STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were.

Similar presentations


Presentation on theme: "STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were."— Presentation transcript:

1 STOPKIT Test - Ø14” & Ø6” Pipe Spools Set up 14”Ø Pipe 6mm Hole at Plain Pipe6”Ø Elbow 4mm Hole at Weld Heat Affected Zone Note:- Both pipe spools were Hydro tested at 120 BarG prior to drill to perform the STOPKIT TEST

2 Arresting an air Leak Under 7.0 BarG Pressure. Ear protection required due to high noise level. Leak Arrested at 10 N.m Torque. STOPKIT Test at 14ӯ Plain Pipe with a 6mm Hole Note:- After air test the spool was filled with water and successfully tested at 80 BarG - 20 N.m Torque

3 Water Leak with Initial Pressure kept at 2.5 BarG. As the leak rate started to be reduced the pressure was gradually increased to 80.0 BarG to assess the STOPKIT performance. STOPKIT Test 6” Elbow with a 4mm Hole at Weld HAZ

4 40 N.m Torque Applied Pressure 80.0n BarG STOPKIT Test 6” Elbow with a 4mm Hole at Weld HAZ 44 N.m Final Torque Minor Leak - Tear Leak Permanently Arrested

5 6” Elbow 14”Ø Pipe80.0 BarG STOPKIT Final Test at 80.0 BarG - Ø6” Elbow & Ø14” Pipe

6 STOPKIT 100 – Large Pad for Major Leaks 25mm Hole on Plain Pipe Pressurized up to 36.0 BarG. Evidence of Leak at around 30.0 BarG. Pressure Stabilized at 25.0 BarG – Leak Stopped STOPKIT 100

7 4mm Hole on Top of the Weld - Tested up to 36.0 BarG. No Evidence of Leaks STOPKIT 50 – Smaller Pad for pinholes STOPKIT 50