Zionsville Community Schools 2013 Report on Class Size, Enrollment, and Building Capacity Usage
2
Class Size
3
Elementary Grades K-4 SchoolK1234 Boone Meadow 24.0*24.018.525.521.0 Eagle17.719.526.7*22.727.7 Pleasant View22.5 24.023.629.0 Stonegate21.518.822.824.324.6 Union21.824.8**21.224.824.5 Class Size Averages—2013, ADM * Denotes Added Support from Instructional Assistant(s)
4
Grade 5 SchoolLA/SSMASCAvg. ZMS 23.325.728.425.6 ZWMS 23.923.7 2013 Middle Grades Class Size Averages
5
2013 Middle Grades Class Size Averages Grade 6 SchoolLA/SSMASCAvg. ZMS 27.428.627.427.8 ZWMS 26.826.426.126.4
6
2013 Middle Grades Class Size Averages Grade 7 SchoolLA/SSMASCAvg. ZMS 26.8 ZWMS 28.229.423.727.2
7
2013 Middle Grades Class Size Averages Grade 8 SchoolLA/SSMASCAvg. ZMS 27.729.827.628.1 ZWMS 24.726.125.925.4
8
2012 High School Class Size Averages Grades 9-12 SchoolLAMASCSSAvg. ZCHS 25.825.924.526.525.6
9
Class Size Comparison— Elementary
10
Class Size Comparison— Middle Level
11
Class Size Comparison— High School
12
Class Size Distribution Comparison - Elementary
13
Class Size Distribution Comparison – Middle Schools
14
Class Size Distribution Comparison - ZCHS
15
Enrollment
16
Enrollment Change 2012 to 2013 by Level as of ADM Count Day School Level2012-20132013-2014Difference Pre-K ( Excludes UP) 718110 K-42227229669 5-81879194364 9-1218101805-5 13 and 13+65 District Total59936130137
18
Student Enrollment and Building Capacity
19
Enrollment as a Percentage of Capacity by School
20
ZIONSVILLE COMMUNITY HIGH SCHOOL Enrollment 2006 – 2013 Actual ADM 2014-2018 Projected Actual ADM EnrollmentProjected Enrollment
21
Class sizes are within an acceptable range of metric goals Outlying classrooms are supported by the assignment of instructional assistants. The introduction of K-4 at BME has effectively eliminated capacity issues at SGE for the next several years or more. IBRC projections show current capacity to be adequate at K- 8 through 2023 and beyond. The actual enrollment at ZCHS is close to IRBC projection for 2013. As projected capacity will be reached by 2017. The proposed HS addition will provide the additional capacity to reach 2023 and beyond. SUMMARY
22
Zionsville Community Schools 2013 Report on Class Size, Enrollment, and Building Capacity Usage