Download presentation
Presentation is loading. Please wait.
Published byVincent Farmer Modified over 9 years ago
2
Participant Challenge Pilot Program Participant Stage One Assess, Learn and Develop
3
Administrator Verification Techniques Review of draft/final files Monthly or quarterly conference call Site visits Email Correspondence
4
Part One Management Leadership & Employee Involvement
5
Management Leadership Commitment Vision Statement Policy Statement Strong leadership role Set goals & objectives Establish clear lines of communication Clarify responsibility, authority & accountability
6
Employee Involvement Perception Survey Employees must be educated concerning: Their rights under the OSH Act Their participation in the Challenge program Fundamentals of VPP
7
Subcontractor Worker Coverage Develop plan for managing & overseeing subcontractors Establish criteria & subcontractor selection process Require subcontractor to adhere to company's safety & health procedures Require subcontractor to have systems in place to identify, correct & track uncontrolled hazards
8
Part Two Worksite Analysis
9
Conduct Baseline Safety & Industrial Hygiene Hazard Analysis Establishes initial (baseline) levels of company & subcontractor employee exposure Review previous accidents, injuries & illnesses Review complaints of workplace hazards Previous studies
10
…Analysis Continued Hazard Analysis of Routine Jobs, Tasks, & Procedures Hazard Analysis of Significant Change Pre-Use Analysis Industrial Hygiene Program (Stage 2 Action) Routine Self Inspections Accident Investigations Hazards Reporting System Trend Analysis
11
Part Three Hazard Prevention & Control
12
Certified Professional Resources Ensure that outside sources are available if needed to conduct baseline hazard analysis
13
Hazard Elimination & Control Methods Begin identifying & selecting the most appropriate hazard control & elimination methods to address the most serious known hazards identified through the baseline analysis Establish & implement system that prioritizes hazards Implement action plan Enforce selected controls; incorporate into training Require subcontractors to adopt equivalent plan
14
Hazard Control Program Establish Hazard Control program that meets minimum requirements of OSHA Hazard controls follow hierarchy of controls: Engineering Administrative Work Practice PPE
15
Occupational Health Care Program Company conducts review of OSHA 300 logs, insurance claims, accident investigations & insures all records are complete Company employees must have access to health care services based on results of baseline survey
16
Preventive Maintenance of Equipment Company has inventory of equipment that requires preventive maintenance Require subcontractor to have equivalent system
17
Tracking of Hazard Correction Develop & establish hazard tracking system Subcontractors should implement equivalent system
18
Emergency Preparedness & Response Provide/Plan for emergency care Establish written emergency procedures Train Employees Require compliance by subcontractors
19
Part Four Safety & Health Training
20
Training for Managers, Supervisors & Non-supervisory Employees Develop relevant training using worksite analysis activities Provide qualified trainers/instructors Require attendance Ensure OSHA required training is performed
21
Stage Two Working Out the Bugs Continue Development, Fully Implement, Tweak
22
Stage Three The Last Stage Monitor, Refine/Tweak, Reassess and Improve Forever!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.