Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf.

Similar presentations


Presentation on theme: "Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf."— Presentation transcript:

1 Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf

2 Workshop Vienna, 2nd july 08 WeizWeiz GleisdorfGleisdorf 17 communities 38 500 inhabitants Energy region Weiz-Gleisdorf

3 Workshop Vienna, 2nd july 08 Project Partner in Austria Coordination of the energy region Weiz-Gleisdorf: W.E.I.Z. Research organisation: AEE INTEC Institut for sustainable technologies Utility: Feistritzwerke STEWEAG GmbH

4 Workshop Vienna, 2nd july 08 Research/Innovation  Information campaign  Public energy day  Innovative PV-systems  Bio-fuelled co-generation  High efficient retrofit  Establish wood-pellet infrastructure  Dissemination

5 Workshop Vienna, 2nd july 08 Demonstration Innovativ solar thermal systems 80 solar-comby-systems in private households (10 – 20m²) 8 large-scale-systems f. resident.buildings or tourism.comp.  Innovative PV-systems 25 PV-Systems in private households with about 3 kWp  Improve district heating system 15 local district heating systems with about 150 kWh th, using woodchips or pellets  1.000 Energy checks for buildings

6 Workshop Vienna, 2nd july 08 Demonstration High efficient retrofit 7000 m² residential-buildings 2500 m² public-buildings 1000 m² office-buildings  New low-energy buildings 4500 m² residential-buildings with passivhouse-standard  Communal energy management  Establish wood-pellet infrastructure 110 pellet boilers with 10 to 30 kW  Establish bio-fuel infrastructure

7 Workshop Vienna, 2nd july 08 DEM: for example: Plant oil-infrastructure  Two new fuel stations  Training course for garage owners and mechanics  Installation of an show room  Adaption of 30 vehicles to use plant oil

8 Workshop Vienna, 2nd july 08 Solar thermal systems Since June 2005 we installed 1331,9m² = 67 solar plants (one family houses)

9 Workshop Vienna, 2nd july 08 Pellet burners Since June 2005 we installed 886 kW= 56 pellet burners (one family houses)

10 Workshop Vienna, 2nd july 08 New buildings (one family houses) Since June 2005 we supported 2214 m² of new buildings.

11 Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 258 kWh/m²a Energy characteristic: 58 kWh/m²a Since June 2005 we supported 2327m² of retrofits.

12 Workshop Vienna, 2nd july 08 Retrofits - one family houses Measurements Roof: 40 cm heat insulation Outer walls: 12 cm insulation Windows: U-value 1,1 W/m²K Heating system: solar thermal system 20m², wood boiler, storage tank 1000l

13 Workshop Vienna, 2nd july 08 Retrofits - one family houses Energy characteristic: 205 kWh/m²a Energy characteristic: 54 kWh/m²a

14 Workshop Vienna, 2nd july 08 PV-plants PV-power: 3.040 Wp 16m² therm. Collector 12 kWh/m² heating PV-Power: 4.700 Wp Low energy-building in massive construction < 12 kWh/m² heating

15 Workshop Vienna, 2nd july 08 District heating systems - 7 plants finished – 820 kW th

16 Workshop Vienna, 2nd july 08 Communal energy management Streetlights - in 4 communities, installationion of energy saving streetlights - using new lamp-technology, reduction of operatingvoltage

17 Workshop Vienna, 2nd july 08 Online Energy-consulting

18 Workshop Vienna, 2nd july 08 Bio-fuel „plant oil“ - 8 vehicles adaped to bio fuel and in operation - 2 filling stations will be finished in July 2008 - 1 trasportable show-element to present the technology in the region

19 Workshop Vienna, 2nd july 08 Bio-fuel co-generation plants 1 plant running, 2 plants under construction - Electric Power: 8 kW – grid-connected - Thermal output: 18 kW – for heating office-building - Overall efficiency: aprox. 91%

20 Workshop Vienna, 2nd july 08 Monitoring for Energy in minds!° - projects

21 Workshop Vienna, 2nd july 08 Buildings monitoring

22 Workshop Vienna, 2nd july 08 Buildings

23 Workshop Vienna, 2nd july 08 Buildings Energy demand: Before:157 kWh/m²a After:24 kWh/m²a Energy costs: Before: 30.450 €/year After:4.190 €/year

24 Workshop Vienna, 2nd july 08 Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf 19.5 m² 1,250 litres storage tank Domestic hot water is generated by a flat plate heat exchanger 10 kW pellet boiler for auxiliary heating

25 Workshop Vienna, 2nd july 08 Monitoring Solar Thermal System and Pellet Boiler – Family Hausmann, Gleisdorf House energy demand of 43 kWh/m²a for 150 m² living area The 19.5 m² solar thermal collector area was architectural integrated in the building’s south facade

26 Workshop Vienna, 2nd july 08

27 Solar Thermal System and pellet boiler – Family Wolf, Gleisdorf 15 m² 1,000 litres storage tank 10 kW pellet boiler for auxiliary heating

28 Workshop Vienna, 2nd july 08

29 Monitoring PV plants

30 Workshop Vienna, 2nd july 08 Monitoring PV-Plants – web-based


Download ppt "Workshop Vienna, 2nd july 08 The „Energy in minds!“ - project in the energy region Weiz-Gleisdorf."