Download presentation
Presentation is loading. Please wait.
Published byClarissa Holland Modified over 9 years ago
1
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR Title slide PIPELINE QRA SEMINAR
2
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS POINTS OF VULNERABILITY Pigging-and Metering Stations UGS-and Compressor StationsLine Valve Stations and Tie-ins Pipeline itself may be vulnerable
3
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS DETECTION OF INCIDENTS
4
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS DETECTION OF INCIDENTS
5
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS US STATISTICS
6
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS US STATISTICS
7
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS US STATISTICS Construction machinery Quake damage
8
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS NUMBER OF INCIDENTS PER YEAR IN EUROPEAN PIPELINES
9
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS PIPELINE INCIDENTS BY CAUSE IN EUROPEAN PIPELINES
10
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS PIPELINE INCIDENTS BY CAUSE IN EUROPEAN PIPELINES
11
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS EXTERNAL INTERFERENCE BY PERCENTAGE Note: The sum above amounts to 73 %, the balance to 100 % falling into the group “Other”.
12
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATIONSHIP BETWEEN EXTERNAL INTERFERENCE, LEAK SIZE AND DIAMETER
13
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATIONSHIP BETWEEN EXTERNAL INTERFERENCE, LEAK SIZE AND DEPTH OF COVER
14
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATIONSHIP BETWEEN EXTERNAL INTERFERENCE, LEAK SIZE AND WALL THICKNESS
15
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN CORROSION, LEAK SIZE AND YEAR OF CONSTRUCTION
16
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN CORROSION, LEAK SIZE AND TYPE OF COATING
17
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN CORROSION, LEAK SIZE AND WALL THICKNESS
18
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN CONSTRUCTION/MATERIAL FAILURE, LEAK SIZE AND CONSTRUCTION YEAR
19
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN HOT TAP ERROR, LEAK SIZE AND DIAMETER
20
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES - HAZARDS RELATION BETWEEN GROUND MOVEMENT, LEAK SIZE AND DIAMETER
21
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES-HAZARDS SUBCAUSES FOR GROUND MOVEMENT Note: The group “Other” may be lightning, seismic events, etc.
22
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR PIPELINES-HAZARDS RELATION BETWEEN FAILURE FREQUENCY BY CORROSION AND AGE OF PIPELINE
23
SEPTEMBER 8-12, 2014 INOGATE PIPELINE QRA SEMINAR END OF TYPICAL HAZARDS FOR PIPELINES End slide
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.