ASECNA AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR
2
AGENCY FOR AIR NAVIGATION SAFETY IN AFRICA & MADAGASCAR (ASECNA)
France GABON MADAGASCAR MALI MAURITANIA NIGER SENEGAL TOGO BENIN BURKINA-FASO CAMEROON CENTRAL AFR REP CHAD CONGO BRAZZA COTE D ’IVOIRE EQUAT. GUINEA
3
ORGANIZATION
4
16 millions sq.km ASECNA 6 FIRs /5 FIC NIAMEY NDJAMENA DAKAR
BRAZZAVILLE FIR DAKAR OCEANIC Agence pour la Sécurité de la Navigation Aérienne en Afrique et à Madagascar Siège Social : Av. Jean Jaurès DAKAR B.P Tél. : Fax : Bénin-Burkina-Cameroun-Centrafrique-Congo-Côted’Ivoire-France-Gabon-Guinée Equatoriale-Madagascar-Mali-Mauritanie-Niger-Sénégal-Tchad-Togo FIR ANTANANARIVO
5
SERVICES ATS COMMUNICATIONS (FIXE/MOBILE) FLIGHT INSPECTION
FIRE FIGHTING ENGINEERING
6
RESSOURCES AERONAUTICAL FEES (LANDING & EN ROUTE)
MEMBER STATES CONTRIBUTIONS ON THEIR NAT ’L ACTIVITIES ENTRUST TO ASECNA LOANS
7
COMMUNICATIONS VHF NETWORK EXTENSION FOR MORE CONTROLLED AIRSPACE
SATCOM FOR AIR TRAFFIC CONTROL AERONAUTICAL TELECOM NETWORK (ATN) HF / DL - SATELLITE BACK UP
8
NAVIGATION GROUND BASED EQUIPMENTS IN CONTRIBUTION TO LOCAL OR WIDE AREA AUGMENTATION SYSTEMS
9
SURVEILLANCE SSR /NDJAMENA/BRAZZAVILLE
AUTOMATIQUE DEPENDANTE SURVEILLANCE (SITA / AIR AFRIQUE / COLLINS/ANAM) AIR SITUATION DISPLAY FOR NON ADS FLIGHT ADS/SSR ADS-B SURFACE MVT GUIDANCE
10
ATM 1/2 AUTOMATIC FLIGHT DATA PROCESSING CONFLICT DETECTION AND CLEAR
FLEXIBLE AIR ROUTES (CONTINENTAL/OCEANIC ATL-INDIAN) DARPs CPDLC D-FIS
11
ATM 2/2 REDUCED UPPER AIRSPACE AREA TRAFFIC FLOW MANAGEMENT
HARMONIZATION OF TERMINAL AREA (TMAs) LIMITS SUB REGIONAL ATM SYSTEMS INTEGRATION
12
AVIONICS AFI / LOW DENSITY TRAFFIC
FULL AUTONOMOUS AVIONICS ON BOARD OVERSEAS INT’L AIRLINES LACK OF EQUIPMENT ON MAJOR DOMESTIC OR REGIONAL OPERATORS B-RNAV FAIR COST CNS/ATM SYSTEMS (DL/ADS/GNSS) VDL MODE MODULAR BASIS
13
ASECNA’S CNS/ATM IMPLEMENTATION COST
ACQUISITION/INSTALLATION/OPERATION (2000/2010) COMMUNICATION millions US$ NAVIGATION “ SURVEILLANCE “ ATM “ TRAINING “ INFRASTRUCTURE “ TOTAL “
14
COST/BENEFITS ANALYSIS
15
FINANCING ASECNA’S CASE STUDY
DEVELOPMENTS/DEMONSTRATIONS & TRIALS STOCK FUNDS OPERATIONS INFRASTRUCTURE TRADITIONAL EUROPEAN & AFRICAN FINANCIAL INSTITUTIONS
16
EXISTING INFRASTRUCTURE
AFTN MODERNIZATION INTERCONNECTION OF COMMUNICATIONS NETWORK VHF COVERAGE /DATA LINK X 25 PROTOCOL SADIS IMPLEMENTATION
17
EXISTING INFRASTRUCTURE
LADGPS TRIALS IN DAKAR GPS /PRIMARY/SUP. MEAN WGS 84 GNSS IMPLEMENTATION IN AFI STUDY FOR EGNOS TEST BED EGNOS/WAAS INTER OPERABILITY TESTS
18
EXISTING INFRASTRUCTURE
ADS IN AFI WITH RKA / COLLINS /SITA ENHANCEMENT TO FANS- /1/A
19
EXISTING INFRASTRUCTURE
ATM INTEGRATION AND HARMONIZATION / 40 YEARS
20
TRAINING 15 SEMINARS OF SENSIBILIZATION TRAINAIR PROGRAMM