NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). DWG. / PHOTO. NO. DATE: 5/31/13 REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-1 MAJOR MAINTENANCE FY 14 CFA P THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS UPPER ROOF LOWER ROOF HIGH ROOF WORK LOCATION PLAN N.T.S. NOTE: REFERENCE SECTION 00200B FOR A COMPLETE SCOPE OF WORK REQUIRED – TYPICAL FOR ALL PHOTO SHEETS. P1 P2 P3 P4 P5 P7 P8 P9 P10 P6 P11 P12 P13 SEQUENCE OF WORK: 1. REPOINT LIMESTONE MORTAR JOINTS AS IDENTIFIED 2. RE-CAULK IDENTIFIED CAULK AREAS NOTE: DO NOT DISRUPT EXISTING CAULK JOINTS, TYPICAL 3. REPAIR CRACKS 4. PERFORM EXTERIOR CLEANING 5. APPLY WATER REPELLENT / COATING 6. WASH ALL WINDOWS P14 P15 CFA P - THEATER CFA - DESIGN STUDIO CFA R - DANCE P16 P17 N CONCRETE PAVER PATIO LOADING DOCK WALLS P18 P19 LEGEND AREAS TO BE REPOINTED, RE-CAULKED OR CRACKS TO BE REPAIRED (SEE PHOTO SHEETS FOR SPECIFIC SCOPE CLARIFICATIONS) LIMESTONE & CONCRETE TO BE POWERWASHED. ALSO, LIMESTONE & CONCRETE TO RECEIVE WATER REPELLANT (SEE PHOTO SHEETS) CONCRETE TO BE POWERWASHED ONLY (APPLICABLE TO BOTH SIDES OF LOADING DOCK WALLS – SEE PHOTO SHEETS) AREA TO BE POWERWASHED. ALSO, CONCRETE TO RECEIVE THOROSEAL WATERPROOF CEMENT-BASED COATING. COLOR SHALL BE GRAY AND SHALL BE APPLIED 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE HIGH ROOF PERIMETER. WATER REPELLANT SHALL BE APPLIED ABOVE THOROSEAL COATING.
2
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-2 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P1 REPOINT INDIVIDUAL MORTAR JOINTS AS SHOWN DATE: 5/31/13
3
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-3 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P2 REPOINT ALL MORTAR JOINTS AT THE SOUTH WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA. DO NOT DISRUPT CAULK JOINTS. DATE: 5/31/13
4
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-4 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P3 REPOINT INDIVIDUAL MORTAR JOINTS AS SHOWN DATE: 5/31/13
5
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-5 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P4 REPOINT ALL MORTAR JOINTS AT THE NORTH WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (TOTAL OF 5 COURSES). DO NOT DISRUPT CAULK JOINTS DATE: 5/31/13
6
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-6 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P5 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (TOTAL OF 6 COURSES). DO NOT DISRUPT CAULK JOINTS DATE: 5/31/13
7
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-7 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS UPPER ROOF P7 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA P6 REPOINT ALL MORTAR JOINTS 6 COURSES DOWN AT AS SHOWN WITHIN THE HATCHED AREA – INCLUDE CORNERS. DATE: 5/31/13
8
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-8 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P8 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (4 FULL LIMESTONE BLOCKS FROM THE CORNER TO THE NORTH) 4 FULL LIMESTONE BLOCKS DATE: 5/31/13
9
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-9 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P8 REPOINT ALL MORTAR JOINTS AT THE EAST WALL ELEVATION AS SHOWN WITHIN THE HATCHED AREA (4 FULL LIMESTONE BLOCKS FROM THE CORNER TO THE NORTH) P9P10P11P12P13P14 DATE: 5/31/13
10
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-10 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS SOUTH WALL ELEVATION HIGH ROOF UPPER ROOF DATE: 5/31/13 PROTECT ROOF REPLACED 8/2012 P15 SOUTH ELEVATION: CRACK REPAIR, 3 LOCATIONS. REFERENCE SHEET C-3, DETAIL A FOR REPAIR REQUIREMENTS. EAST & WEST ELEVATIONS: NO REPAIRS APPLY THOROSEAL WATERPROOF CEMENT-BASED COATING 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE PERIMETER - COLOR SHALL BE GRAY APPLY WATER REPELLENT TO ALL ELEVATIONS – ABOVE THOROSEAL COATING. SOUTH WALL ELEVATION 8’ WEST WALL ELEVATION THOROSEAL COATING
11
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-11 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 5/31/13 PRIOR TO THE START OF WORK, PROTECT ROOF. ROOF WAS REPLACED 8/2012 UPPER ROOF P15 NORTH ELEVATION: CRACK REPAIR AT BASE OF WALL, 5 LOCATIONS, DETAIL A ON SHEET C-3. CONCRETE/REBAR REPAIR, 1 LOCATION, DETAIL C ON SHEET C-3. APPLY THOROSEAL WATERPROOF CEMENT- BASED COATING 8’ ABOVE UPPER ROOF ELEVATION AROUND ENTIRE PERIMETER - COLOR SHALL BE GRAY. APPLY WATER REPELLENT TO ALL ELEVATIONS, ABOVE THOROSEAL COATING. NORTH WALL ELEVATION 8’ THOROSEAL COATING
12
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-12 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P16 REPOINT ALL MORTAR JOINTS AS SHOWN. REMOVE EXISTING CAULK AND RECAULK TREADS & RISERS WITHIN IDENTIFIED AREA SHOWN. 4 FULL LIMESTONE BLOCKS DATE: 5/31/13
13
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-13 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P17 REPOINT ALL MORTAR JOINTS AS SHOWN. REMOVE EXISTING CAULK AND RECAULK TREADS & RISERS WITHIN IDENTIFIED AREA SHOWN. DATE: 5/31/13
14
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-14 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS P18 REMOVE FIRE ALARM BELL COVER AND CAULK AROUND PERIMETER OF CONDUIT PENETRATION – TYPICAL OF 2 LOCATIONS. DATE: 5/31/13 P19 REMOVE EXISTING CAULK ALONG THE ENTIRE VERTICAL HEIGHT OF THE LOADING DOCK RETAINING WALL. INSTALL NEW CAULK TO REPLACE REMOVED CAULK.
15
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-15 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS UPPER ROOF HIGH ROOF (NOT VISIBLE IN THIS PHOTO) LOW ROOF DATE: 5/31/13 SOUTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION
16
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-16 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS LOW ROOF N DATE: 5/31/13 LOW ROOF PROTECT ROOF REPLACED 8/2012 SOUTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION
17
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-17 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS UPPER ROOF LOW ROOF DATE: 5/31/13 WEST ELEVATION PHOTOS – FOR REFERENCE AND ORIENTATION
18
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-18 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS HIGH ROOF UPPER ROOF DATE: 5/31/13 WEST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION
19
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-19 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS DATE: 5/31/13 NORTH ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION LOADING DOCK RETAING WALLS
20
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-20 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS UPPER ROOF HIGH ROOF UPPER ROOF LOW ROOF DATE: 5/31/13 EAST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION
21
PHOTO. NO. REVISIONS Construction Services 170 Long Lane Middletown, CT 06459 WESLEYAN U N I V E R S I T Y P-104-21 CFA J THEATER – EXTERIOR WATERPROOFING SECTION 00020 - EXISTING CONDITION PHOTOS LOW ROOF DATE: 5/31/13 EAST ELEVATION PHOTO – FOR REFERENCE AND ORIENTATION