ACCA Legislative Conference Underground Storage Tank Compliance
December 4, 2014 Lee Davis, UST Compliance adem.alabama.gov
2
UST Compliance Program Outline
UST Program Overview Regulatory Requirements 2005 Energy Act adem.alabama.gov
3
Definition of UST Tanks and Piping Contains Regulated Substances
10% or More Underground adem.alabama.gov
4
USTs adem.alabama.gov
5
Regulated Universe Regulated Facilities ~ 5,600
Regulated Tanks ~ 15,300 Number of Tank Owners ~ 3,100 adem.alabama.gov
6
Inspectors 9 UST Inspectors in 4 Field Offices
Approximately 400 inspections per inspector, per year adem.alabama.gov
7
Performance Standards USTs and Piping
Fiberglass-Plastic Construction, or Steel and Protected from Corrosion Piping Nonmetallic, or adem.alabama.gov
8
UST adem.alabama.gov
9
Piping adem.alabama.gov
10
Performance Standards Spill Prevention
To contain the volume of the delivery hose after disconnecting adem.alabama.gov
11
Spill Catchment Basin adem.alabama.gov
12
Performance Standards Overfill Prevention
Activated by product level to prevent tank overfills adem.alabama.gov
13
Overfill Prevention Flapper Valve
4 1 2 3 2 3
14
Overfill Prevention Ball Float Valve
3 2 1
15
Regulatory Requirements Testing and Reporting
Corrosion Protection Leak Detection Spill Catchment Basin Closure Suspected Releases adem.alabama.gov
16
Testing CP Test Cathodic protection test required once every three years adem.alabama.gov
17
Cathodic Protection System
adem.alabama.gov
18
Impressed Current Anode
adem.alabama.gov
19
Rectifier adem.alabama.gov
20
Galvanic Cathodic Protection System
adem.alabama.gov
21
Release Detection Tanks – must have monthly method of monitoring for releases Pressurized Piping - must have annual line test or monthly monitoring Suction Piping – No monitoring required if “safe suction” adem.alabama.gov
22
Automatic Tank Gauge adem.alabama.gov
23
Testing Leak Detection
Leak Detectors - equipment that will shut off or restrict flow of product if a leak is detected – Annual test Sump Sensors – Annual test adem.alabama.gov
24
Testing & Reporting SIR Annual Summary Report
Line Tightness Tests Annual Line Leak Detector Tests Annual Cathodic Protection Tests 3 Year Spill Catchment Basins 3 Year adem.alabama.gov
25
Reporting Closure and Releases
Permanent Closure of a UST System Suspected releases must be reported within 24 hours. Investigation and Corrective Action adem.alabama.gov
26
Suspected Release adem.alabama.gov
27
Secondary Containment Delivery Prohibition Operator Training
2005 Energy Act Secondary Containment Delivery Prohibition Operator Training adem.alabama.gov
28
Secondary Containment Effective August 6, 2007
Tank and Piping Manufactured with Inner and Outer Wall and Interstitial Space Interstitial Monitoring Only Acceptable Form of Leak Detection adem.alabama.gov
29
Submersible Pumps Effective August 6, 2007
USTs installed with submersible pumps on August 6, 2007 and thereafter, must have submersible pump containment sumps. adem.alabama.gov
30
Sub Pump Sump adem.alabama.gov
31
Under Dispenser Containment Effective August 6, 2007
New Dispenser System Includes Equipment Necessary to Connect to UST System adem.alabama.gov
32
Under Dispenser Containment
adem.alabama.gov
33
Delivery Prohibition 2005 Energy Act
Prohibition of delivery or acceptance of product for non-compliant UST facilities Penalty for owner and deliverer Regulations Effective April 25, 2008 adem.alabama.gov
34
Delivery Prohibition adem.alabama.gov
35
Delivery Prohibition Reasons
Delivery prohibition may be imposed for failure of an owner to: Install, operate and/or maintain cathodic protection, leak detection, under dispenser containment, or spill or overfill controls Ensure compatibility of UST with product Perform required testing Pay regulatory fees Take corrective action for releases adem.alabama.gov
36
Delivery Prohibition ADEM Steps
How will ADEM notify owners they are subject to delivery prohibition? Notice of Delinquency Notice of Violation Notice of Delivery Prohibition Opportunity to meet with Department adem.alabama.gov
37
Delivery Prohibition DP List
How will ADEM notify fuel delivery companies that a facility is prohibited from delivery? Delivery Prohibition List on ADEM web site Delivery Prohibition List updated every Wednesday at 12:00 a.m. adem.alabama.gov
38
Delivery Prohibition Owner Response
How can owners be removed from the Delivery Prohibition List? Return to Compliance Submittal of documentation ADEM will remove facility from list ADEM will send letter adem.alabama.gov
39
Operator Training adem.alabama.gov
40
Operator Training 2005 Energy Act
Operators must be trained by August 8, 2012. Three classes of operator adem.alabama.gov
41
UST Trust Fund Registration Motor Fuel Substantial Compliance Orders
Spill Prevention Overfill Prevention Corrosion Protection Release Detection adem.alabama.gov
42
AST Trust Fund Registration Motor Fuel SPCC Plan NPDES Permit
adem.alabama.gov
43
UST Compliance Program
I Can Answer Any Questions You May Have Now. adem.alabama.gov
44
Chief, UST Compliance Unit (334) 271-7759 mld@adem.state.al.us
Contact Information – Lee Davis Lee Davis Chief, UST Compliance Unit (334) UST Switchboard (334) adem.alabama.gov