Download presentation
Presentation is loading. Please wait.
Published byJoanna Peters Modified over 9 years ago
2
Please let me know of any changes as soon as you are aware: Personnel including names, phone or email. Prime Contacts Start or Anticipated Completion Dates. Traffic Control Field Office location, phone or fax. Detour Information
4
Information to include in email to Steph: Date Time Location Attachment C (found in Pantry)
5
BEFORE work begins the DOT must issue the notice to proceed. We can also issue a conditional notice to proceed for items. Commonly used to start staking or traffic control.
6
Please make sure justifications are being done for each item.
7
What Pete sees: Justification are missing a statement that the cost was found as reasonable. “It is unfortunate that I have to turn these CCOs back because they did not take the time to explain that the cost was found reasonable. This has been the main reason I have had to return CCOs. Federal regulations call for an independent costs analysis. In lieu of which, I am willing to accept a statement within the justification acknowledging that the cost was acceptable and was found reasonable (statement made by WisDOT or the Departments’ consultant agent).”
9
The AsBuilt CD is being stored on the inside front cover with a self adhesive CD holder. I will have a self adhesive CD holder in your PE File.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.