Download presentation
Presentation is loading. Please wait.
Published byReynard Myles Boyd Modified over 9 years ago
1
Al Giorgi – BioAnalysts, Inc. BioAnalysts, Inc.
2
BiOP RPA 52.6 = Monitoring Plan PIT data Many RM&E RPAs Clarify needs, specifications (N, Populations, etc). ISAB recommends a regional tagging & marking plan BioAnalysts, Inc.
3
Develop Regional PIT Tag Monitoring Plan Ensure adequate performance indices are obtained for the required ESU/populations, into the future Meet needs of BiOp, FWP, Accords, HCPs Improve information efficiency- coordinate tagging among All-H user groups Component of a more comprehensive regional tag/mark plan BioAnalysts, Inc.
4
Global Issues (Columbia Basin) PTAGIS, metadata, forecasting, tag effects H-specific (BiOp focus now) Management goals/objective-PIT data focus Performance measures, N, precision, analytical framework, ESU/populations Path forward- next decade Tagging effort, detection needs, data management BioAnalysts, Inc.
5
Draft complete: BiOp-focus Hydro section (internal review- AA&NOAA) PIT tag forecast database In Progress : BiOp-focus other H-sections Global section Pending: Regional input to plan BioAnalysts, Inc.
6
System Passage Survival- smolt & adult Migration- timing, travel time How to maintain or improve quality? BioAnalysts, Inc.
7
MCNLGR AFEP Research NOAA dam tagging Snake VSP HAB HAT CSS UC &MC- HCPs,VSP,HAB,HAT,CSS BON
8
Predict tagging effort into next decade Tag which populations in what numbers? Future BiOp or FWP PIT data gaps? Augment or shift tagging effort? Catalog projects using PITs (FWP, AFEP, HCP, Accord) Resides at CBR (temporarily) Future location PTAGIS? Needs systematic updates BioAnalysts, Inc.
9
Contents – PIT Tag Forecast Database (2011-2020) ESU/MPG Release site Subbasin – lat/lon Project/contract # Sponsor Contractor Number released Life stage Origin (wild/hat.) Hatchery name RME application Data source BioAnalysts, Inc.
10
Finish BiOp-focus text (Winter 2011) Solicit Regional input & revise (Spring 2011) Include other species Finalize Plan (Summer 2011) Coordinate tagging activities and detector deployment among all H-groups and programs (2011 and beyond) BioAnalysts, Inc.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.