Presentation is loading. Please wait.

Presentation is loading. Please wait.

Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009.

Similar presentations


Presentation on theme: "Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009."— Presentation transcript:

1 Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009

2 Episode 3 - CAATS II Final Dissemination Event 2 Content What is Prototyping Approach Advantages Limitations Prototyping objectives Different Strategies – En-route et TMA En-route experience Expert Groups En-route Results Issues/Next Steps… In Conclusion

3 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 3 What is it useful for? Human in-the-loop experiments to build the ATM environment piece by piece and to address detailed issues (e.g. airspace, tools, roles). The focus is on operability.

4 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 4 What is the Technique? Real-time technique Small-scale and/or part-task Iterative in nature Gradually building and refining Examine the options, moving towards a clear goal

5 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 5 Approach Iterative process Allows modification of a specific research question to be introduced between sessions The overall approach needs to be structured Reasonable and achievable objectives

6 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 6 Advantages Flexibility Short duration Suited to early concept assessment/maturation Reduced cost: small scale and simplified environment, to focus on specific issues

7 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 7 Limitations Short-time scales are the major limitation  One week sessions  Time between sessions Training time Limits  Examinination of the concept with multiple conditions  Trends rather than performance measures  Time to perform platform changes and tests between sessions

8 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 8 Prototyping objectives Main objectives: initial assessment of operability and acceptability, refinement/maturation of a defined set of concept elements Secondary objectives: initial trends on some KPAs (Fast Time/Modelling required to provide consolidated performance figures)

9 Different Strategies En-route and TMA

10 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 10 Main CTA points EHAM - NORKU at FL260 EGLL - GORLO any FL EGSS -TOPHU at FL270 EDDF – BEGOK at FL250 GORLO TOPHU NORKU PAM TENLI BEGOK EDDK/LW EDDL/LV EGLL EGSS/GW EHAM EDDF Arrival flows EHAM EDDL/LV Departures En-route

11 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 11 TMA

12 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 12 En-route experience

13 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 13 EXPERT GROUPEXPERT GROUP Session 1 Environment  Reference Business Trajectory (RBT) Session 2 RBT/Controlled Time of Arrival (CTA) Session 3  RBT/CTA  Tools Expert Group iteratively drives content of sessions. Expert Groups

14 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 14 En-route Results Airspace  Fixed route network for arrival/departure flows (segregated from overflights)  Redesign sectorisation to suit traffic flows and segregated routes  Know vertical profile as part of RBT Tools  Sector exit lists  Medium Term Conflict Detection (MTCD)  Trajectory Editor (TED) Training  Method and duration (continuity of ATCos would help) Controllers happy that their recommendations appeared in subsequent sessions and during sessions

15 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 15 Issues/Next Steps… Additional Nominal Situations  Weather  Mixed Equipage  Dynamic Military Activity Prefered Trajectories  Company preferences  ANSP preferences Operational Environment  Information from cockpit to ATCO  Support tools

16 Brussels, 13 & 14 Oct 2009 Episode 3 - CAATS II Final Dissemination Event 16 In Conclusion Operability – user perspective go/nogo Iterative Cost-effective Continuity Short-Time as benefit and constraint Clear target Part of wider validation framework


Download ppt "Episode 3 Prototyping Sessions En-route and TMA Episode 3 - CAATS II Final Dissemination Event Bill Booth EUROCONTROL Episode 3 Brussels, 13 & 14 Oct 2009."

Similar presentations


Ads by Google