Production of Gasoline Components from Synthesis Gas ChE 397 Senior Design Group Alpha Ayesha Rizvi Bernard Hsu Jeff Tyska Mohammad Shehadeh Yacoub Awwad 2011.04.05
2
Presentation Overview Recap PFD Initial Control Scheme Refined Economics Plant Layout Calculations
3
Recap H2H2
4
Block Flow Diagram Methanol Reactor CO H2H2 MeOH H 2, CO Cooling and Separation MeOH H 2, CO Methanol to Gasoline (MTG) Reactors Water Separation Hydrocarbons Water Hydrocarbons Deethanizer (Dist. Col.) C1/C2 Distillation Columns Heavy Hydrocarbons Liquefied Petroleum Gas Gasoline Purge
5
Questions from Last Presentation Why are we using the fluidized bed MTG reactor? – Catalyst Regeneration – Economics – Data Why is our methanol reactor at this pressure? – Normal operation How do we startup our facility – Syngas – Methane We are using an inefficient distillation scheme – Varied stages/RR ratio to no avail
6
Design Basis 6000 Short tons syngas/day 518 °F (270 °C) 725 psi (5 Mpa) Product Gasoline – 15,974 barrels/day LPG – 4,263 barrels/day
15
Economics Overview Plant Revenue: $575 Million/year Profit: $87.2 Million per year Simple Payback: 4.16 years Plant Upfront cost: $363 Million IRR of 25% Cost of utilities, maintenance, and catalyst: $22.7 Million/yr (reduced by 1/2)
16
Analysis of NPV% vs. a Range of Gasoline Prices.
17
Analysis of NPV% vs. a range of LPG%
18
Analysis of NPV% vs. a Range of Syngas %
19
Analysis of NPV% vs. Plant Cost %
20
Detailed MTG Reactor Pricing Sizing from NREL standards Original price from NREL 6/10 factor for reactors CEPCI to update prices Total reactor cost = 13.8 Million
21
Plant Layout Considerations: 1. Location:- 1. It must be far from public areas (schools, living communities, etc) 2. Must have access to any transportation (Railroads, roads, sea, etc) 2. Safety & design 1. Employees safety plays an important role in plant design. 2. Also taking into account, for any future expansion & Space for maintenance. 3. Cost: 1. Includes: capital and operating.
22
Site Plant
23
Process Building
24
Methanol Reactor Detailed Sizing Calculation Heat transfer and kinetics U = 150 BTU/hr Q = UA Δ T GHSV 8000 1/hr Volume inside tubes D = 8.3 ft, H = 33.2 ft
25
MTG Reactor Sizing 10 Ft/Sec
26