1
Chapter 3. Obtaining Silica-Fume Concrete Specifying Silica Fume and SFC Proportioning SFC Producing SFC
2
Specifying Silica Fume and Silica-Fume Concrete Chapter Outline
3
ASTM C 1240 AASHTO M 307 CSA A 23.5 Specifying Silica Fume
4
Key Provisions: ASTM C 1240 SiO 2 content, 85% min Loss on ignition, 6% max Retained, 45-µm sieve, 10% max Specific Surface, BET, 15 m 2 /g min
5
Specifying Silica-Fume Concrete Follow the practices of your organization
6
Minimum Specification Elements Required concrete performance Test placement requirements Type of finish desired Protection requirements Curing requirements
7
Proportioning Silica- Fume Concrete Chapter Outline
8
General Rules for Proportioning Silica-Fume Concrete There is no empirical method Local materials, local proportions Follow the step-by-step procedure Test, test, test
9
Proportioning Step 1: Determine project requirements Compressive strength Chloride exposure Freezing and thawing exposure Chemical exposure Abrasion resistance Other requirements
10
Proportioning Step 2: Coordinate with contractor Special constructability requirements? Maximum size aggregate Placement method Maximum slump -- Concrete will be cohesive and won’t segregate -- increase slump by about 2 in. (50 mm)
11
Proportioning Step 3: Select starting mixture Use SFA table to find a mixture with approximately your project requirements
12
Proportioning Step 4: Determine volume of entrained air Air is absolutely required if silica-fume concrete will be exposed to freezing and thawing while saturated Use an industry standard document (ACI 211.1, ACI 318, or ASTM C 94) for recommended air content Air may be reduced 1% if compressive strength is over 5,000 psi (35 MPa)
13
Proportioning Step 5: Add your local aggregates Calculate total aggregate volume to achieve desired yield Use ratio of fine to coarse aggregate that works works your materials
14
Proportioning Step 6: Prepare laboratory trial mixtures, 1 of 2 Ensure that densified silica fume is adequately dispersed Don’t worry about water slump -- there may not be any! Batch at maximum allowed water content -- use WRA and HRWRA to develop workability
15
Does concrete meet fresh and hardened requirements? Adjust mixture proportions as necessary Proportioning Step 6: Prepare laboratory trial mixtures, 2 of 2
16
Proportioning Step 7: Conduct full-scale testing Use same plant and trucks, if possible Batch enough concrete, at least 2 yd 3 (1.5 m 3 ) -- bad time to save $$$ Does concrete meet all requirements? Adjust mixture as necessary Work with the contractor
17
Proportioning Example 1 Parking Structure
18
Low chloride permeability Compressive strength of 5,000 psi (35 MPa) at 28 days Reduced heat and shrinkage Reduced rate of strength gain Protection against freezing and thawing Proportioning Example 1, Step 1: Project Requirements
19
Use 1 in. (25 mm) maximum aggregate 4 to 6 in. (100 to 150 mm) slump Pump placement Proportioning Example 1, Step 2: Contractor Requirements
20
Cement: 500 lb yd 3 (300 kg/m 3 ) Fly ash: 135 lb/yd 3 (80 kg/m 3 ) Silica fume: 40 lb/yd 3 (25 kg/m 3 ) Maximum w/cm: 0.40 Entrained air: required Proportioning Example 1, Step 3: Starting Mixture from SFA Table
21
ACI 211.1 recommends 6.0% total air for severe exposure Compressive strength > 5,000 psi (35 MPa) allows for reduction to 5.0% Proportioning Example 1, Step 4: Entrained Air Requirements
22
Proportioning Example 1, Step 5: Add Local Aggregates, (1 of 2) Total Paste Volume: 9.38 ft 3
23
Proportioning Example 1, Step 5: Add Local Aggregates, (2 of 2) Coarse aggregate density: 2.68 Fine aggregate density: 2.64 Fine aggregate: 40% of total aggregate volume Aggregate vol = 27.00 - 9.38 = 17.62 ft 3 Fine aggregate: 7.05 ft 3, 1,160 lb/yd 3 Coarse aggregate: 10.57 ft 3, 1,770 lb/yd 3
24
Proportioning Example 1, Step 5: Add Local Aggregates, (1 of 2) Total Paste Volume: 0.350 m 3 SI
25
Proportioning Example 1, Step 5: Add Local Aggregates, (2 of 2) Coarse aggregate density: 2.68 Fine aggregate density: 2.64 Fine aggregate: 40% of total aggregate volume Aggregate vol = 1.000 - 0.350 = 0.650 m 3 Fine aggregate: 0.260 m 3, 686 kg/m 3 Coarse aggregate: 0.390 m 3, 1045 kg/m 3 SI
26
You are now ready to go into a laboratory and begin making trial mixtures. Control silica fume dispersion Mix thoroughly Conduct necessary testing on fresh and hardened concrete Proportioning Example 1, Step 6: Prepare Lab Mixtures
27
Adjust from lab mixes as necessary Use large enough batches Work with contractor to conduct placing and finishing trials as required Proportioning Example 1, Step 7: Prepare Lab Mixtures
28
Proportioning Example 2 High-Strength Columns
29
Design compressive strength of 14,000 psi (98 MPa) at 28 days Proportion for 15,400 psi (108 MPa) in laboratory mixes No exposure to freezing and thawing Proportioning Example 2, Step 1: Project Requirements
30
Use 1/2 in. (13 mm) maximum aggregate 8 to 10 in. (200 to 250 mm) slump Pump placement Proportioning Example 2, Step 2: Contractor Requirements
31
Cement: 800 lb yd 3 (475 kg/m 3 ) Fly ash: 175 lb/yd 3 (104 kg/m 3 ) Silica fume: 125 lb/yd 3 (74 kg/m 3 ) Maximum w/cm: 0.231 Entrained air: none Proportioning Example 2, Step 3: Starting Mixture from SFA Table
32
Entrained air not required Proportioning Example 2, Step 4: Entrained Air Requirements
33
Proportioning Example 2, Step 5: Add Local Aggregates, (1 of 2) Total Paste Volume: 10.58 ft 3
34
Proportioning Example 2, Step 5: Add Local Aggregates, (2 of 2) Coarse aggregate density: 2.68 Fine aggregate density: 2.60 Fine aggregate: 38% of total aggregate volume Aggregate vol = 27.00 - 10.58 = 16.42 ft 3 Fine aggregate: 6.24 ft 3, 1,000 lb/yd 3 Coarse aggregate: 10.18 ft 3, 1,700 lb/yd 3
35
Proportioning Example 2, Step 5: Add Local Aggregates, (1 of 2) Total Paste Volume: 0.393 m 3 SI
36
Proportioning Example 2, Step 5: Add Local Aggregates, (2 of 2) Coarse aggregate density: 2.68 Fine aggregate density: 2.64 Fine aggregate: 38% of total aggregate volume Aggregate vol = 1.000 - 0.393 = 0.607 m 3 Fine aggregate: 0.231 m 3, 600 kg/m 3 Coarse aggregate: 0.376 m 3, 1010 kg/m 3 SI
37
You are now ready to go into a laboratory and begin making trial mixtures. Control silica fume dispersion Mix thoroughly Conduct necessary testing on fresh and hardened concrete Proportioning Example 2, Step 6: Prepare Lab Mixtures
38
Adjust from lab mixes as necessary Use large enough batches Work with contractor to conduct placing trials as required Proportioning Example 2, Step 7: Prepare Lab Mixtures
39
Statistical Approach to Determining Proportions If you have a very complex project with a number of requirements, simply making trial batches may not be the most efficient approach. Help is available to optimize concrete performance and cost.
40
Producing Silica-Fume Concrete Chapter Outline
41
Producing Silica-Fume Concrete Measuring and batching
45
Tank for storage of slurried silica fume
48
Emptying bagged silica fume into truck mixer
49
Adding repulpable bags directly to truck mixer
50
Producing Silica-Fume Concrete Measuring and batching Adding HRWRA
54
Producing Silica-Fume Concrete Measuring and batching Adding HRWRA Mixing
55
Truck Mixer Rating Plate -- Don’t exceed rated mixing capacity when producing silica- fume concrete.
57
Producing Silica-Fume Concrete Measuring and batching Adding HRWRA Mixing Controlling temperature
59
Liquid nitrogen being used to cool silica-fume concrete
60
Producing Silica-Fume Concrete Follow established and documented procedures
61
End of Chapter 3 Main Outline