Download presentation
Presentation is loading. Please wait.
Published byLee Moody Modified over 9 years ago
1
RIPARIAN TREE PLANTING City Stream Watch 2006
2
SAWMILL CREEK Phase II Rehabilitation Project
3
Sawmill Creek – Phase II May 6 th, 2006 Phase II planting on Sawmill Creek hopes to further rehabilitate a failed bank on the east side of the stream. Phase I was carried out in May of 2005, though it seemed more vegetation was still needed in the upper sections of the bank. In Phase II we planted more vegetation on the upper sections of the bank failure and also filled in the holes missed last year.
4
Sawmill Creek – Phase II Twelve volunteers planted 600 trees on this failed bank on Sawmill Creek
5
Sawmill Creek – Phase II Even though it was a rainy day which made working in clay difficult, volunteers made the best of it and had a great time.
6
Sawmill Creek – Phase II # of trees planted by volunteers: - 250 Red Osier Dogwood - 200 Nannyberry - 100 White Cedar - 50 White Spruce
7
Sawmill Creek – Phase II In total 12 volunteers gave 32 hours of service helping to plant 600 trees on the bank of Sawmill Creek to complete Phase II of the rehabilitation project.
8
Sawmill Creek – Phase II Here are some pictures of some of the volunteers who made this project happen
9
Sawmill Creek – Phase II After a successful day of planting the site looked better than ever
10
Sawmill Creek – Phase II
11
This site will be monitored over the course of the summer to determine if more planting will be necessary Thanks to all those volunteers who participated and didn’t mind getting dirty.
12
GRAHAM CREEK Rehabilitation Project
13
Graham Creek – May 8 th, 2006 High water is eroding the bank along Graham Creek at Andrew Haydon Park causing loss of vegetation and possible siltation. Siltation can affect fish spawning and nursery habitat therefore trees will be planted along the eroded bank to help re- vegetate the site and stabilize the soil.
14
Graham Creek On May 8 th two volunteers helped to plant 50 Red Osier at this site
15
Graham Creek It may not have been as big a project as Sawmill Creek but these volunteers were happy to help make any difference they could.
16
Graham Creek
17
This small project hopes to begin establishing a root system and promoting natural growth of other plants to stabilize the bank from further erosion. As this site runs through a city park, it will also help bring the aesthetic beauty of a natural stream bank back to this stretch of stream
18
MOSQUITO CREEK Rehabilitation Project
19
Mosquito Creek The planting site on Mosquito Creek is in the Riverside South community and has been under heavy development over the past few years. Where Mosquito Creek crosses under Spratt Rd. there has been some erosion due to stream alteration With this planting we hope to further rehabilitate this area by planting trees in the riparian zone to establish root systems in the loose soil to stop the erosion problem
20
Mosquito Creek
21
After a few hours of planting the site was full of new seedlings
22
Mosquito Creek Volunteers who were happy to lend a hand
23
Mosquito Creek Species planted at this site were: - 100 Nannyberry - 50 Bur Oak
24
Mosquito Creek Planting was done on May 9 th, 2006 and 150 trees were planted by 2 volunteers.
25
City Stream Watch 2006 A huge THANK YOU goes out to the 16 volunteers who made each of these projects possible. In total 800 trees were planted on 3 different stream systems. Thank you for making another Stream Watch project a success!!
26
City Stream Watch 2006 For more information on this project or if you would like to get involved with the program please contact: Grant Nichol City Stream Watch Co-ordinator (613) 580-2424 ext 22886 Grant.Nichol@ottawa.ca
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.