Eliminate Routine Well Site Checking
2
Backgrounder Advanced Flow Technology – Calgary, Alberta – 7 Years in gas well monitoring – 1 year oil well monitoring – Patented technologies using temperature and acoustics Len Johnson – 30 years’ CEO technology companies – Last company: Advanced Measurements Inc.
3
Goals Validation of potential in US market – We know the Great White North, but.. Beta Test Partner – Fall time frame
4
Well Site Visits Over 700,000 oil wells in North America – Majority low production, manually monitored – 50% of operator time spent checking! Is the well producing as expected? – Pump Working? – Fluid being produced? – At the expected levels Is there a leak at the well head?
5
Well Monitoring Choices: SCADA Controller : $10k-$25kBert: Have Truck Will Travel: $800 per well/month
6
Filling the Gap Field based system – Low Cost ($3,000 range) – Self Powered – Easy to Install: Any well, anywhere – Cellular Network for communication – Class 1 Div 1 – All weather conditions
7
Information Easy to access and understand – Simple – Available from Smart Phone, Computer… Provides answers to basic questions: – Pump working, – well producing at expected levels, – not leaking Manage by exception
8
Manage by Exception Green = all systems go Yellow = maybe a problem Red= go to the well Click on an icon to drill down for well status
9
Is the Pump Working?
10
Is the pump working?
11
Is Fluid Being Produced?
12
Is Fluid being produced? ΔT = VariableΔT = 0 FlowingNot Flowing
13
Normal : Well Producing
14
Reduced Flow
15
Well Down
16
Delta T: Simple but powerful Any flow change – Flow trends easily spotted Sub-surface problems spotted in near real time Big reduction in requirement to trouble shoot – Fluid shots, putting wells on test
17
Is It Leaking?
18
Considerations for Leak Detection Accurate detection of leaks – 0 false negatives – Very limited tolerance for false positives Timely – Within hours
19
Not a Problem
20
Problem?
21
Problem
22
Leak Notification Green well, all good Sliding scale for notification – Notify when somewhat oily? – Notify only when visit is required? – Different levels of notification for field vs. office?
23
Benefits of Reduced Visits Lower Costs – 50% of operator time spent on routine checking – Leak remediation costs reduced Fewer Safety Incidents Higher Production – Problems spotted immediately – Operator time shifted from problem finding to problem solving
24
Summary The pump is working Fluid is being produced – At the expected level There is no leak Do we need to send a guy to the well?
25
The Ask 2-3 parties to advise and assist Some personnel time required in field 5-10 wells each Fall for field beta test