed; GSA/Prime Vendor/MCSC Contracting. 1 ea. Light weight 1 ea. MID weight 1 pr 2 per 2 per 2 per Sustainment Concept PM ICE will POM for and provide sustainment for FROG for the foreseeable future. Replacements will be forecasted and force fed to the STAP/CARDF or as directed by PP&O/MARCENT. Fielding Quantity Required – 60,000 (1 per). Fielding Schedule FROG I Begins Jan 07 - Aug 07 Complete FROG II Begins Apr 07- Apr 08 Complete
24
Base Layering for Cold Weather Operations
Combat Utility Uniform Underwear Fleece Pullovers (100/300 wt) Gloves All Purpose Environmental Clothing System (APECS) Over-whites Combat Desert Jacket (CDJ)
25
Improved Hot & Temperate
Weather Boots Enhanced outsole Increased Durability New types of leather Field User Evaluation Completed (In Source Selection)
26
New Initiatives CMC Directed PT Uniforms Dress Blue Uniforms
Development Stage FUE 3rd Qtr FY 07 SEABAG 1st Qtr FY 08 Dress Blue Uniforms SEABAG Issue 1st Qtr FY 08
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.