Download presentation
Presentation is loading. Please wait.
Published byArron Silvester Park Modified over 9 years ago
1
Wake County Stormwater Workshop Guidance on the New Stormwater Ordinance and Design Manual August 29, 2006
2
Wake County Stormwater Presentation August 2006 Introduction ► Wake County met with a group of stakeholders and formed a committee to create a new stormwater ordinance ► After a year long process, of education, discussion, and debate - the committee came to an agreement.
3
Wake County Stormwater Presentation August 2006 Introduction ► Decisions of the Committee: Runoff volume management is the goal. (not peak discharge management) Runoff volume management will be achieved by managing the curve number. Target curve numbers are set and proposed developments should match the target or manage the excess runoff for a 3-inch precipitation depth. Excess runoff will be infiltrated or stored and released over a period of 2 to 5 days.
4
Wake County Stormwater Presentation August 2006 Introduction ► Target Curve Numbers Zoning District Maximum Composite Curve Number, By Soil Group ABCD R-80W and R-8037607379 R-40W and R-4041627580 R-30, R-20, R-15, R-10, R-5, Residential Highway, General Business and Office and Institutional 43637681
5
Wake County Stormwater Presentation August 2006 Introduction ► Goals of Ordinance: Protect streams and other resources. Encourage low impact design approaches. Allow flexibility for designer. Meet the Neuse Rules.
6
Wake County Stormwater Presentation August 2006 Design Manual ► Intent: Provide procedure to meet the ordinance. ► Curve Number Method (TR-55) ► SCS Runoff Equation (TR-55) ► Storage/Infiltration Devices Discuss design approaches. ► Conventional design ► Low impact design ► Hybrid design
7
Wake County Stormwater Presentation August 2006 Curve Numbers ► Integers ranging from 30 to 98. ► Based on Land-use and Hydrologic Soil Group. ► Hydrologic Soil Group is determined by soil series. ► Curve numbers represent the amount of runoff expected from a specific area. A high curve number represents more runoff than a low curve number.
8
Wake County Stormwater Presentation August 2006
9
Curve Numbers Surface Cover Type Curve Numbers for Hydrologic Soil Group ABCD Woods30557077 Open Space (Lawns, Pasture, etc)39617480 Impervious98 Surface Cover Type Curve Numbers for Hydrologic Soil Group ABCD Open Space (Grass portion of R/W)80 Impervious (Paved portion of R/W)98
10
Wake County Stormwater Presentation August 2006 Procedure ► Curve Number Method Calculate Target Curve Number for Proposed Site based on Zoning and Soil Composition Calculate Proposed Site Curve Number based on Soil Composition and proposed land use data Zoning District Maximum Composite Curve Number, By Soil Group ABCD R-80W and R-8037607379 R-40W and R-4041627580 R-30, R-20, R-15, R-10, R-5, Residential Highway, General Business and Office and Institutional 43637681
11
Wake County Stormwater Presentation August 2006 Example ► Calculate Target Curve Number Proposed Site zoned as R-40W 75% B Soils, 25% C Soils (0.75*62) + (0.25*75) = 65.25 Target Curve Number for site is 65.
12
Wake County Stormwater Presentation August 2006 Example ► Calculate Proposed Curve Number 10-acre Site ► Proposed Woods, HSG B (CN=55) = 4 acres ► Proposed Open Space, HSG B (CN= 61) = 1.5 acres ► Proposed Open Space, HSG C (CN=74) = 2 acres ► Proposed Impervious (CN=98) = 1.5 acres ► Proposed Impervious in R/W (CN=98) = 0.5 acres ► Proposed Open Space in R/W (CN=80) = 0.5 acres (55*4)+(61*2)+(74*2)+(98*2)+(80*0.5) = 695.5 695.5/10 = 69.55 Proposed Curve Number is 70.
13
Wake County Stormwater Presentation August 2006 Procedure ► Calculate Runoff Volume to be stored or infiltrated using SCS Runoff Equation. ► SCS Runoff Equation (TR-55): Q* = (P – 0.2S) 2 (P + 0.8S) (P + 0.8S)Where: Q* = runoff in inches P = Precipitation Depth in inches (3 inches) S = Potential maximum retention in inches
14
Wake County Stormwater Presentation August 2006 Procedure ► In order to calculate Q* - first calculate S. S = (1000/CN) – 10 ► Q* must be calculated for the Target and Proposed curve numbers and then multiplied by the site acreage to determine the total runoff volume for each CN ► The difference between the two volumes must be handled by stormwater devices
15
Wake County Stormwater Presentation August 2006 Example ► Calculate Runoff Volume. Site acreage = 10 acres Target CN = 65 Proposed CN = 70 S target = (1000/65)-10 = 5.38 inches Q* target = (3+ (0.2*5.38)) 2 /(3+(0.8*5.38)) = 0.51 inches S proposed = (1000/69)-10 = 4.49 inches Q* proposed = (3+ (0.2*4.29)) 2 /(3+(0.8*4.29)) = 0.71 inches Q* proposed - Q* target = 0.71 – 0.51 = 0.20 inches 0.20 inches * 10 acres = 2.0 acre-inches = 7,405 ft 3
16
Wake County Stormwater Presentation August 2006 Procedure ► Neuse Rules dictate that any development of 15% impervious or greater must not cause an increase in the post-development 1-year, 24-hour storm from the pre-development conditions. ► Wake County has adopted the Neuse Rules for the Cape Fear River Basin as well. ► Therefore, sites of 15% impervious or more must meet both the Wake County Stormwater Ordinance and the Neuse Rules
17
Wake County Stormwater Presentation August 2006 Procedure ► For these sites – the peak flow must be calculated using the SCS method. ► Time of concentrations for pre- and post- development must be calculated using methodology in TR-55. It is also included in the design manual. ► Type II SCS curve with a 3-inch total depth should be used.
18
Wake County Stormwater Presentation August 2006 Design Approaches ► Three approaches can be used for volume management and peak flow management, if required: Conventional approach ► This is the typical approach to stormwater on a subdivision and usually incorporates a wet or dry pond. Low impact design approach ► This includes trying to mimic the natural hydrologic conditions by allowing for as much infiltration and transpiration as possible. Hybrid of the two approaches
19
Wake County Stormwater Presentation August 2006 Low Impact Development ► Minimize runoff by: Maximizing wooded areas by preserving woods on lots and in common open space. Minimizing impervious areas by using narrow roads, reducing on lot impervious, and/or replacing with pervious pavers. Maximizing opportunity for infiltration and transpiration by using open ditch section roads instead of curb and gutter and disconnecting impervious areas.
20
Wake County Stormwater Presentation August 2006 Low Impact Development
21
Wake County Stormwater Presentation August 2006 Land Use Practices ► Preservation of Wooded Areas and Reforestation Important tool used to lower volume of runoff by lowering the proposed curve number. Due to the locations of houses, driveways, and septic fields being largely unknown at the construction drawing stage – it may not be practical to depict a boundary on lots of preserved wooded areas at the preliminary plan or construction drawing level. Therefore – the County has allowed a set assumption on lots to be made without designation of a boundary. Preserved wooded areas and reforested areas can be set aside in common open space as well and does not have a set assumption as lots do.
22
Wake County Stormwater Presentation August 2006 Land Use Practices ► Preservation of Wooded Areas and Reforestation Use maximum assumption of woods on lots. If exceeding assumption – boundary for all preserved woods on lots must be provided. Zoning District Maximum Assumption of Woods on Lots without Designation R-80W and R-8030% R-40W and R-4020% R-3015% R-20, R-15, R-10, R-5, Residential Highway, General Business and Office and Institutional 0%
23
Wake County Stormwater Presentation August 2006 Land Use Practices ► Disconnected Impervious Areas TR-55 describes as impervious areas in which the runoff is spread over a pervious area as sheet flow. TR-55 provides an equation in order to reduce the composite curve number to reflect the reduction in runoff for impervious surfaces that has the opportunity to infiltrate. The opposite of this would be impervious surfaces that are connected by pipe systems or do not have adequate opportunity to infiltrate.
24
Wake County Stormwater Presentation August 2006 Land Use Practices ► Disconnected Impervious TR-55 Equation: CN c = CN p + [(P imp /100)*(98-CN p )*(1-(0.5R))] Where: CN c = Composite Curve Number CN p = Pervious Runoff Curve Number P imp = Percent Impervious R = Ratio of Disconnected Impervious Area to Total Impervious Area
25
Wake County Stormwater Presentation August 2006 Land Use Practices ► Disconnected Impervious Surface How is “opportunity to infiltrate” quantified? Wake County: ► Rooftop Minimum of 50 ft in direction of flow across pervious surface before channelization Maximum of 500 sq. ft. of rooftop to downspout Splashblock or equivalent area of gravel dissipater ► Roadway Minimum flow length across pervious surface before channelization is equal to flow path across impervious surface Maximum flow path across impervious surface is 75 ft Maximum slope of pervious surface receiving flow is 5% Pervious pavers and pavement is automatically disconnected.
26
Wake County Stormwater Presentation August 2006 Land Use Practices ► Disconnected Impervious Surface As with preserved wooded areas, a maximum assumption can be used for the amount of impervious surface that is disconnected. This is due to the fact that house and driveway locations, areas to each downspout, and grades are largely unknown on the lots at the preliminary plan and construction drawing level.
27
Wake County Stormwater Presentation August 2006 Land Use Practices ► Disconnected Impervious Surface With this assumption, an R-80 subdivision would apply an R=0.5 to the TR-55 equation If exceeding assumption, disconnection must be shown on plans. Zoning District Maximum Assumption of Disconnection without Designation R-80W, R-80, R-40W, R40, R-30 50% R-20, R-15, R-10, R-5, Residential Highway, General Business and Office and Institutional 25%
28
Wake County Stormwater Presentation August 2006 Integrated Management Practices (IMPs) ► Low impact development’s coined phrase for microscale and distributed management techniques. ► Typically used to manage stormwater at the source. ► Therefore – are most commonly used on lots for residential uses.
29
Wake County Stormwater Presentation August 2006 Integrated Management Practices (IMPs) NCSU-BAE
30
Wake County Stormwater Presentation August 2006 Best Management Practices (BMPs) NCSU-BAE
31
Wake County Stormwater Presentation August 2006 Example Site ► R-40W ► 53.25 acres ► 100% B Soils ► Cluster S/D ► 44 Lots
32
Wake County Stormwater Presentation August 2006 Conclusion www.wakegov.com/environment/water/stormwater.htm Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.