Ethiopian Rural Travel and Transport Program Manuals Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive Safety Net Program (PSNP)
2
ERTTP Manuals 1.Formulation & Implementation Framework 2.Planning Monitoring & Evaluation 3.Rural Transport Infrastructure Development 4.Means Of Transport & Service Development 5.Non-Transport Interventions & Income Generating Schemes 6.Resource Mobilization & Management
3
Table of Contents ABBREVIATIONS and ACRONYMSvi I.Prefacevii I.1.Backgroundvii I.2.Objectivesvii I.3.Organization of the manualviii
4
Chapter 1.ORGANIZATION AND PLANNING 1.1.Community Organization and Participation 1.2.Working with Community 1.3.Planning of Project 1.4.Operational Planning 1.4.1.Logistic Planning 1.4.2.Work Planning 1.4.3.Overall Work Plan
5
Chapter 2.RTI Design Standard, Wereda Mapping And Pricing 2.1.RTI Traffic Survey Method 2.2.Wereda RTI Mapping 2.3.Low Level Road Design 2.4.Quantity Estimation and Pricing 2.5.Environmental Impact Assessment 2.6.Safety
6
Chapter 3.Guideline on RTI Construction and Improvement More detail in a moment
7
Chapter 3.Guideline on RTI Construction and Improvement 3.1.Setting-Out (Route Alignment) 3.2.Sequences of Construction Activities 3.3.Improvement of Footpaths 3.4.Retaining Structures 3.5.Hand Tools and Simple Implements 3.6.Construction of Different Types of Cross Drainage Structures
8
Chapter 4.RTI Maintenance 4.1.Maintenance Purpose and Causes of Road Deterioration 4.2.Maintenance Need Assessment 4.3.Type of road and structure maintenance 4.3.1.Routine maintenance 4.3.2.Periodic Maintenance 4.3.3.Emergency Maintenance
9
Chapter 5.Construction and Maintenance by Contractor 5.1.Introduction 5.2Contract Administration 5.3Procurement of Works 5.4Community Contracting
10
Chapter 3.Guideline on RTI Construction and Improvement Execution of road construction and tracks and footpaths improvement Guides the woreda technician Arrangements for the execution of works and the preconditions to fulfil indicated Details on the sequence of road construction.
11
Chapter 3.Guideline on RTI Construction and Improvement Pictorial presentations & illustrations for ease of understanding Design & construction of drainage systems & footbridges Methods for improving the existing tracks & paths
12
Chapter 3.Guideline on RTI Construction and Improvement 3.1.Setting-Out (Route Alignment) 3.2.Sequences of Construction Activities 3.3.Improvement of Footpaths 3.4.Retaining Structures 3.5.Hand Tools and Simple Implements 3.6.Construction of Different Types of Cross Drainage Structures
15
Setting Out Horizontal Alignments
16
Vertical Alignment – Step by Step
17
Vertical Curve Alignment Step by Step
18
Sequence of Construction
20
Sample Calculations
21
Slotting Steps
22
Quarrying
23
Footpaths
26
Erosion Control
27
Bioengineering Erosion Control
28
Road gradient (%) Mitre drain intervals Should not exceed (metres) When discharging the water on to piece of farm land 1240*20 to 50 meters wherever possible on to a boundary between farms 1080* 8120* 6160* 4200* 1-250** Table 3.9 Spacing of turnout ditches according to the slope of the ditch *If exceeded, scouring will occur **If exceeded, silting will occur
31
Chapter 4.RTI Maintenance 4.1.Maintenance Purpose and Causes of Road Deterioration 4.2.Maintenance Need Assessment 4.3.Type of road and structure maintenance 4.3.1.Routine maintenance 4.3.2.Periodic Maintenance 4.3.3.Emergency Maintenance
35
Pot-hole & Rut Repair Steps
36
Training of Trainer Personnel on Environmentally Sound Design and Implementation of Public Works- Community Roads of the Productive Safety Net Program (PSNP) June 13-24, 2011 Ghion Ambassel Hotel Dessie, Ethiopia