Download presentation
Presentation is loading. Please wait.
Published byJocelyn Parrish Modified over 9 years ago
1
Orland Dam U.S. Fish & Wildlife Service Maine Fishery Resources Office East Orland, ME Scott Craig 207 469-6701 x226 44.570 -68.743 Hancock County, ME May 16, 2011 Noon +11.0 ft June 17, 2011 5PM +2.6 ft Spillway 12.3 ft Spillway 12.3 ft June 2011
2
Orland Dam
3
May 16, 2011 Noon +11.0 Ft
4
May 16 2011 Noon +11.0 Ft Left Fishway is ½ (8ft) as long as the right (15ft). Left Fishway is missing 6+ baffles
5
May 16, 2011 Noon +11.0 Ft Text 11.9 ft High Tide for Day 11.0 ft
6
May 16, 2011 Noon +11.0 Ft Text
7
May 16, 2011 Noon +11.0 Ft Text 11.9 ft 12.3 ft 11.0 ft
8
May 16, 2011 Noon +11.0 Ft Alewife Trap 11.9 ft 12.3 ft
9
May 16, 2011 Noon +11.0 Ft Text
10
May 16, 2011 Noon +11.0 Ft Text
11
June 17, 2011 5PM +2.6 Ft Text 4.8 ft 8.5 ft 11.3 ft 14.4 ft 10.7 ft 16.3 ft
12
Time Height (ft) http://www.ezfshn.com/tides/usa/maine/Bucksport/may/16 No Passage Longer Fishway 15ft 4.8 ft Spillway 12.3 Feet 10.7 ft Short Fishway 8ft No Passage 7.6 ft 10.7 ft Missing Baffles
13
June 17, 2011 5PM +2.6 Ft 7.6 ft
14
June 17, 2011 5PM +2.6 Ft Text Missing Baffles on both sides Missing Baffles on both sides
15
June 17, 2011 5PM +2.6 Ft Text Spillway 12.3 feet
16
June 17, 2011 5PM +2.6 Ft Text Alewife Trapping Facility
17
June 17, 2011 5PM +2.6 Ft Text
18
June 17, 2011 5PM +2.6 Ft Text
19
Time Lapse Photography Camera Looking Down 1 Picture per Minute 4AM to 8PM
20
June 17, 2011 5PM +2.6 Ft Text Camera Looking Up
21
See Quicktime Movie File For Time-Lapse Video
22
Successful Alewife Passage 2010- Escapement below Toddy Pond Outlet Dam and Fishway May 21, 2010
23
Alamoosook Dam and Fishway May 21, 2010
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.