FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents.

Similar presentations


Presentation on theme: "FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents."— Presentation transcript:

1 FINAL TESTING AND SEALING ACTIVITIES

2

3 The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents of the box PCOS machine and its power adaptor 10 test ballots 13 rolls of official thermal paper 1 envelope containing the back-up memory 3 labeled PINS of the BEI 1 labeled PIN for Re-Zeroing Modem/bridge or BGAN, if any.

4

5

6

7

8

9 REPUBLIC OF THE PHILIPPINES AUTOMATED ELECTIONS BEI AUTHENTICATION Please insert security key for authentication LCD SW ver 103,15 The Chairman shall place the iButton security key on top of the security key receptacle. PCOS will beep to indicate that it is ready to accept instructions from the BEI

10 ******

11 REPUBLIC OF THE PHILIPPINES AUTOMATED ELECTIONS BEI Security Key verified LCD SW ver 103,15 ERROR VALIDATING SECURITY KEY Please try again and remember to press firmly against the reader LCD SW ver 103,15

12 IS THIS THE CORRECT TIME? 2013:02:19 10:00:00 YESNO Select “YES” if the date and time is correct, and enter such fact in the minutes.

13 SET YEAR 2013:02:19 10:00:00 +++ Select “NO” if the date and time is incorrect. Then screen will ask the BEI to set the correct date and time, and ask for the correct: A. YEAR. If year is correct, press “DONE”. If not, +++ / ---- button until the year displayed the current year. B. MONTH. If month is correct, press “DONE”. If not, +++ / ---- button until the month displayed the current month. C. DAY. If day is correct, press “DONE”. If not, +++ / ---- button until the day displayed the current day. DONE ---

14 Select “NO” if the date and time is incorrect. Then screen will ask the BEI to set the correct date and time, and ask for the correct: D. HOUR. If hour is correct, press “DONE”. If not, +++ / ---- button until the hour displayed the current hour E. MINUTE. If minute is correct, press “DONE”. If not, +++ / ---- button until the minute displayed the current minute. SET HOUR 2013:02:19 10:00:00 +++ DONE ---

15 Wait until the MAIN MENU is displayed SET HOUR 2013:02:19 10:00:00 +++ DONE ---

16

17

18

19

20

21

22

23

24

25 TESTING MODEM DEVICE PLEASE WAIT PCOS shall automatically test the modem device and displayed the message. MODEM FAILED (1015 ) Ignore this message during the FTS since the modem is not connected to the PCOS

26

27

28

29 When DISPLAY is selected, PCOS shall display the Diagnostics Report When this message appears during FTS, ignore this since the modem is not connected to the PCOS.

30 After printing the Diagnostic Report, the PCOS will display a message, press the NO option.

31

32

33 INITIALIZING VOTE COUNTERS (Ensuring that vote counters are set to zero) PLEASE WAIT… RESULTS HAVE BEEN ZEROED

34 WOULD YOU LIKE TO PRINT MORE COPIES OF THE ZERO TAPE? PRINTING INITIALIZATION REPORT PLEASE WAIT… YESNO Press “NO” if you do not want to print more copies of Zero Tape.

35

36

37

38

39

40

41

42

43 READY TO TRANSMIT PLEASE PLUG IN TRANSMISSION CABLE TO ELECTRONICALLY TRANSMIT THE ELECTION RESULTS AND PRESS OK TO CONTINUE Do not plug transmission cable. Press “SKIP” option.

44

45

46

47

48

49

50

51

52 a. Disconnect the battery cable - from the PCOS machine; b.- from the battery; c. Disconnect the power adaptor - from the electrical outlet; d. - from the PCOS machine; e. Insert the Back-up memory card in the Administrator slot and seal with plastic security seal; f. Place iButton inside the printer compartment of the PCOS, g. Cover the printer and seal with plastic security seal;

53 h.Record in the Minutes the serial numbers of the plastic security seals used; i.Place the battery and its peripherals inside the battery box; j.Place inside the PCOS box the following: The PCOS and its power adaptor PINs for re-zeroing and 2 copies of the Minutes in their envelopes k. Seal the PCOS box with the paper seal provided for the purpose, and l.Allow the watchers of the PPCRV to place their own seal.

54 FINAL TESTING AND SEALING ACTIVITIES Reception Installation Diagnostics Accessing Main Menu Open Voting – Initialization Open Voting – Test Voting Close Voting Printing of 8ERs Nat’l. & Local (No Transmission) Zeroing Shutdown Install Backup Memory Sealing FINAL TESTING AND SEALING ACTIVITIES Reception Installation Diagnostics Accessing Main Menu Open Voting – Initialization Open Voting – Test Voting Close Voting Printing of 8ERs Nat’l. & Local (No Transmission) Zeroing Shutdown Install Backup Memory Sealing

55 THANK YOU!


Download ppt "FINAL TESTING AND SEALING ACTIVITIES. The BEI shall check the contents of the PCOS box based on the checklist found inside the PCOS: Checklist of contents."

Similar presentations


Ads by Google