1
CONSTRUCTION OF 3 POLICE STATIONS IN 3 MUNICIPALITIES REPUBLIC OF MACEDONIA Dutch, Hungarian, Norwegian and Swiss Cooperation
2
MINISTRY OF INTERIOR - MOI MUNICIPALITIESLIPKOVO, ARACHINOVO, TEARCE PROGRAMME PERIOD 24 MONTHS ( JAN 2004 - DEC 2005 ) TOTAL BUDGET EURO 1,000,000 PROJECT TITLECONSTRUCTION OF THREE POLICE STATIONS IN FORMER 2001 CRISIS REGIONS REPUBLIC OF MACEDONIA BENEFICIARYGOVERNMENT OF THE REPUBLIC OF MACEDONIA DONOR MINISTRY OF FOREIGN AFFAIRS OF NORWEY DUTCH DEVELOPMENT CO-OPERATION SWISSE DEVELOPMENT COOPERATION MINISTRY OF FOREIGN AFFAIRS OF HUNGARY Dutch, Hungarian, Norwegian and Swiss Cooperation
3
REPUBLIC OF MACEDONIA LOCATION OF THE POLICE STATIONS
4
CONSTRUCTION OF 3 POLICE STATIONS IN 3 MUNICIPALITIES PREPARE PROJECT DOCUMENTATION FOR NEW LAYOUTS OF POLICE STATIONS AIMING AT NEW APPROACH OF SOCIAL AND COMMUNITY POLICING SUPERVISION AND MONITORING OF WORKS REPORTING ON STATUS AND PROGRESS OF WORKS TOTAL OF 600.000 € 14 MONTHS Former Crisis Areas Republic of Macedonia LIAISE BETWEEN THE MINISTRY OF INTERIOR, MINISTRY OF TRANSPORT AND COMMUNICATIONS, MUNICIPAL AUTHORITIES, THE 4 DONORS, TECHNICAL CONSULTANTS AND IMPLEMENTERS TENDERING AND PROJECT IMPLEMENTATION ARACHINOVO MATEJCHE SKOPJE LIPKOVO ARACHINOVO 400.000 € 10 MONTHS TEARCE TETOVO BENEFICIARIES: SPECIFICALLY RESIDENTS OF THE MUNICIPALITIES OF ARACHINOVO, LIPKOVO AND TEARCE
5
CONSTRUCTION OF BUILDINGS IN ACCORDANCE WITH THE STANDARDS FOR PUBLIC INFRASTRUCTURE BUILDINGS AND CREATING AN APPROPRIATE WORKING ENVIRONMENT FOR THE POLICE OBJECTIVES OF THE PROGRAMME SUBSTANTIALLY CONTRIBUTING TO THE REINTEGRATION OF THE VARIOUS ETHNIC ENTITIES OF THE REPUBLIC OF MACEDONIA, THROUGH INCREASING THE CONFIDENCE AND SECURITY IN THE FORMER CRISIS AREAS WIDER OBJECTIVE OVERALL OBJECTIVES THE IMPLEMENTATION OF THIS PROJECT HAS A DIRECT LINK WITH THE EFFORTS CARRIED OUT BY THE LOCAL GOVERNMENT OF THE REPUBLIC OF MACEDONIA AND BY THE INTERNATIONAL COMMUNITY IN STRENGTHENING THE POLICING AND PROVIDING A LONG-TERM SUSTAINABILITY FOR A NEW COMMUNITY BASED POLICING IN THE COUNTRY IN THE NEW STATIONS THE STAFF WILL OPERATE IN ACCORDANCE WITH A COMMUNITY FRIENDLY APPROACH AND THEREBY BECOMING AN INSTRUMENT TO FACILITATE CONFIDENCE BUILDING AND STRENGTHEN STABILITY IN THE FORMER CRISIS AREAS
6
PREPARE PROJECT DOCUMENTATION FOR NEW LAYOUTS OF POLICE STATIONS AIMING AT NEW APPROACH OF SOCIAL AND COMMUNITY POLICING COORDINATIVE MEETING START-UP WITH DESIGN ENGINEER AND MOI FOR THE POLICE STATION DESIGNS - 15.02.2004
7
TENDERING AND PROJECT IMPLEMENTATION POLICE STATION MATEJCHE - GEODETIC SURVEY - 17. 03. 2004
8
LIAISE BETWEEN THE MOI, MOTC, MUNICIPAL AUTHORITIES, THE 4 DONORS, TECHNICAL CONSULTANTS AND IMPLEMENTERS VISIT TO THE POLICE STATION DURING CONSTRUCTION WITH MOI AND DONOR REPRESENTATIVES - 01.06.2005 FIRST OFFICIAL MEETING PS TEARCE - 22.10.2004 MOU SIGNING IN THE MINISTRY OF INTERIOR OF RM
9
INAUGURATION OF WORKS OF THE POLICE STATION IN MATEJCHE AND ARACHINOVO WITH DONOR’S REPRESENTATIVES AND MOI MARCH 2004
10
SUPERVISION AND MONITORING OF WORKS - MATEJCHE
11
SUPERVISION AND MONITORING OF WORKS - ARACHINOVO
12
SUPERVISION AND MONITORING OF WORKS - TEARCE
13
APPROACH AND ACTIVITIES THE THREE POLICE STATIONS HAVE BEEN CONSTRUCTED FOLLOWING THE TECHNICAL DESIGN MADE BY THE LOCAL CONSULTANT AND APPROVED BY THE MINISTRY OF INTERIOR THE QUALITY OF THE MATERIAL AND WORKS ARE DEFINED AND EXECUTED IN ACCORDANCE TO THE LOCAL QUALITY STANDARDS (JUS) LOCAL PROFESSIONAL CONTRACTORS HAVE CARRIED OUT THE WORKS UNDER IMG SUPERVISION, VIA ROUTINE MONITORING OF ENGINEER AND ARCHITECT UNDER IMG RESPONSIBILITY, AND IN LIAISON WITH MOI REPRESENTATIVE INTERNATIONAL EXPERTS HAVE MONITORED THE OVERALL PROGRAMME, WHEREAS SUPERVISION OF THE IMPLEMENTATION WORKS WAS MADE DAILY BY NATIONAL ENGINEERS AND / OR ARCHITECTS ALL NECESSARY INVESTIGATIONS AND TESTS WERE ACCOMPLISHED PRIOR TO THE BEGINNING OF THE PHYSICAL WORKS SUCH AS GEOTECHNICAL TESTS, GEOMETRICAL SURVEY ETC CERTIFICATES OF QUALITY FOR DIFFERENT MATERIALS WERE COLLECTED AND QUALITY CONTROL OF THE CONCRETE WAS MADE BY A SPECIALISED LABORATORY IN THE REPUBLIC OF MACEDONIA CRITICAL PHASES ARISING AND IMPROVEMENTS / CHANGES DURING IMPLEMENTATION PROCESS WERE RESOLVED BY IMG IN COOPERATION WITH MOI AND KEEPING ALL THREE DONORS INFORMED OF THE NECESSARY CHANGES, WHICH WERE REQUIRED DURING THE IMPLEMENTATION PROCESS TO THE ORIGINAL PROJECT PROPOSAL
14
EQUIPMENT FOR POLICE STATIONS
15
OFFICIAL OPENING CEREMONY IN TEARCE MUNICIPALITY - 19.10.2005