Download presentation
Presentation is loading. Please wait.
Published byOlivia Dean Modified over 9 years ago
1
Operation Build Progress What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and Educational wing of Second Baptist Church is underway. Outside demolition began immediately after we vacated the church. The steps and ramp were removed to make room for the Atrium and new fellowship hall. What once was a dream, is now becoming reality. With the Grace of God, work on the Renovations and Educational wing of Second Baptist Church is underway. Outside demolition began immediately after we vacated the church. The steps and ramp were removed to make room for the Atrium and new fellowship hall. With the onset of snow in late January and February, work moved inside to the old fellowship hall, kitchen and pastor’s office. Everything was demolished so we can build new administrative offices and add an elevator. Once the weather improved, work resumed outside, digging and pouring concert for the foundation. Once the foundation is completed, brick work on the walls will begin. With the onset of snow in late January and February, work moved inside to the old fellowship hall, kitchen and pastor’s office. Everything was demolished so we can build new administrative offices and add an elevator. Once the weather improved, work resumed outside, digging and pouring concert for the foundation. Once the foundation is completed, brick work on the walls will begin. Praise God for his continued blessings. Praise God for his continued blessings.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.