Download presentation
Presentation is loading. Please wait.
Published bySilas Sherman Modified over 9 years ago
1
DPR Monitoring Efforts Within Salt Creek Watershed, Orange County Robert Budd, PhD January 20 th, 2015
2
DPR Monitoring Sites Northern CaliforniaSouthern California
3
Salt Creek Watershed
4
Prioritization Model Based on use and available toxicity data Used to prioritize pesticides for monitoring purposes DPR Urban Monitoring Program – Salt Creek Sampling Protocol 2008 – Present Sampling 4 events/year: 2 dry and 2 storms 8 sampling sites; 4 upper watershed storm drains 3 lower watershed receiving waters 1 treatment facility outfall 173 water samples, 72 pesticides monitored Concentrations compared to aquatic benchmarks set by US EPA
5
Frequency of Detection of Pesticides Monitored Within Salt Creek Watershed (2008- Present)
6
Dash = Mean concentration Dotted = Minimum EPA Aquatic Benchmark
7
Proposed Gauging Station Niguel Road
8
Flow Gauging Station Objective: Ability to estimate contaminant loading within main stem of watershed on annual basis EventEstimateMeanSDMedian2.5th PCT97.5th PCT Storm Flux (µg/s)3.144.911.680.2115.20 Load (g/yr)1.750.111.751.561.98 Nonstorm Flux (µg/s)1.381.620.890.155.38 Load (g/yr)42.990.2742.9942.4743.54 Example: Fipronil at SC3 (storm drain) Monte Carlo Estimation of Annual Fipronil Loading Using 2013 Flow Data
9
Questions ? http:// www.cdpr.ca.gov/docs/emon/pubs/protocol/study270protocol2014_15.pdf Sampling protocol for DPR Study Number 270; Ensminger, M. P., R. Budd, K. C. Kelley, and K.S. Goh. 2013. Pesticide Occurrence and Aquatic Benchmark Exceedances in Urban Surface Waters and Sediments in Three Urban Areas of California, USA, 2008-2011. Environ. Monit. Assess. 185: 3697-3710 Published results through 2011;
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.