Presentation is loading. Please wait.

Presentation is loading. Please wait.

Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative.

Similar presentations


Presentation on theme: "Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative."— Presentation transcript:

1 Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative

2 2 OVERVIEW MEMBERSHIP ACTION ITEM STATUS UPDATE ESTIMATES AND PROJECTIONS ISSUES

3 MEMBERSHIP Walter Coley (AFWA) – Chairman Charles Abel (AFWA) – T Daniel Starosta (NWS) – T Barbara Tobe (NWS) Sheryl Panek (FNMOC) Jerry Core (NAVO) Seyed Hosseini (NESDIS) Bill Godfrey (NESDIS) – T Ben Kyger (NCEP) Luis Cano (NCEP) – T T=Tech support 3

4 4 ACTION ITEM UPDATE COPC AI 2007-2.16 NWS Port 20 and 21 convert costs CSAB AI 2007-2.4 DATMS-U Backup Procedures 2007-10.1 Communication Use Estimates

5 COPC Action Item 2007-2.16 NWS cost and Schedule to convert to SFTP NWSTG – None; already converted NESDIS – Communicates through NWSTG SFTP capability - $140K and 4 months NCEP Official Communication through NWSTG HTTPS, SSH, VPN are available Recommendation – Convert NESDIS to SFTP 5

6 6 Action Item 2007-2.4 Documented Backup Procedures DATMS-U Is The Most Reliable Link ~99.99+% All Sites Can Use Internet For Short Term Backup Capacity has expanded May provide viable backup Current Documented Backup Procedures Outdated Based on Old data and results Recommend semi-annual Backup testing Create repeatable backup procedures Eliminate bottlenecks

7 7 Action Item 2007-10.1 Communications Bandwidth Communications projections recalculated Community activity still a work in progress Consistent method to track bandwidth being tested Interpretation must be consistent Builds better ‘Big Picture Site and Systems Accreditation are concerns for security and data throughput

8 8 Current –Spring 2008

9 9 Current Data Exchange Data on Apr 18, 2008 FY08 Network Service FY08 Volume FY08 Network Use FY09 Network Use Estimate FY10 Network Use Estimate FY11 Network Use Estimate FY12 Network Use Estimate FY13 Network Use Estimate Link Network Capacity Speed Bytes 24 hours Avg 24 hours Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth NWSTG to DATMS-U 670 GB62.0 Mbs 233 G34.8%52.1%78.2%117.3%176.1%264.1% DATMS-U to NWSTG 670 GB62.0 Mbs 55.2 G8.2%12.4%18.5%27.8%41.7%62.6% NWSTG to Internet 21.6 TB2.0 Gbs 1.7 T7.9%11.8%17.7%26.6%39.8%59.7% Internet to NWSTG 21.6 TB2.0 Gbs 165.8 G0.8%1.1%1.7%2.6%3.9%5.8% Dashboard Legend Latency adequate Latency risk, initiate network upgrade Latency issue, network upgrade needed

10 10 Current Data Exchange (cont) Data on April 18, 2008 FY08 Network Service FY08 Volume FY08 Network Use FY09 Network Use Estimate FY10 Network Use Estimate FY11 Network Use Estimate FY12 Network Use Estimate FY13 Network Use Estimate LINK Network Capacity Speed Bytes in 24 hours Avg 24 hours Avg (24 hours) @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth NWSTG to AFWA 540.0 GB50.0 Mbs 159.0 G29.4%44.1%66.3%99.4% 149.1% 223.6% AFWA to NWSTG 540.0 GB50.0 Mbs 23.0 G4.3%6.4%9.6%14.4%21.6%32.3% NWSTG to FNMOC 65.0 GB6.0 Mbs 52.0 G80%120%180%240%360%540% FNMOC to NWSTG 65.0 GB6.0 Mbs 25.2 G38.8%58.2%87.2%130.9%196.3%294.4% Dashboard Legend Latency adequate Latency risk, initiate network upgrade Latency issue, network upgrade needed

11 11 Current Data Exchange (cont) Data on Apr 18, 2008 FY08 Network Service FY08 VolumeFY08 Network Use FY09 Network Use Estimate FY10 Network Use Estimate FY11 Network Use Estimate FY12 Network Use Estimate FY13 Network Use Estimate LINK Network Capacity Speed Bytes 24 hrsAvg 24 hrsAvg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth FNMOC to NAVO 65.0 GB6.0 Mbs 65.0 GB100%150%225%337.5%506.3%759.4% NAVO to FNMOC 65.0 GB6.0 Mbs 8.6 GB13.2%19.9%29.8%44.6%66.9%100.5% NAVO to NWSTG 65.0 GB6.0 Mbs 7.0 GB 10.8%16.2%24.2%36.4%54.5 %81.8% NWSTG to NAVO 65.0 GB6.0 Mbs 22.2 GB34.2%51.2%76.9%115.3%172.9%259.4% Dashboard Legend Latency adequate Latency risk, initiate network upgrade Latency issue, network upgrade needed

12 12 Current Data Exchange (cont) Data on Apr 18, 2008 FY08 Network Service FY08 Volume FY08 Network Consumpt ion FY09 Network Consumpt ion Estimate FY10 Network Consumpt ion Estimate FY11 Network Consumpt ion Estimate FY12 Network Use Estimate FY13 Network Consumpt ion Estimate Link Network Capacity Speed Bytes 24 hours Avg 24 hours Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @ 50% growth Avg 24 hours @50% growth) Avg 24 hours @ 50% growth) AFWA to FNMOC 165.0 GB14.0 Mbs 90 GB54.5%81.8%122.7%184%276%414% FNMOC to AFWA 165.0 GB14.0 Mbs 14.0 GB8.5%12.7%19%28.6%43%64.4% Dashboard Legend Latency adequate Latency risk, initiate network upgrade Latency issue, network upgrade needed

13 13 DATMS-U Changes –Spring 2008

14 14 Issues Interagency Modeling CONOPS Under review by JAG/OCM for potential file sizes needed for projections Initial look If GRIB 2 used Bandwidth increase may be within projections If GRIB 1 used Initial projection is 3 to 10X current bandwidth More data exchange will highlight bottlenecks Increased use will accelerate DoD network changes

15 15 Issues Meeting Friday with JAG/DISA/NWS 18 April Discussed future of DATMS-U Short and long term solutions Diverse connections between DoD and NWS clouds Action Items On Scope Of All Team Members Monthly teleconferences Working relationships at TOC, Navy and AF excellent “Spot” teleconferences key to information exchange Information Assurance now engaged


Download ppt "Working Group for Consolidated Communications Management (JAG-CCM) Update Spring CSAB 2008 Mr. Charles Abel AFWA JAG Representative."

Similar presentations


Ads by Google