CMS Si-Tracker Project – August 17, 2006 - Bagby 2 Scope of Work Generate Tracker maps for Power and Control cables Cooling Pipe Format is currently in Excel spreadsheets Needs to be downloaded into the ‘official’ database
3
CMS Si-Tracker Project – August 17, 2006 - Bagby 3 Power and Control Cable Map Map variables for each detector End Layer Sector (-TIB/-TID) Cooling Loop Control Loop Petal, String, Rod Arc Position TOB TEC TIB- TID- End Sector Stack (Board) Connector Rack Crate Slot Channel DEFINED REQUIRED
4
CMS Si-Tracker Project – August 17, 2006 - Bagby 4 Cooling Pipe Map Map variables for each detector End Layer / Sector Control Ring Cooling Loop Arc Position TOB TEC- TIB TID End Sector (A / C) Pipe designation End +/- X (Near / Far) Detector Inlet (A) / Outlet (C) Flow Type Position DEFINED REQUIRED
5
CMS Si-Tracker Project – August 17, 2006 - Bagby 5 Resources Engineering distribution: Andrea Moggi MARGHERITSA_FINALE-upd_ago_06.zip PP1-Final-ver4-3_Tot-PIPES.xls Nick Lumb Tkges017b-modif 19october2005-a-4.pdf TEC_pipes_Oct05.xls Antti Onnela TOB_cooling_manifold_and_feed-pipes_28072006.xls Paola Tropea 060719_Tkcooling_names.xls 060714_SiStrip_lineNb.pdf Mechanical distribution Hans, Sabastian services_distr15sept05.xls
6
CMS Si-Tracker Project – August 17, 2006 - Bagby 6 How many pipes per sector??? Depends on who you talk to….. Engineering distribution based on A=Inlet and C=Outlet Range discrepancy: Working with TEC and TIB to resolve this issue. Hans distribution (looks like) it doesn’t follow same constraint Distribution discrepancy: Investigating why quadrant distribution doesn’t match Engineering for TEC, TIB, and TID—Mechanical constraints?? We are confident pipes can be arranged to meet 7 count limit.
7
CMS Si-Tracker Project – August 17, 2006 - Bagby 7 Summary Documentation required Power and Control Cable Map Sector assignments for –TIB, -TID Arc positions for TEC, -TIB, -TID PP1 Connector Assignments Electronics Crate, Slot, Channel assignment Indexed cross-sectional drawing of PP1 input and output Correspondence between arc position PP1 rack channel Cooling Pipe Map Arc positions for –TEC Indexed cross-sectional drawing of PP1 input and output Pipe plant from PP1 cooling panel Can only assign range now. Pipe Count Investigating discrepancies between Engineering and Hans pipe distribution. Time Scale Obtain required documentation by August 24. Deliver maps by end of September.
8
CMS Si-Tracker Project – August 17, 2006 - Bagby 8 Back Up Material
9
CMS Si-Tracker Project – August 17, 2006 - Bagby 9 + Z Inlet Distribution
10
CMS Si-Tracker Project – August 17, 2006 - Bagby 10 + Z Inlet Findings TOB Total agreement with mechanical distribution. TEC +/- x positions verified. Cooling panel pipe count includes historical spare. TID/TIB 10/14 sectors have different distributions. 3 extra pipes assigned by mechanical group (mechanical constraints?)
11
CMS Si-Tracker Project – August 17, 2006 - Bagby 11 +Z Outlet Distribution
12
CMS Si-Tracker Project – August 17, 2006 - Bagby 12 + Z Outlet Findings TOB Total agreement with mechanical distribution. TEC 12/14 sectors have different distributions. +/- x positions verified. Cooling panel pipe count includes historical spare. TID/TIB 10/14 sectors have different distributions. 3 pipe quantity reduction by mechanical group.
13
CMS Si-Tracker Project – August 17, 2006 - Bagby 13 + Z Sector Totals (A + C)
14
CMS Si-Tracker Project – August 17, 2006 - Bagby 14 - Z Inlet Distribution
15
CMS Si-Tracker Project – August 17, 2006 - Bagby 15 - Z Inlet Findings TOB Total agreement with mechanical distribution. TEC 12/14 sectors have different distributions. +/- x positions verified. Cooling panel pipe count includes historical spare. TID/TIB 14/14 sectors have different distributions. 1 extra pipe assigned by mechanical group (spare?)
16
CMS Si-Tracker Project – August 17, 2006 - Bagby 16 - Z Outlet Distribution
17
CMS Si-Tracker Project – August 17, 2006 - Bagby 17 - Z Outlet Findings TOB Total agreement with mechanical distribution. TEC 12/14 sectors have different distributions. Cooling panel pipe count includes historical spare. TID/TIB 10/14 sectors have different distributions. 1 pipe quantity reduction by mechanical group.