Download presentation
Presentation is loading. Please wait.
Published byGilbert Booker Modified over 9 years ago
1
Trevor Andrews Holli Monroe Emily Piccione William Wright
2
Project Description Customer Needs and Project Specifications Project Development (Plan??) Final Design Concept Summary of Test Results Conclusions Questions
3
In order to improve quality on the four-station assembly line within the Toyota Production Systems Lab at the Rochester Institute of Technology, two andon systems and a corresponding monitoring system are to be developed. One andon system is to be a typical system consisting of simple electronics. The other andon system is to be purely mechanical in nature. In order to highlight and record abnormalities, which can later be used to perform root cause analysis and develop preventative countermeasures, a monitoring system will be designed alongside the andon systems.
12
For more on System User Manual consult EDGE webpage.EDGE webpage
14
For more on System User Manual consult EDGE webpage.EDGE webpage Ladder Logic Functions of a PLC How to wire, use longer wires originally
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.