Download presentation
Presentation is loading. Please wait.
Published bySophia Gallagher Modified over 9 years ago
1
WELCOMES ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1
2
DEVELOPED BY:- B. ADHIKARY, EE (IE) Flue Gas Duct CHIMNEYCHIMNEY ELECTROSTATIC PRECIPITATOR BOILER FD Fan OIL TANK WATER TANK OIL LINE WATER LINE AIR LINE BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA (E) BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA (E) DM PUMP OIL PUMP COMPRESSOR
3
WINDBOXWINDBOX WINDBOXWINDBOX SA Coal/Oil Burner Coal/Air Mixture Atomized Oil Internal Combustion Boiler Corner Fired (Tangential) Fuel Firing System water walls FURNACE FIRE BALL water walls
4
Drum From HPT To IPT W/W Platen To Boiler Drum Drum To HPT From HPT To IPT To Boiler Drum ECO RHRH RHRH Prepared by:- B. Adhikary, EE (IE), KE LTSH Internal Combustion Boiler APH-A BFP Oil Guns Coal Burner ESP To atmosphere through chimney FD Fan Flue gas exit ID Fan Wind Box FSHFSH FSHFSH Hot SA Cold SA PLTSHPLTSH PLTSHPLTSH APH
5
Pl S H RHRH RHRH FSHFSH Eco PSH 147Kg/cm 2 540 0 C Generator Transformer Generator Turbine Boiler Coal Bunkers Primary Air Fans Coal Mills Raw Coal Fdr Chimney Flue Gas Duct Induced Draft Fan Coal Conveyer Coal Bunker CSEB Crusher House 400/220 KV Switch Yard 400/220 KV 15.75KV Condenser Boiler Feed Pump 2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by: B Adhikary (I.E.) Coal Handling Plant Forced Draft Fan Boiler Drum 3000 rpm 210MW ESP AH Cold PA Hot PA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.