BCT 122 Roof Framing 1 Roof Framing Procedure Sequence.

Similar presentations


Presentation on theme: "BCT 122 Roof Framing 1 Roof Framing Procedure Sequence."— Presentation transcript:

1 BCT 122 Roof Framing 1 Roof Framing Procedure Sequence

2 Wall Plate Check & Layout Verify (measure) building span dimensions. Check walls for straight and bracing. Lay out plates for rafter and Joist O/C spacing.

3

4 Ceiling Joist Ceiling joist parallel to rafters that make the entire span may fall to either side of the rafter and are nailed securely to the wall plate (3 – 8d) and laterally into the rafter. (3 – 10d) If the ceiling joist does not span, it must be lapped a minimum 3” and nailed together. Ceiling joist starting on opposite sides of the rafter require a block under the rafter to tie the rafters on the interior partition. Joists may need to be clipped if they extend above the rafter. Remember Crown up!

5 Joist Blocks

6 Clip Joist Ends if Necessary

7 Calculating the Common Rafter Using the Pythagorean theorem, calculate the hypotenuse of 12” unit run & the given rise. This is the unit line length. Line length factor is the unit LL ÷ 12”. The rise factor is the unit rise ÷ 12”. The rafter length is unit LL x ½ the span. The rafter tail length is overhang inches x LL factor. The rafter shortened for a ridge board is ½ the ridge thickness x the LL factor or ½ the ridge thickness perpendicular to the plumb cut.

8


Download ppt "BCT 122 Roof Framing 1 Roof Framing Procedure Sequence."