Presentation is loading. Please wait.

Presentation is loading. Please wait.

Q UALITY P ARTNERSHIP C OUNCIL M EETING Tuesday, May 15, 2012 Marriott Riverwalk San Antonio, TX.

Similar presentations


Presentation on theme: "Q UALITY P ARTNERSHIP C OUNCIL M EETING Tuesday, May 15, 2012 Marriott Riverwalk San Antonio, TX."— Presentation transcript:

1 Q UALITY P ARTNERSHIP C OUNCIL M EETING Tuesday, May 15, 2012 Marriott Riverwalk San Antonio, TX

2 A GENDA  Welcome – Pam Blumenstein  USACE Presentation – Alicia Allen  Closing Remarks

3 Pam Blumenstein Center Director GSA Integrated Workplace Acquisition Center P AM B LUMENSTEIN, C ENTER D IRECTOR, GSA I NTEGRATED W ORKPLACE A CQUISITION C ENTER

4 GSA I NTEGRATED W ORKPLACE A CQUISITION C ENTER ACO Reviews Schedule 71 status Changes in Small Business Size Standards GSA IWACenter transition Vendor Focus groups for Schedules 36 and 78

5 US Army Corps of Engineers BUILDING STRONG ® Army Furnishings Program Alicia Allen Furnishings Program Manager US Army Engineering and Support Center, Huntsville FY12

6 BUILDING STRONG ® Centralized Furnishings Program FY12 Program Changes  Huntsville Center is following GAO ruling (270483,96-1 CPD P 146, 1996 WL 106646 (Comp.Gen.)) that does not allow the award of items that are not on a schedule holder’s contract, including different dimensions.  Vendors’ price lists and GSA contracts must reflect the actual items they have on schedule.  The centralized furnishings program is undergoing process reviews that will result in changes, both permanent changes and pilot projects. 6

7 BUILDING STRONG ® What is Working Well  Admin quotes are getting better, with more acceptable quoters in first or second round of tech review  Quality of wood barracks furniture continues to meet or exceed customer expectations  Manufacturer direct communications 7

8 BUILDING STRONG ® What is Not Working Well  Increased instances of “cutting corners” resulting in performance and delivery issues  Metal furnishings capacity, contract issues and inconsistent quality have impacted missions  Admin project performance is still somewhat “dealer” specific 8

9 BUILDING STRONG ® PROCESS CHALLENGES 9

10 BUILDING STRONG ® Tech Review  Pass / Fail analysis ► Make acceptable tech data sheets available to dealers ► No guarantee of clarifications  Technically acceptable quotes are forwarded to Contracting Officer (KO) for a best value analysis  Primary factors typically delivery or cost ► Delivery Furniture Install Start Date Furniture Install Completion Date 10

11 BUILDING STRONG ® Post-Award Walk Thru  Purpose ► Verify final colors / finishes ► Check for construction interferences ► Look at unloading / movement routes ► Confirm specific delivery instructions ► NOT INTENDED TO CHANGE PRODUCT 11

12 BUILDING STRONG ® Contract Modifications  Process mirrors a solicitation ► HQ approval for user changes ► Mod tech prep ► Customer approval ► Solicitation ► Tech Review ► Obtain funding from customer ► Award 12

13 BUILDING STRONG ® Payment  Receiving reports ► Garrisons may hold the receiving report until missing / damaged items are replaced ► HNC has a discrepancy form for partial receiving reports ► Manufacturers need to prompt dealers about completion status  Invoices ► Must match the line item (quote) sheet of the contract ► Pricing must match contract pricing ► Do not send Invoices directly to Millington 13

14 BUILDING STRONG ® 14 FY10-FY12 Furniture Program

15 BUILDING STRONG ® 15

16 BUILDING STRONG ® 16

17 BUILDING STRONG ® 17

18 BUILDING STRONG ® 18

19 GSA E XPO M EETINGS AND T RAINING Industry – Government Partnership Forum Marriott Riverwalk Alamo Ballrooms A and B 1-3:30pm ITSS Training – Schedule 71 Vendors only Thursday May 17 th from 8-9:15am Room 207A Please see Ryan Schrank for additional information

20

21

22 S OCIAL M EDIA Visit us on Twitter and register to receive our tweets. www.twitter.com/GSAIWAC Join our group on LinkedIn: GSA IWACenter Receive updates on new initiatives and upcoming events! www.linkedin.com

23 I NDUSTRY D AYS Specific Schedule Industry Days held throughout the calendar year 2010 Industry Days: Schedule 71 II K Schedule 58 I Schedule 72 – Carpeting Forum only 2011 and 2012 Industry Days Schedule 78 Schedule 71 Schedule 36

24 N EXT QPC… NeoCon East Baltimore, MD Tuesday, October 16th 12PM – 4PM Baltimore Convention Center

25 T HANK Y OU

26 Q UALITY P ARTNERSHIP C OUNCIL M EETING Tuesday, May 15, 2012 Marriott Riverwalk San Antonio, TX


Download ppt "Q UALITY P ARTNERSHIP C OUNCIL M EETING Tuesday, May 15, 2012 Marriott Riverwalk San Antonio, TX."

Similar presentations


Ads by Google