Download presentation
Presentation is loading. Please wait.
Published byBlaise Gregory Modified over 9 years ago
1
Christchurch Transportation Planning Post Feb 2011 Earthquake Oceania Cube User Conference 2011 Presented by Andrew Metherell
2
Contents Introduction Land Use Available Data Estimating Changes Modelling The CTM Application and Results Oceania Cube User Conference 2011
3
Where is Christchurch? Oceania Cube User Conference 2011
4
Christchurch Statistics Population: 415,000 Households: 150,000 Total Area: 1,425 km 2 Oceania Cube User Conference 2011
5
The Earthquakes Oceania Cube User Conference 2011
6
~1,200 road surface defects >50,000 road surface defects Oceania Cube User Conference 2011
7
The Effects Roads closed, CBD shut Households, business, schools and shops re-located Traffic increases on key routes Increased travel time Reduced trip reliability Oceania Cube User Conference 2011
8
The Responses “Get Christchurch Moving” – Emergency Response “Keep Christchurch Moving” Review of Forward Capital Works Programme Utilise Christchurch Transportation Model (CTM) Oceania Cube User Conference 2011
9
The Model Land use based, various forecast years Person-based travel Strategic network representation Wide geographic area Daily travel calculations Oceania Cube User Conference 2011
10
Christchurch Transportation Model Land Use Data Zonal Trip Ends Generation Results Modal Choice Trip Distribution Route Choice (Assignment) Network Data Policy Assumptions Oceania Cube User Conference 2011
11
Modelling Plan Immediate effects covered by emergency response 6 month post EQ (2011) Compare pre and post EQ travel demand changes Confirm observed change in travel patterns 5 years hence, 2016 various rates of recovery to CBD Identify recovery travel demand changes Test forward work programme effects Long term, 2026 and 2041, assume full recovery (for now) Oceania Cube User Conference 2011
12
Land Use – Available Data Post Redirections Residential “stickers” (red/yellow/green) Local knowledge Transport planners Real estate experts Oceania Cube User Conference 2011
13
Household Postal Redirections As of 12 April 2011 64% redirects remain with City FROM TO Oceania Cube User Conference 2011
14
Net Postal Redirections 3,700 redirects from (red) 2,400 redirects to (green) Excludes PO boxes Oceania Cube User Conference 2011
15
“Stickers”/Placards What do the three colours mean? RED – Do not enter a red placarded building because it is unsafe YELLOW – Buildings suitable for restricted access until issues are resolved GREEN – Building accessed and no structural hazards apparent Oceania Cube User Conference 2011
16
Residential “Sticker” Status Red or yellow stickers 5,750 households “lost” Oceania Cube User Conference 2011
17
Land Use – Estimating Changes Determine overall net loss (pop/HHs) Determine geographic distribution Reductions But increases in some areas With CBD closed, where will business (& jobs) be? Oceania Cube User Conference 2011
18
Net Loss – Population / HHs Population loss 10,000 Christchurch Estimate household reduction from population (2.6 ppl/hh) 3,800 less households Oceania Cube User Conference 2011
19
Geographic Distribution Household loss areas Residential sticker status Postal redirection Vacant residential land Where will people move to? Zoned “vacant” residential land Some in damaged areas Oceania Cube User Conference 2011
20
CBD Job Loss Main job loss in CBD Unemployment likely to rise (so fewer jobs overall) Pre-quake 55,900 Post-quake 30,900 CBD Fringe -50%* Pre=8,100 Post=4,900 CBD Outer -10% Pre=25,100 Post=24,400 Oceania Cube User Conference 2011
21
Job changes around the city Oceania Cube User Conference 2011 AIRPORT CBD PORT Existing Major Business Areas
22
Oceania Cube User Conference 2011 Roads of National Significance
23
Modelling – Scenarios Evaluated LAND USE 2011 2016 Onwards PrePostInitial RoNSFull RoNS Pre Post 2011 Post Pre 2016 Pre 2026 Pre2041 4 Stage Model Run Assignment only, fixed demands Oceania Cube User Conference 2011
24
Forecast Post-Quake Changes 2011 Daily Demand INCREASE DECREASE Oceania Cube User Conference 2011
25
Future Network Implementation – Initial RoNS 2016 Daily Demand Change with Initial Road of National Significance (CSM1 and Western Corridor) INCREASE DECREASE Oceania Cube User Conference 2011
26
Initial RoNS – Congestion Relief Land use: 2016 Post-Quake Network: 2011 Post-Quake Land use: 2016 Post-Quake Network: 2011 Initial RoNS Oceania Cube User Conference 2011
27
Outcomes CTM useful in post earthquake planning Traffic forecasts consistent with post quake counts Able to demonstrate initial RoNs required Oceania Cube User Conference 2011
28
Acknowledgements Oceania Cube User Conference 2011
29
Questions? Oceania Cube User Conference 2011
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.