Sectoral Operational Programme for Transport 2007-2013 BUCHAREST, ROMANIA 2008 MINISTRY OF TRANSPORT MANAGING AUTORITHY FOR SOP-T.

Similar presentations


Presentation on theme: "Sectoral Operational Programme for Transport 2007-2013 BUCHAREST, ROMANIA 2008 MINISTRY OF TRANSPORT MANAGING AUTORITHY FOR SOP-T."— Presentation transcript:

1 Sectoral Operational Programme for Transport 2007-2013 BUCHAREST, ROMANIA 2008 MINISTRY OF TRANSPORT MANAGING AUTORITHY FOR SOP-T

2 SOP-Transport 2007-2013 WHAT IS SOPT? Document elaborated upon the objectives of the National Strategic Reference Framework (NSRF), establishing:  The priorities  The goals  The allocation for development of the transport sector in Romania with EU Structural and Cohesion Funds during 2007-2013.

3 SOP-Transport 2007-2013 RESOURCES Total Budget: 5.694 MEUR Sources:  State Budget: 1.130 MEUR  European Union financial support: 4.563 MEUR  Cohesion Fund  European Regional Development Fund  Co-financing: 85 % CF, 75% ERDF

4 Strategy Priority Axis 1 - 3.854 MEUR (CF + SB) Modernization and development of TEN-T priority axes, aiming at sustainable transport system integrated with EU transport network.  K.A.I. 1.1. - Road infrastructure along the TEN-T Priority Axis no. 7; 1.850 MEUR  K.A.I. 1.2. - Railway infrastructure along the TEN-T Priority Axis no. 22; 1.775 MEUR  K.A.I. 1.3. - Water transport infrastructure along the TEN-T Priority Axis no. 18. 228,9 MEUR

5 Strategy Priority Axis 2 – 1.397 MEUR (ERDF + SB) Modernization and development of the national transport infrastructure outside the TEN-T priority axes, aiming at sustainable national transport system.  K.A.I. 2.1 - National road infrastructure, 509,47 MEUR  K.A.I. 2.2 - National railway infrastructure, 634,67 MEUR  K.A.I. 2.3 - River and maritime ports, 179,64 MEUR  K.A.I. 2.4 - Air transport infrastructure, 74,515 EUR

6 Strategy Priority Axis 3 – 322,89 MEUR (ERDF + SB) Modernization of transport sector, aiming at higher degree of environmental protection, human health and passenger safety.  K.A.I. 3.1- Promote inter-modal transport, 34,082 MEUR  K.A.I. 3.2 - Improve traffic safety across all transport modes, 270,50 MEUR  K.A.I. 3.3 - Minimize adverse effects of transport on the environment, 18,313 MEUR

7 Strategy Priority axis 4 – 119,67 MEUR (ERDF + SB) Technical Assistance  K.A.I. 4.1 - Provide support for effective SOP-T managing, implementing, monitoring and controlling, 89,742 MEUR  K.A.I. 4.2 - Provide support for information and publicity regarding SOP-T. 29,930 MEUR

8 Beneficiaries  National Company for Motorways and National Roads.  National Company for Railways “CRF SA”.  Others: maritime and fluvial port administrations, airport administrations.

9 Projects Projects for 2008  Works for the improvement of road safety on the national roads – FS  Pilot Project for ERTMS, level 2 on Chitila – Crivina – FS  Constanta Port rail access – FS  Danube – Black Sea Canal road bridge – FS  North breakwater extension – FS  RORIS II – FS

10 Projects ProjectMod of transportEstimative period Motorway Nădlac-AradroadSeptember 2009 Motorway Lugoj - DevaroadSeptember 2009 Motorway Orastie – Sibiu (inclusive Sebes by- pass) roadJune 2009 Motorway Timisoara – LugojroadJanuary 2009 By-passes (Adjud, Dej, Mihailesti, Craiova, Pucioasa, Budesti, Buftea, Mangalia, Targu Frumos, Targu Jiu, Filipasi, Falticeni) roadDecember 2009 By-passes (Carei, Valea lui Mihai, Sculeni, Pascani) roadDecember 2010 Zalau – Alesd road rehabilitation roadNovember 2009 Galati – Vaslui County limit – Crasna – Albita roadNovember 2009 Alexandria – Craiova road rehabilitation (inclusive Alexandria and Caracal by-passes) roadJune 2010

11 Projects ProjectMod of transport Estimative period Bucharest – Adunatii Copaceni road rehabilitation roadSeptember 2009 Railway stations upgrade (Baia Mare, Satu Mare) railFebruary 2009 Railway stations upgrade ( 16 stations)railFebruary 2011 Rehabilitation of the railway bridges / tunnels (on TEN-T) railMay 2008 Works for the improvement of road safety on rail infrastructure railFebruary 2010 Portile de Fier II/ Calarasi – Silistra navalApril 2009 Sulina Canal works navalCan not be estimated

12 Call for proposals Rules:  the call will be announced within 12 months before the dead-line on MT website  Guidelines will be elaborated for each call Rolling stock renewalrailCall for proposals Modernization and development of national water transport infrastructure navalCall for proposals Modernization and development of airports infrastructure airCall for proposals

13 THANK YOU FOR YOUR ATTENTION ! http://www.mt.ro/dgrfe/post/engleza/POS_Transport_final_EN.pdf http://www.mt.ro/dgrfe/post/engleza/POS_Transport_final_EN.pdf e-mail: postransport@mt.ropostransport@mt.ro


Download ppt "Sectoral Operational Programme for Transport 2007-2013 BUCHAREST, ROMANIA 2008 MINISTRY OF TRANSPORT MANAGING AUTORITHY FOR SOP-T."