Presentation is loading. Please wait.

Presentation is loading. Please wait.

ASSOCIATION OF MUNICIPAL ELECTRICITY UTILITIES OF SOUTHERN AFRICA GOOD HOPE BRANCH: WESTERN CAPE 15 AUGUST 2014: LANGEBERG MUNICIPALITY: ROBERTSON By:

Similar presentations


Presentation on theme: "ASSOCIATION OF MUNICIPAL ELECTRICITY UTILITIES OF SOUTHERN AFRICA GOOD HOPE BRANCH: WESTERN CAPE 15 AUGUST 2014: LANGEBERG MUNICIPALITY: ROBERTSON By:"— Presentation transcript:

1

2 ASSOCIATION OF MUNICIPAL ELECTRICITY UTILITIES OF SOUTHERN AFRICA GOOD HOPE BRANCH: WESTERN CAPE 15 AUGUST 2014: LANGEBERG MUNICIPALITY: ROBERTSON By: Joe Renney & Leon Eksteen

3 OVERVIEW 1.MIG PROJECT NOTICE BOARD 2.MISA 2.MISA CAPACITY BUILDING (COURSES) 3.UMGENI WATER 4.SPORT FIELD LIGHTING: NORMS & STANDARDS 5.HUMAN SETTLEMENTS: NORMS & STANDARDS INTERNAL WIRING / SUBSIDY. 6.MASTER PLANS: R1 M – 2014 7.MIG POLICY REVIEW

4 o

5

6 MISA COURSES ELECTRICAL ENGINEERING COURSES Photovoltaic Solar Systems TBA East London, EC 3 – 4 November 2015 Durban, KZN Technical Writing for Engineers 7 – 8 October 2014 Bloemfontein, FS 3 – 4 November 2015 Kimberley, NC Project Management TBA Durban, KZN 14 – 17 September 2015 Bloemfontein, FS LV Protection TBA Kimberley, NC 22 – 23 September 2015 Durban, KZN Electric Arc Flash Safety TBA Midrand, Gauteng 29 – 30 September 2015 Cape Town, WC

7

8

9 Whatever happened to ? Planning Scheduling Resources Supervision Re-commissioning Close-out

10 UNSAFE WIRING PRACTICES

11 TN-C-S SYSTEM EARTHING T stands for “Terra” which is Latin for “Earth” N means that the connection to “Earth” is via the supply network C stands for “COMBINED” in relation to the neutral & earth S stands for “SEPARATE” …………………. T…….”EARTH” S……”SEPARATE” “COMBINED” N SANS 10142-1 M

12 1.MAINS CONNECTED DIRECTLY ONTO BUSBARS. 2. THIS IS A TN-C-S SYSTEM EARTHING (NO CONNECTION BETWEEN E AND N. 3. 4. & 5. NO PROTECTION FOR CHOKES / BALLASTS. 6 & 7 WIRING ONTO MCB: LINE AND LOAD 8.NO NEUTRAL SURGE PROTECTOR 9.AN EARTH BRIDGE IS REQUIRED FOR THE SPD’s UNSAFE WIRING PRACTICES 11 FAULTS 1.MAIN SUPPLY CONNECTED DIRECTLY ONTO BUSBARS 2.THIS IS A TN-C-S SYSTEM EARTHING. 3.NO PROTECTION FOR CHOKES/BALLASTS (3) 4.INCORRECT WIRING…LINE / LOAD (2) 5.NO NEUTRAL SURGE PROTECTOR 6.A SOLID EARTH BRIDGE IS REQUIRED ON SPD’S 7.NO CONCRETE BASE FOR KIOSK

13

14 MAIN

15 HUMAN SETTLEMENTS NORMS & STANDARDS SUBSIDY VALUE

16 MASTER PLANNING 2014 / 15 BITOU & BERGRIVIER ± R1 m

17 Water and sanitation Roads Solid waste Public services Boxes are not to scale. Implementing agent Municipality Water and sanitation Roads Solid waste Public services Water and sanitation Roads Solid waste Water and sanitation Roads Solid waste Public services Water and sanitation Roads Solid waste Public services Water and sanitation Roads Solid waste Public services Municipality Water and sanitation Electricity Roads Solid waste Public services Water and sanitation Electricity Roads Solid waste Public services Municipality 2.1 Break MIG into sector grants 2.2 Make MIG a Schedule 7 grant 2.3 Ring-fence each MIG component 2.4 MIG for ‘plot package’ only 2.5 Current 2.6 As envisioned in Policy Possibly with inclusion of electricity as well Break up Consolidate Water and sanitation Roads Solid waste Water and sanitation Roads Solid waste Public services Note that ‘Public services’ refer to community services, sports and recreation, emergency services and public transport.

18 Did u know that: 1. The pleasure of making love in the dark is 10 times stronger than when the lights are on? 2. Taking a bath at the same time with your partner increases your love by 20 times?

19 Don't get excited... This is an advert by Eskom & Department of Water Affairs to save Electricity and Water.

20 THANK YOU ?


Download ppt "ASSOCIATION OF MUNICIPAL ELECTRICITY UTILITIES OF SOUTHERN AFRICA GOOD HOPE BRANCH: WESTERN CAPE 15 AUGUST 2014: LANGEBERG MUNICIPALITY: ROBERTSON By:"

Similar presentations


Ads by Google