Stevens-Rugg Brook: Diversion Structure Improvement Alternatives St Albans, Vermont
2
Background Flood damage to homes, businesses, rec areas, and ag areas led to need for detention structure between Stevens and Rugg Brooks Water quality, sediment and erosion concerns Three proposed initial routes: railroad, power line, trailer park
3
Many problems existed between the city and landowners leading to the selection and implementation of the power line alternative. 1974 construction began on structure Stevens Brook diverts water to Rugg Brook
4
Detention Structure Map of Jewett Brook and Mill River Watersheds Two streams are Stevens (N) and Rugg (S) City of St Albans in orange/teal
5
Problem The existing St. Albans diversion structure is not effective at preventing floods during high water flow events and does not produce effluent that meets water quality standards.
6
Stevens Brook and existing Culvert Culvert holds 70 cfs when full Base flow is 2 cfs When flow exceeds 70 cfs, pooling occurs which leads to diversion structure
8
Diversion Structure: Sediment Basin
9
Diversion Structure: Outlet weir
10
Diversion Structure: Outlet
11
Diversion Structure: Rugg Brook
12
Problem: Sedimentation
13
Problem: Debris Accumulation
14
Problem: Water Quality
15
Problem: Erosion-Stevens
16
Improvement Measures: 1 Construct Sediment Traps in Existing Basin Excavate permanent deep pools for sediment revegetation for aquatic habitat Removal of pollutants bound to sediments
17
Measure 1: Engineer Drawing
18
Improvement Measures: 2 Construct Detention Basin by Excavating Diversion Channel Excavate 2-3 ft deep basin at downstream end Low flow outlet in existing weir Sediment forebay at head of basin Revege for aquatic habitat
20
Improvement Measures: 3 Construct Detention Basin by Raising Outlet Structure Low flow outlet at current elevation, raise weir 1-2 feet Sediment forebay at head of basin Revege for aquatic habitat
22
Improvement Measures: 4 Construct Enhanced Wetland in Diversion Channel Enhance habitat Sinuous low flow channel for settling Shallow and deep pools Sediment forebay Revegetation for aquatic habitat
23
Alternative Constructed Wetlands Flood attenuation Pollutant removal Aquatic habitat Extended detention wetland Pond/wetland system Pocket wetland
24
Findings: Multiple Criteria Decision Analysis
25
From MCDA most important criteria are: pollutant removal, flood water detention and stream geomorphology Pollutant Removal Flood Water Detention Geomorphology of Rugg Brook Total Measure 13014 Measure 21337 Measure 31124 Measure 43014
26
Recommendations: MCDA Measure 2: sediment forebay and detention pond Constructed wetland close to outlet including native plant stock Reduction and development of effective impervious surfaces in the city of St Albans. Riparian buffers
27
Recommendations: Buffer Stevens Brook Bank stability Reduce sedimentation
28
Buffer Along sides of detention pond and constructed wetland Increase bank stability Habitat Aesthetics
29
Recommendations: Monitoring and Maintenance Are the improvements functioning as designed? Future sediment removal and disposal Testing effluent against water quality standards Geomorphologic assessment of Rugg
30
Acknowledgments Erica Gaddis Breck Bowden Dan Lindly: Town administrator Bonnie Wagner: Northwest Regional planning Commission