Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf
2
Workshop Vienna, 2nd july 08 WeizWeiz GleisdorfGleisdorf 17 communities 38 500 inhabitants Energy region Weiz-Gleisdorf
3
Workshop Vienna, 2nd july 08 Project Partner in Austria Coordination of the energy region Weiz-Gleisdorf: W.E.I.Z. Research organisation: AEE INTEC Institut for sustainable technologies Utility: Feistritzwerke STEWEAG GmbH
4
Workshop Vienna, 2nd july 08 Research/Innovation Information campaign Public energy day Innovative PV-systems Bio-fuelled co-generation High efficient retrofit Establish wood-pellet infrastructure Dissemination
5
Workshop Vienna, 2nd july 08 Demonstration Innovativ solar thermal systems 80 solar-comby-systems in private households (10 – 20m²) 8 large-scale-systems f. resident.buildings or tourism.comp. Innovative PV-systems 25 PV-Systems in private households with about 3 kWp Improve district heating system 15 local district heating systems with about 150 kWh th, using woodchips or pellets 1.000 Energy checks for buildings
6
Workshop Vienna, 2nd july 08 Demonstration High efficient retrofit 7000 m² residential-buildings 2500 m² public-buildings 1000 m² office-buildings New low-energy buildings 4500 m² residential-buildings with passivhouse-standard Communal energy management Establish wood-pellet infrastructure 110 pellet boilers with 10 to 30 kW Establish bio-fuel infrastructure
7
Workshop Vienna, 2nd july 08 DEM: for example: Plant oil-infrastructure Two new fuel stations Training course for garage owners and mechanics Installation of an show room Adaption of 30 vehicles to use plant oil
8
Workshop Vienna, 2nd july 08 Solar thermal systems Since June 2005 we installed 1331,9m² = 67 solar plants (one family houses)
9
Workshop Vienna, 2nd july 08 Pellet burners Since June 2005 we installed 886 kW= 56 pellet burners (one family houses)
10
Workshop Vienna, 2nd july 08 New buildings (one family houses) Since June 2005 we supported 2214 m² of new buildings.
11
Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 258 kWh/m²a Energy characteristic: 58 kWh/m²a Since June 2005 we supported 2327m² of retrofits.
12
Workshop Vienna, 2nd july 08 Retrofits - one family houses Measurements Roof: 40 cm heat insulation Outer walls: 12 cm insulation Windows: U-value 1,1 W/m²K Heating system: solar thermal system 20m², wood boiler, storage tank 1000l
13
Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 205 kWh/m²a Energy characteristic: 54 kWh/m²a
14
Workshop Vienna, 2nd july 08 PV-plants PV-power: 3.040 Wp 16m² therm. Collector 12 kWh/m² heating PV-Power: 4.700 Wp Low energy-building in massive construction < 12 kWh/m² heating
15
Workshop Vienna, 2nd july 08 District heating systems - 7 plants finished – 820 kW th
16
Workshop Vienna, 2nd july 08 Communal energy management Streetlights - in 4 communities, installationion of energy saving streetlights - using new lamp-technology, reduction of operatingvoltage
17
Workshop Vienna, 2nd july 08 Online Energy-consulting
18
Workshop Vienna, 2nd july 08 Bio-fuel „plant oil“ - 8 vehicles adaped to bio fuel and in operation - 2 filling stations will be finished in July 2008 - 1 trasportable show-element to present the technology in the region
19
Workshop Vienna, 2nd july 08 Bio-fuel co-generation plants 1 plant running, 2 plants under construction - Electric Power: 8 kW – grid-connected - Thermal output: 18 kW – for heating office-building - Overall efficiency: aprox. 91%
20
Workshop Vienna, 2nd july 08 Monitoring for Energy in minds!° - projects
21
Workshop Vienna, 2nd july 08 Buildings monitoring
22
Workshop Vienna, 2nd july 08 Buildings
23
Workshop Vienna, 2nd july 08 Buildings Energy demand: Before:157 kWh/m²a After:24 kWh/m²a Energy costs: Before: 30.450 €/year After:4.190 €/year
24
Workshop Vienna, 2nd july 08 Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf 19.5 m² 1,250 litres storage tank Domestic hot water is generated by a flat plate heat exchanger 10 kW pellet boiler for auxiliary heating
25
Workshop Vienna, 2nd july 08 Monitoring Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf House energy demand of 43 kWh/m²a for 150 m² living area The 19.5 m² solar thermal collector area was architectural integrated in the building’s south facade
26
Workshop Vienna, 2nd july 08
27
Solar Thermal System and pellet boiler – Family Wolf, Gleisdorf 15 m² 1,000 litres storage tank 10 kW pellet boiler for auxiliary heating
28
Workshop Vienna, 2nd july 08
29
Monitoring PV plants
30
Workshop Vienna, 2nd july 08 Monitoring PV-Plants – web-based