Recent, Large Scale IT Business Innovations at Crutchfield Corporation
2
Barry Tate – I.S. Manager, DBA Group btate@crutchfield.com Craig VanHuss – I.S. Manager, Enterprise Systems cvanhuss@crutchfield.com
3
Changes to www.crutchfield.comwww.crutchfield.com New VoIP Phone System
4
How busy is our site? Avg. 132,000 web sessions/day Avg. 900,000 page views/day Avg. 122.5 MM database transactions/day Avg. 907 GB of data read/written/day
5
How busy is our site? - continued Anticipating a 40% increase during Holiday Avg. 185,000 sessions/day Peak of 262,000 sessions 1.9 MM page views in a single day Avg. 171 MM database transactions/day Avg. 1.2 TB of data read/written/day
6
High-Level Architecture – Before Dedicated server solution for IIS and SQL. Not enough SAN space for all servers, most SQL servers utilized slower DAS. Equates to a lack of flexibility, reduced scalability, and greater licensing and rack costs.
7
High-Level Architecture - Now Virtualized/blade server environment. 14 blade servers, 3 rack mount servers, 25 VM’s High speed SAN storage available for all servers, with SQL utilizing EFD’s. Scalability achieved with less cost and greater speed. Virtualization reduces licensing costs and hardware costs.
8
Business Drivers for Colo Change Cost of rack space Cost of bandwidth On-site support MetroE connectivity to Charlottesville
9
Business Objectives I/O Bottlenecks Affect page load times Page Load times affect ranking on Google Higher Rankings in Google = $$$ Technologies Implemented: EMC SAN Enterprise Flash Drives Failover and Load-Balanced Clustering
10
Business Objectives Scalability Quickly add additional servers to cover load Affect page load times Page Load times affect ranking on Google Higher Rankings in Google = $$$ Quickly remove servers when load trails off Technolgies Implemented: Blade Servers Virtualization (Hyper-V Hypervisor) EMC SAN Failover and Load-Balanced Clustering
11
Business Objectives (cont.) Prepare for PCI 2.0 Compliance Application Segmentation Network Segmentation
12
So how did we do it? Load Testing new site/hardware Data Transfer Configure secure IPSec Tunnel between colo facilites Staged Static Data Replicated Transactional Data Morning of go live Internal Testing Update External DNS All in a window of 6 hours
13
Replace Phone System Entrepreneurial Spirit (a.k.a. “Are you guys nuts!”) Aging Analog phone system with 20th century capabilities VoIP System Completely re-cable Headquarters Replace network infrastructure Move from TDM to SIP Integrate a number of LOB applications into a unified system Phase 1 complete Phase 2 and 3 slated for 2012
14
Internship Opportunities Systems Oriented Year round opportunities in SWVA Client or Server focus Emphasis in systems management DBA Oriented Year round opportunities in SWVA Emphasis on Enterprise level database administration Development Oriented Summer only Charlottesville based
15
Questions?? Barry Tate – I.S. Manager, DBA Group btate@crutchfield.com Craig VanHuss – I.S. Manager, Enterprise Systems cvanhuss@crutchfield.com