CRUISE TERMINAL ADVISORY PANEL Meeting of April 19, 2007
2
Berth LOA ─ 1,300 ft. $135k (East) 5 -10,000 cu.yds Avg. Annual Dredge Costs PIER 94 / 96
3
Berth LOA ─ 1,138 ft. Berth LOA ─ 2,317 ft. Berth LOA ─ 1,296 ft. $500 k (All berths + Approach) 110 - 125,000 cu.yds Avg. Annual Dredge Costs PIER 80
4
Berth LOA ─ 1,300 ft. - Unknown - Avg. Annual Dredge Costs PIER 70
5
Berth LOA ─ 1,000 ft. Berth LOA ─ 1,300 ft. $0 k ─ (East) $? k ─ (South) Avg. Annual Dredge Costs PIER 50
6
Ber th LOA ─ 623 ft. $0 (East) Avg. Annual Dredge Costs PIERS 30 / 32
8
Ber th LOA ─ 1,358 ft. $750k ─ (East) 30 – 40,000 cu.yds Avg. Annual Dredge Costs PIER 27
10
$870k ─ (East) $480k ─ (West) 50-65,000 cu.yds Berth LOA ─ 1,055 ft. Berth LOA ─ 807 ft. Avg. Annual Dredge Costs PIER 35