Bryan Warren 4/28/15 SoCalGas To-Code Pilot Status Update: Development of Concept 1
2
Background »In D.14-10-046 the CPUC directs the IOUs to develop a pilot that: Accelerates below code equipment replacement over existing program framework Assesses viability of future program offerings Is authorized with $1M budget per utility Is made up of a control group and treatment group Extends one calendar year Includes program implementation and evaluation 2
3
SoCalGas Pilot Objectives »Address a hard-to-reach market segment »Accelerate replacement of typically below-code gas-fired equipment and evaluate measured results »Test customer willingness to perform above code levels of EE and appropriate incentive level to influence action at time of repair/replacement »Develop scalable program design to provide gateway for future EE activity 3 Draft proposal subject to change
4
Preliminary Pilot Program Design EE boilers in small to medium commercial buildings 1 Geographically in Los Angeles Area 2 Deemed midstream approach 3 Documenting site specific conditions and baseline energy use information 4 Claim above and through-code savings 5 Timeline: Q2 2015 – Q2 2016 * 6 4 Draft proposal subject to change * Subject to receiving CPUC approval to conduct pilot in contemplated time frame.
5
Technology »Deemed Energy Efficient Boilers Commercial Hot Water Boilers Space Heating Boilers (Steam and Hot Water) 5 Boiler TypeCode EE Rebate Level Small Water0.82 AFUE ≥ 0.84 EF Med Water0.80 TE Large Water0.82 CE≥ 0.86 CE Small Steam0.80 AFUE≥ 0.82 AFUE Med/Large Steam 0.77-0.79 TE ≥ 0.81 TE AFUE = Annual fuel utilization efficiency EF = Energy factor CE = Combustion efficiency TE = Thermal efficiency Draft proposal subject to change
6
Market To Address »Small Commercial Typical industries Owner or tenant »~11k total boilers in market »SoCalGas incented 296 boilers in 2013- 2014 $690k incentive dollars 6 Draft proposal subject to change
7
Delivery Approach »Midstream deemed »Leveraging trade professionals that have equipment distribution within SoCalGas service territory »Have service contracts for existing and EE equipment 7 Draft proposal subject to change
8
Measurement & Savings »Random Control Trial (RCT) pilot Control Group receives “above-code” incentives Treatment Group receives “through-code” incentives Commission staff will recommend the minimum sample sizes using Power Analysis based on customers’ information * »SoCalGas performs on-site inspection/engineering audits to assess existing conditions »Conducts surveys to understand customer motivations »Study analyzes pre- and post-monthly bill consumption to quantify savings 8 Draft proposal subject to change * Subject to $1M budget restriction