PROJECT OVERVIEW
3
EWB Mission Statement “EWB-USA is a nonprofit humanitarian organization established to support community-driven development programs worldwide through partnerships that design and implement sustainable engineering projects, while creating transformative experiences that enrich global perspectives and create responsible leaders.”
4
Timeline September 2012 – Kenya team formed August 2013 – Pre-assessment trip, decided on Muchebe Primary School for project January 2014 – Assessment trip, gather data for design, survey community members August 2014 – Implementation trip August 2015 – Assessment trip August 2016 – Implementation trip
5
Biggest Need?
6
Muchebe Quick Facts 2,000 people in village One school - Muchebe Primary School Water sources: –Rebohocha River (typhoid) –Nymatembe River (amoeba disease) –Hibwa River (E. Coli and typhoid) –Muchebe Rainwater Catchment System (nothing!)
7
Muchebe Primary School 339 students this year, pre-school through Class 8 Classes in math, Swahili, English, geography, science
8
System already in place when we arrived at Muchebe 20,000 L storage capacity collecting only from 25% of roof area 7,000 L of water storage space wasted with two empty tanks Previous NGO work 10,000 L not connected not connected
9
Spring 2014 EWB Design Additional 50,000 L of storage space Collecting from 100% of roof area Total of 70,000 L of water 2L/student/day
10
Theory vs. Reality Rock in the way of original tank cluster design 4 tanks instead of 5, but connected smaller tanks too Still collecting water from 100% of the roof area 67,000 L capacity for water storage
11
IMPLEMENTATION PHASES
12
1. Digging the Foundation Pit Stone Problem L-shaped 8.2 x 6.8m L shape, 3.2m wide
13
2. Building Concrete Foundations Formwork Wire-mesh Concrete mixture Leveling and sloping
14
2. Building Concrete Foundations
16
3. Building Dispensing Stations 2 Taps Roof Shelter Sloping Drainage Hole
17
4. Guttering Interconnection Downspout pieces End cap pieces Gutter clips Bondex!
18
5. Trenching and Piping Trenches ~1 foot wide 3 inch vs. 4 inch pipe T and elbow fittings O-ring connections
19
5. Trenching and Piping
20
Downspouts First Flush system Inlet pipes
21
6. Tank Placement and Connections
23
Joint tape Union, washout, socket, nipple, flanges
24
Sustainability through Ownership Meetings with School Management Committee Operations & Maintenance
25
Sustainability through Education
27
Future Work Assessment Trip, August 2015 To prepare for our next trip, our team this year will: –Monitor data from 2013-2014 system. Outline different design concepts for next project in Muchebe –Reach out to Muchebe village/school. Brainstorm and prepare sustainability lessons. Educate EWB team on Kenyan history, diseases, etc.
28
Questions?