Mulciber Stove Testing Summary. Testing Overview Six Sampling Periods o Warm-Startup – 5 min. after loading for 15 min. o Warm-Steady State – 50 min.

Similar presentations


Presentation on theme: "Mulciber Stove Testing Summary. Testing Overview Six Sampling Periods o Warm-Startup – 5 min. after loading for 15 min. o Warm-Steady State – 50 min."— Presentation transcript:

1 Mulciber Stove Testing Summary

2 Testing Overview Six Sampling Periods o Warm-Startup – 5 min. after loading for 15 min. o Warm-Steady State – 50 min. after loading for 30 min. o Hot-Startup – 5 min. after loading for 15 min. o Hot-Steady State – 50 min. after loading for 30 min. o Wet-Startup – 5 min. after loading for 15 min. o No Dilution Tunnel Particulates o Wet-Steady State – 50 min. after loading for 30 min. o No Dilution Tunnel Particulates o No Testo Data

3 Testing Methods TESTO g/m 3 g/hr (Estimated) PPM (CO) Efficiency (Estimated) DILUTION TUNNEL g/hr PPM (CO) ◦In the Dilution Tunnel, not the Stack

4 Caveats 1.None of these are official test methods; we aren’t claiming an EPA test 2.No tests were run constantly, we only have snapshots of data 3.Our burn rate was approximately 3.3 kg/hr 4.Our fan pulls in fresh air to cool itself 1.Air is diluted by 1/3 (Approximately 15% Oxygen instead of a more typical 10% in all tests) 2.This impacts PPM and g/m 3 3.This does not change grams per hour

5 Particulates (g/m 3 and g/hr) NOTE: TESTO AND DILUTION TUNNEL APPEAR TO BE COMPARABLE DURING STEADY STATE, BUT NOT DURING START UP. THEORY: THE TESTO DOES NOT CAPTURE UNBURNED HYDROCARBONS. IF THIS IS THE CASE, UNBURNED HYDROCARBONS MAKE UP A SUBSTANTIAL PORTION OF PARTICULATES DURING START UP.

6 Carbon Monoxide (PPM)

7 Efficiency Thermal efficiency estimated based upon heat released and heat lost E=1- (Heat Exhausted/Heat Produced)

8 Overview

9 Category iv NON-CATALYTIC STOVE MAXIMUM BURN RATE RUN #123AVERAGE Date19-May20-May21-May Particulate Emissions Units Concentrationmg/m^36.9336.7477.0376.905 Emissions Rategrams/hr4.2914.1594.3554.268 Emissions Factorgrams/kg1.3991.4221.2691.363 Total Mass Captured mg8.3008.0507.2007.850 Fuel Burn Rates Average Burn Rate kg/hr (dry)2.462.332.572.45 lb/hr (dry)5.435.135.675.41 Fuel Weight and Burn Time Density (dry basis) gm/cm^3N/A Coal Bed Weightlbs6.35.65.15.7 Pre Test Fuel (inc. kindling) lbs28.822.528.326.5 Test Fuellbs24.423.924.2 Burn Timemin213.92219.92190.42208.1 * Sampled in dilution tunnel

10 *15 minute snap shot of steady state sampled directly in stack, not representative of entire burn


Download ppt "Mulciber Stove Testing Summary. Testing Overview Six Sampling Periods o Warm-Startup – 5 min. after loading for 15 min. o Warm-Steady State – 50 min."