Vaiont Dam Matt Hanson (4002290) Chris Nicholson (4004603)
2
INTRODUCTION One of the Largest Dams in the World Completed in 1961 Cupola dam 266m high Lies on the Vaiont River Generates Hydro-Electric Power Stored Water spilt over the Dam
3
GEOLOGY Geological Structure – Syncline Sedimentary Rocks – Shale and Limestone Slip Surface along Weak Bedding Planes Reservoir Filled Old Slip Surface Began to Move
4
GEOLOGY
5
WHAT HAPPENED
6
ENGINEERING APPROACHES Groundwater Pressures – increase drainage Geology Consulting – saturated clay layer Slip Surface Engineer’s Error
7
SOLUTIONS ADOPTED Feb 1960 - 1 st filling of Reservoir – varying level of water Oct 1961 - 2 nd filling – surface movement rates increased April 1963 - 3 rd filling – movement rates increased further Sept 1963, water levels dropped to bring creep under control October 9 th – catastrophic failure
8
CONCLUSION Reservoir Inappropriate for Area Engineers Incompetence Major Disaster for Civil Engineering Highlighted the importance of Geological Surveys