Download presentation
Presentation is loading. Please wait.
Published byHarriet Lyons Modified over 9 years ago
1
Carbon Saving Initiatives Update 2009 / 2010 FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS
2
ConCom (Continuous Commissioning) –Flowers building, ‘Night Set-Back’ – delivered 239 tCO 2 savings / year. –Faculty building, ‘Weekend Set-Back’ – delivered 60 tCO 2 savings / year –SAF building, AHU ‘Set-Backs’ - initial air readings underway. –SAF, transformer voltage reduction – savings being assessed –Commonwealth building, AHU ‘Set-Backs’ – desk-top report of operational times & fan ratings completed, ConCom to review with FM team & academic community, identify and initiate opportunities. –Obtained Carbon Trust matched funding to support ConCom - £38,765
3
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS Lighting –Faculty building, LED lights installed on ramp and in secure bike store – delivered 26.3 tCO 2 savings / year. –Sherfield building, LED lights installed in level 2 main concourse – delivered 6.3 tCO 2 savings / year. –Sherfield building, LED lights extension to ground floor concourse – programmed for 26 th / 27 th June expected to deliver 11.5 tCO 2 savings / year. –All lighting works, are now being challenged to demonstrate carbon savings, projects in development include: Skempton stairwells, RSM mezzanine corridors, Elec Eng workshops. –ConCom survey of existing lighting on SK Campus, to commence 1 st July, will establish strategy for installing more efficient lighting and introducing controls.
4
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS Other inititatives –Silwood transformers, ‘Power Perfector ’ installation, controlling operational voltage – delivered 32 tCO 2 savings / year. –RSM & Bessemer, office ‘Hot Water Boilers’, programmed to occupied office hours only – delivered 10 tCO 2 savings / year –Food recycling composter – delivered 166 tCO 2 savings / year –Lagging & insulation works – delivered 55 tCO 2 savings / year –Silwood buildings ‘Cavity Wall Insulation’ – works due to start 2 nd July, expected to deliver, 75 tCO 2 savings / year. –Steam trap remedial works, survey identified improvements – expected to deliver, 491 tCO 2 savings / year.
5
FACILITIES MANAGEMENT ENVIRONMENTAL & ENERGY IMPROVEMENTS Opportuities under review –ETHOS ‘waste to heat’, convert, 550 tonnes of waste to heat / steam on site – expected to realise 450 tCO 2 savings / year. –Plant Replacement : installation of new chillers, efficient lifts & air conditioning units – potential savings under assessment. –Photovoltaic's (PV): Discussions with Inside2Outside regarding OPV Membrane, potential applications and Solar Century identifying potential roof locations for systems on site for PV panels – potential savings and viability to be assessed. –CHP operation - initial discussions regarding more efficient operation & exploring with Kiwi Power potential income from the ‘Grid’. –Bike & Electric car provision on SK campus – initial operational desk-top report completed, ConCom Team commencing review with FM team / academic community, identify & initiate opportunities.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.